PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET j
P.O. DOX 8699 PHILADELPHIA. PA.19103 S. J. KOW ALSKl i
VICE PREStOENT
.m..............
Mr. C. E. Rossi, Director Docket No. 50-352 Division of Operational Events Assessment Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Conmission Attn: Doctment Control Desk i
Mall Station P1-137 l
Washington, DC 20555
Subject:
Limerick Generating Station (LGS) Unit 1 NRC Bulletin No. 88-05, Supplement 1 "Nonconfonning Material Supp11ed by Piping Supplies, Inc.
at Folscm, New Jersey and West Jersey Marufacturing Ccrrpany at Williamstown, New Jersey"
Dear Mr. Rossi:
The subject supplement to the Bulletin 88-05, received by Philadelphia Electric Ccmpany on June 22, 1988, requires that ilcensees and construction pennit holders review purchasing records for t
presence of Piping Supplies, Inc. (PSI) and West Jersey Manufacturing Ccrnpany (WJM) supplied materials and ccrimence appropriate testing to determine acceptability of suspect materials.
In response to the Supplement 1 to the Bulletin, Philadelphia Electric Conpany (PECo) has reviewed purchase records for Limerick r
Generating Station to detennine the presence of material frcm PSI and l
WJM. We have determined that suspect material has been received at Limerick Generatlng Station. Upon discovery of the suspect traterial, those ccriponents determined to be in the warehouse were Ininediately segregated and placed on hold. Those ccmponents which are determined to be Installed and accessible in safety related systems will be l
expeditiously tested to assure acceptability In accordance with the l
testing program ed dispositioned as outilnad below.
The subject wpplement delineated speelfic actions to be f
undertaken by the IIcensees. To assure clarity, these actions are restated below along with PECo response to each of those items.
{
1.
Action Requested Review purchasing records to determine whether any PSI or WJM
[*
suppiled ASME Code or ASTM material has been furnished.
Supplement I reduced the scope frcm "materials" to "fittings and flanges".
This review should be init;ated and ccmpleted prcmptly.
p,l!
i l
8807260167 000722 PDR ADOCK 05000352 G
Response
We have nearly ccmpleted our review of purchase records for fittings and flances which may have been purchased frcm PSI & WJM in the form of a bulk purchase or which would have been part of a piping subassently.
Approximately 4000 suspect ccmponents were Identified frcm purchase records. Most of the suspect ccumonents were still stored in the warehouse. As of July 20, 1988, we have determined that 202 suspect ccrmonents have been identified as installed in ASME Section 111 Systems in LGS Unit 1.
The LGS Unit 2 search is ongoing.
2.
Actlon Requested For ASME Code and ASTM materials furnished by PSI or WJM that are either not yet installed in safety-related systans at your facility or are Installed in safety-related systems of plants under construction, the following actions are requested: (perform w lon a and either action b or c).
a.
Provide a IIst of WJM and PSI supplied materials that are found not to be in conformance with the applicable code requirements or procurement specifications and identify the appilcations in wt 3ch these materials are used or will be used.
Include the nuterial specification, the nature of the ccrmonent (e.g., p pe flange), size and pressure rating; also indicate the ( Tain of purchase, and olther, b.
Take actions that provide assurarce that all received nuterials ccmply with ASME Code Section III, ASTM, and applicable procurement specification requirements, or that danonstrate that such materials are suitable for the Intended service. For example, this program should include specifl; verification that austenttic stainless steels have been received in a non-sensitized condition, or, c.
Replace all questionable fittings and flanges with materials that have been nunufactured in full ccmpilance with ASME Code Section III, ASTM, and the appilcable procurement specification requirements.
Supplement 1 reduced the scope of the review f rcm "materials" to "fi tt ings anc' fl anges".
Response
2a.
In conjunction with nut %RC, we are currently developing a nuterial database for PSI and WJM supplied fittings and flanges. The data base will include sweral fields designating rnaterial specifications, nature of ccmponent, size, pressure rating and chain of purchase. The generic format of the rnaterial database was developed by NWARC for rnanber ut i 1 I t ies. Upon ecmpletion of the docurent roview, the requested Information will be sinultaneously tranunttted to the NRC and to nut %RC. We will determine the conformance of the suspect corponent to the appilcable codes via the testing program.
2b. We have developed a testing program to assure conformance of suspect material to the applicable codes or to determine acceptability of the suspect rnatorial using several generic Industry guidelines for testing developed by Nu%RC. Our testing program is a well docunented, quality controlled program which incorporates appropriate controls, check points, data doctmentation, training of personnel and other guidelines established by tu%RC. Additionally, a testing databave has been established per NUPARC guidelines. As results of the testing becane available, the Information will be transmitted to the NRC and to NUMARC.
