Forwards Insp Repts 50-348/88-01 & 50-364/88-01 on 880104-07.No Violations or Deviations Noted.Rept Also Details Findings of Repts 50-348/86-05 & 50-364/86-05,which Initially Reviewed Many Allegations
ML20151E525
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/07/1988
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20151E527 List:
References
NUDOCS 8804150289
Download: ML20151E525 (2)


See also: IR 05000348/1988001

Text

a M

- .

APR 0 71988

i

l

l

)

j Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

j Alabama Power Company

i ATTN: Mr. R.~P. Mcdonald

Senior Vice President
P. O. Box 2641

l Birmingham, AL 35291-0400

Gentlemen:

j SUBJECT: HRC INSPECTION REPORT NOS. 50-348/88-01 AND 50-364/88-01

l This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

l P. G. Stoddart and W. B. Gloersen on January 4-7, 1988. The inspection

included a review of activities-authorized for your Farley facility. At the

.

conclusion of the inspection, the findings were discussed with those members of

l

your staff identified in the enclosed inspection report.

.

Areas examined during the inspection are identified in the report. Within

i

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress. The purpose in reviewing the allegations in this

report was to evaluate the technical elements of an allegation, not to

evaluate the aspects of an allegation normally reviewed by the NRC's Office of

) Investigations.

l In addition, this report details findings of Report Nos. 50-348/86-05 and

1 50-364/86-05, which initially reviewed many of these allegations. Specific

l

'

details from that inspection were not included in the report since they may,

at that time, have identified a confidential alleger.

1

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2

Title 10 Code cf Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

$$Y$$0 8

?

\\

t _

w

4

.

Alabama Power Company 2

Should you have any questions concerning this letter, please contact us.

Sincerely,

c~ ~, L $1GNED BY

.

DOXLi' S M. COU M

J. Philip Stohr Director

Division of Radiation Safety

and Safeguards

Enclosure:

Inspection Report

1

cc w/enCI.

l

W. O. Whitt, Executive Vice President '

J. D. Woodard, General Manager -

Nuclear Plant

W. G. Hairston, III, Vice President -

Nuclear Support l

J. W. McGowan, Manager-Safety Audit

and Engineering Review

S. Fulmer, Supervisor-Safety

Audit and Engineering Review '

bec w/ encl:

NRC Resident inspector

DRS Technical Assistant

E. Reeves, Project Manager, NRR

Document Control Desk

State of Alabama

Ril Rll j Ril .

RII ) g

PSto dart JKahle HDance JUr' c DCollins"

'

3/go/88 3/q/88

N

3/p/88 13/> /88

\

3/Q/88 tr[7[f[

w _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _