ML20151E242

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-327/88-14 & 50-328/88-14 on 880208-12.No Violations or Deviations Noted.Requests to Be Informed If Understanding of Documentation of Oral Commitment by Util Representative Differs from Rept
ML20151E242
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/06/1988
From: Barr K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20151E246 List:
References
NUDOCS 8804150159
Download: ML20151E242 (2)


See also: IR 05000327/1988014

Text

_ _ _ . __ _ _ _ _ - __

.l ..' 044ici9l

c ; : f- ,

..

April 6, 1988 ,

!

L

'

Docket Nos. 50-327, 50-328

License Nos. DPR-77, DPR-79

.

Tennessee Valley Authority

ATTN: Mr. S. A. White

Manager of Nuclear Power

-6N 38A Lookout Place

1101 Market Street *

Chattanooga, TN 37402-2801

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-327/88-14 AND 50-328/88-14

.

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

M. S. Lewis on February 8-12, 1988. The inspection included a review of

activities authorized for your Sequoyah facility. At the conclusion of the

inspection, the findings werc discussed with those members of your staff

identified in the 2nclosed inspection report.

Areas examined during the inspection are identified- in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records,- interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

The enclosed Inspection Report documents an oral commitment (see paragraphs 4b,

4g, and 4h) made by a licensee representative and discussed in the exit

interview. If your understanding of this commitment differs from the report

statements, please inform this office promptly.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original /sihed y K. P. Barr)

Kenneth P. Barr, Ach4ag Assistant

Director for Inspection Programs

TVA Projects Division

Office of Special Projects

Enclosure: (See page 2)

8804150159 880406

PDR ADOCK 05000327

G DCD \\

JTso l

-)

i .- ..

,

, ;..

.

Tennessee Valley Authority 2 April 6,-1988

Enclosure:

NRC Inspection: Report

cc w/ encl:

H. L. Abercrombie, Site Director

Sequoyah Nuclear Plant

J. A. Kirkebo, Director,

Nuclear Engineering

R. L. .Gridley, Di rector

Nuclear Safety and Licensing

.M. R. Harding, Site Licensing

Manager

TVA Representative, Rockville Office

bec w/ encl:

J. N. Grace, RII

S. D. Ebneter, OSP

S. D. Richardson, OSP

G. G. Zech, OSP

B. D. Liaw, OSP

W. S. Little, OSP/RII

F. R. McCoy, OSP/RII

R. E. Carroll, OSP/RII

J. B. Brady, OSP/RII

J. Rutberg, OGC

NRC Resident Inspector

DRS Technical Assistant

NRC Document Control Desk

State of Tennessee

RI!

RII ff). RII g 6

MSlew s:er MShymiock FM o'yd CAJ

03/49/88

03Q7/88 03/f/88 3h88 g/[8