The testing program will Initially focus on Installed, accessible safety related ccmponents. Hcwever, to assure adequacy of the testing procedure some testing has aircady been conducted on several warehouse flanges. Details of the testing are given in the response to item 3, below.
2c.
PECo will not install corponents which are suspect in LGS Units 1 and 2.
As noted above, a hold was prcmptly placed on all suspect ccmponents. Further, the rnaterial which cannot be determined as adequate to perfonn its required function will be replaced.
3.
Action Requested For ASME Code and ASTM materials furnished by WJM or PSI already installed in safety-related systems in operating plants, the folicwing actions are requested:
a.
Provide a list of the WJM and PSI supplied materials that are found not to be in conformance with the appilcable ccde requirements or procuranent specifications and identify the appilcations in which the materials are used.
Include the material specification, the nature of the carponent (e.g.,
pipe flange), size, and pressure rating; also indicate the chain of purchase.
1 4
b.
Take actions requested in 2b or 2c above. However, an evaluation should be undertaken prior to replacing questionable material in accordance w!th 2c above that considers the occupational radiation exposure that would be received during the replacament process. This evaluation should be considered in develoolng the method and timing of material replacements.
c.
Docunent and maintain for inspection a basis for continued plant operation if the program requested in item 3b has not been completed within 120 days of the date of receipt of this bulletin.
Supplanent I reduced the scope of paragraph 3 of Bulletin 88-08 l
frcm ASME and ASTM "materials" to ASME and ASTM "flanges and fittings".
For-ASME tod ASTM flanges and fittings furnished by PSI and WJM already Installed in safety-related systems in i
l operating plants, the following actions are requested by i
Supplement l'
\\
a.
Conmence appropriate testing of accessible flanges and fittings prcmptly to identify confonnance of materials to l
ASME and ASTM material specifications.
Test results for l
flanges and fittings reported to be frcm the same heat i
4 should be ccmpared for consistency and for confonnance to the ASME/ ASTM specifications and to values listed on i
material CMTRs. Any devlation frcm the specification requires an appropriate analysls justifying continued operation, j
b.
If any inaccessible flanges or fittings are Identified, an analysis trust be perfonned Justifying continued operation, i
j c.
All other provisions of paragraph 3 of Bulletin 88-05 remain in effeet.
l d
Response
B 3a. As stated in item 2 above, we are developing a list of suspect materials. The conformance of suspect materials to the appilcable material codes can be determined via the j
testing progran. Thus far, we have developed and will be implementing a well defined, quality controlled progr6m for testing of suspect materlal in accordance with existing internal PECo procederes and newly deseloped NV %RC generic q
testing guidelines. The testing program will be revised as necessary upon receipt of further NRC or t& ARC guidellnes.
Provisions exist within the established testing database to make the necessary ccmparisons requested by the NRC.
4 i
1 i
m
.m.m.
5-Due to the large nunber of items we cannot comlete testing within the time frame estabilshed by Supplement 1.
We are proceeding with haste to perfonn this testing. However, the need to perform the program in an orderly and controlled fashion places limitations on the rate of testing. A schedule for 100% testing of installed, accessible safety related flanges and fittings is expected to be available by August 1, 1988.
As mentioned earlier, we have cumleted hardness testing on 37 canponents found in the warehouse. The results of the testing are attached in Table 1.
3b. We have Identifled two inaccessible flanges in the spray pond (NRC Notification Nurber LGS 1-88-05-01). A JustIfIcatton for continued operation is being developed for those flanges.
Additionally, we are working with NUMARC on developing a generic methodology for Justifying continued operation. As suspect flanges are Identified as inaccessible, we will notify the NRC within the allocated time frarre and will develop justification for continued operation (JCO).
3c. As requested, JCO's will be developed and maintained for inspec:,lon.
4.
Action Requested For any PSI and WJM supplied materials having suspect CMTRs and used in systans that are not safety-related, take actions camensurate with the function to be performed.
Supplement 1 provides further instructions.
For flanges and fittings already identified as having been supplied by PSI or WJM, the actions requested in 3c and 3d above are to be canpleted within 30 days of receipt of the supplement.
For flanges and fittings identified after receipt of this suppicment, the actions requested in 3a and 3b above are to be camleted within 30 days of identifying the flanges cr fittings as being supplied by PSI and WJM.
Response
As noted in the response to Paragraph 3 above, we cannot canplete the testing within the time period established by Supplanent 1.
The In-situ testing is to begin within the next few days in accordance with the schedule noted in 3a above.
5.
Action Requested Addressees are requested to retain nonconfonning notorials untl1 advised further by the NRC. Nonconforming materials should be segregated to ensure that they are not inadvertently used.
Response
We have segregated and retained the suspect materials as requested above.
6.
Action Requested For operating plants, all scheduled actions should be conpleted before a restart from the next. W outage start.Ing after 180
'is bulletin.
For plants under days from the dat's of receipt construction all scheduled act-2nd the reporting required by 2 below should be ccmpleted prloc w the planned fuel load date.
If any addressee cannot meet this schedule, they should justify to the NRC their proposed alternative schedule.
Supplenent 1 further Instructs:
Addresses are encouraged to report the results of tests
.)
e and WJM supplied flanges and fittings to the INPO Nuclear sork for discussion to the Industry.
Response
As noted earlier, the material and test results are being sent to tO%RC via the INPO Nuclear Network. A written response to the subject NRC Bulletin will be flied with the NRC within 120 days of receipt of the Bulletin.
SuTmary of Responses Philadelphia Electr8, "oupany is conducting 100% review of purchasing docenentation and installation records to detenmine the presence and status of PSI and WJM naterial. A testing program developed in accordance with NtfMRC guidelines is being irrplemented.
Qualltative JCO's are being developed for those flanges reported to be Inaccessible.
Sincerely, t 9 b
p SAT /pdO7208801 Copy to: Addressee W. T. Russell, Region 1 Administrator T. J. Kenny, LGS Unit 1 Senior Resident inspector R. J. Clark, LGS Project Manager Attechnent
g**.,
TABl.E 1 METALLURGY L3BORV.'ORY PROJECT NO.88-422 DATA REPORT EQUOTJP L VALUE L VALUE CONVERTED L VALUE CARDON TO CONVERTED ONE ROCKWELL TO ACTUAL t
PECO NO.
PART 1DENTII'ICATION POLISH B
BRINELL BRINELL AVERAGE SPECIMEN i
1 10" WJ 150-SA105 405.5 77.S 144 159 131 l
6,.
406.1 78.0 144 152 s
l j
Ee FG STD 2
4" WJ 600-SA105 398.4 75.9 139 146
.173 s c.,
393.1 74.3 135 146 E132 XE x
3 4" WJ 150-SA105-CL2 426.4 83.0 159 145 314 I
145 AJ.'.' 5 4 3 5 S T O 431.E E4.2 162 141 f
1 l
. 0 :-
s ca j
p
.j
,...0.., -
c-.:
.....n,
.e.. :,.e : n.:
.I
.c,,
n e
l405.0 l
'7.7 43 I
'5'-
i I
STD 2353 i
i l
t t
i
)
of:-
n 1
.0 t
ans c
l 4 0 c..0 1:.
- ~, u n.-
=0v. =,..r..ux-.ua.
i 153 o
r I
.u s >. c.
f 40e 7
/e.<
..-. B S/100 E l e..o n/cs I
I u
6 24" 150 WJ-SA105 STD 290.0 73.5 a34 140
.200 146 392.3 74.2 135 149 1800 CLD I
147 18C 139 7
24" WJ-150-SA105 397.7 t 75.7 i
. c...)
399.0 75.1 139 153 15533 STD l
l 74.4 135 136
.209 r
I-8 16" PS-150-SA105 393.0 f.
GL2 STD EX11237 Elf 96.2 75.3 137 135 l
l
\\
I
.22e l
El.2 153 16 'j l
9
! iS PS-300-SA105-C;2 416.7 'I 16.:
l
'61 417.0 50.8 166 l
1753 STD 316.5 j
e t
S... e. 1 of 5 1
Date: 07/20/$E i
86-423 DATA REPORT SHEET F.ETALLURGY LABORATORY PROJEC';.NO.
EOUOTIP L VALUE b
L VALUE CO!!VERTED L VALUE CARDON TO CONVERTED ONE ROCKWELL TO ACTUAL t
PECO NO.
PART IDENTIFICATION POLISH B
BRINELL BRI); ELL AVERAGE
' SPECIMEN 10 10" WJ 600-SA105-CLII 389.96 73.5 134 140
.205 t
4
../
225668 S100 B16.5 390.3 73.6 134 137
}
11 6" PS 300-SA105-CL2 398.1 75.8 139 149 178 152 397.4 75.3 137 149 A.3 RS 4 S/40 r
12 6" RJ 300-SA105 401.2 76.7 141 145
.207 r
s e s.
CLL2 160 STD
. 400.9 76.6 140 149 s
I
.:.3 1,
.:i
., 4 2
',.170 i
147
-co f...
3 : e p t, -
i sw v.
f.
147 i
7
~, '. ',
c_--_ _. o. n.,. 0 c ". "s
'.O.,'.O i,
e t
l t
167
-' 3 73.'
135 f
14{
1 I
14 14" WJ 600-SA108 f.
CL2 1858 XE E16.5 393.6 74.6 136 145 l
.223 15 12" WJ 300-SA105 388.8 73.1 132 131 294.5 74.9 137 134 T604343 STD l
16 E" WJ 900-SA105 376.9 70.2 125 ill 155 ses-380.2 70.5 125 131 J
ETH S/120 417.1 80.8 153 159 218 163 17 6" WJ 900-SA105 415,5 80.4 152 167 ETNF :G:
13 IS" WJ 150-SA105 396.4 15.3 137 127 23' 137 l
j 395.1 75.0 137 137 l
i l
l t
3991 STD Shss-2 Of 5 Oate: 07/20/SS
.s METALLURGY LA3 ORATORY PROJECT No.08-423 DATA REPORT SHEC
's EQUOTIP L VALUE L VALUE CONVERTED L VALUE CARBON TO CO)NERTED ONE ROCKWELL TO ACTUAL 1
PECO NO.
PART IDENTIFICATION POLISH B
BRINELL BRINELL AVERAGE SPECIMEN I
l 19 12" WJ 150-SA105 394.1 74.7 137 146
.219 144 M763401 STD 397.4 75.6 138 140 20 8" WJ-900-SA105 392.3 74.2 135 140
.167 143 M763401 STD 397.6 75.3 137 143 r
21 12" 300-SA105-CL2 410.2 79.1 447 151
.216 152 2793 STD B16.5 16 407.5 78.4 144 151 i
i..:
23 1,
147
!.206 i
.- e... :.. r, _
.i..
- e. -
_.e.. ri s I
,,9 46
- ..-w i...
.i7,.
em.p r,.
23 10" WJ 600-SA105 407.6 78.4 145 156
.243 156 CLII 217538 S/100 S15.5 410.2 79.1 147 152 24 S" WJ 900-SA105 366.6.
66.5 119 143 101 146 ETRD S/120 379.4 70.1 125 143 l
25 6" 150-SA105 114A9 STD 413.0 79.8 150 163
.244 159 413.4 79.S 150 163 i
26 10" WN 150-SA105 452.2 88.4 177 163 329 183 22865 STD 444.6 86.9 172 17h 1
27 6" WJ 900-SA105 419.7 61.4 154
- il
.213 Co e ETMF XH 420.7 51.7 155 159
/
_I Shee: 3 cf 5 La:e: 07/20/88
METALLURGY LABORATORY PROJECT 110.86-423 UATA REPORT SHE e
4 EQUOTIP L VALUE L VALUE COtNERTCD L VALUE CARDON TO CONVERTED, ONE ROCKWELL TO ACTUAL 1
PECO NO.
PART IDENTIFICATION POLISH E
BRINELL DRINELL AVERAGE SPECIMEN 28 8" WJ 150-SA105 423.8 82.4 157 170
.297 170 GDJ% STD 421.2 81.8 155 167 29 8" WJ-900-SA105 390.8 73.7 134 146
.172 146 ETRD S/120 385.6 72.3 130 143 i
v 152
.279 30 2" WJ--150-SA105 419.8 81.5 J54 159 scm v s. :. x:
- 3. n. o-gs.7
, c. c.,
-+
-- r.
t l
i
}
. g r.
6 os a
,s e_,.:
- ..z
.se
. : s=
_c... e. v:
167 i
.,.e.
to l
CL2 6 2' 3'/ STD 415.8 E0.4 1:1
'63 32 G" WJ 300-SA105 391.3 73.9 l'5 137 245
,,/
E455% STD 391.9 74.1 135 137 33 6" WJ 200-SA105 386.6.
73.0 132 131
.250 126 H455% STD 388.0 72.9 132 128 i
i 34 6" WJ 300-SA105 433.7 84,6 164 163
.294 159 GDJE STD 410.7 S4.0 162 163 f
35 6" WJ 300-SA105 443.6
!!6.7 171 163
.307 e
167 GDJE STD 439.3 65.6 16E 167 36 6" WJ 300-SA105 429.0 E3.6 161 167
.286 167 426.6 33.1 1%
167 GDJE STD Shee; 4 Of 5 Date: 07/20/93 I
--' ~
P.ETALLURGY LABORATORY PROJECT N0.86-423 DATA REPORT SHEET EQUOTIP L VALUE L VALUE CONVERTED L VALUE CARBON TO CONWRTED ONE ROCKWELL TO ACTUAL PECO NO.
PART IDENTIFICATION POLISH B
BRINELL BRINELL AVERAGE SPECIMEN 37 6" WJ 300-SA105 396.8 76.1 139 152
.288 156 GDJE STD 417.2 80.6 152 156 r
i i
i i
i i
i i
I t
l 1
1 i
.heet 5 of 5 Date: 07/20/E2 i