ML20151D976

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-313/88-21 & 50-368/88-21 on 880620-24.No Violations or Deviations Noted
ML20151D976
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 07/15/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20151D978 List:
References
NUDOCS 8807250312
Download: ML20151D976 (2)


See also: IR 05000313/1988021

Text

___

_ _ _ _ _ _ _

_

LG4

.f

'

..s

JUL l 5 M B

-In Reply Refer To:

Dockets:" 50-313/88-21-

50-368/88-21

.

Arkansas Power & Light Company

ATTN:

Mr.' Gene Camptell-

Vice President, Nuclear.

Operations

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Messrs. G. A. Pick and R. B. Vickrey

-of this office during-the period June 20-24, 1988, of activities authorized by

NRC Operating Licenses 05'-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2,

and to the discussio" M . r f adings with members of your staff at the

conclusion of the ina.. Lien.

.

Areas examinad during the inspection included licensed operator training,

non-licensed staff training, 2nd quality control training program.

Within

these areas, the inspection con'.isted of selective examination of procedures

and representative reconds, intarviews with personnel, and observations.by the

inspectors. The inspection findings are documented in the enclosed inspection

report.

Within the~ scope of the inspection, no violations or deviations were identified.-

-We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

l

Sincerely,

$$f2j@@@ @@8$$13

[I h$a

O

PNV

L. J. Callan, Director

Division of Rcactor Projects

Enclosure:

Appendix - NRC Inspection Report

w/ attachments

50-313/88-21

50-368/88-21

cc w/ enclosure:

(see next page)

<

RIV:RI:0PS* RI:0PS*

C:0PS*

0:DRS*

C:PSA*

0:DRP

C

GAPick/cz

RBVickrey JEGagliardo JLMilhoan DChamberlain LJCallan J

iardo

/ /88

/ /88

/ /88

/ /88

/ /88

/ /88 4 4 /88

'

I

T10)

.

-

.-

-

--

4

- . .

. .

.

.

..

,

-.

-Arkansas Power & Light Ccapany

-2-

cc w/ enclosure:

Arkansas Nuclear One

ATTN:

J. M. Levine, Director

Site Nuclear Operations

P.O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

^RRI

R. D. Martin, RA

  • RPB-DRSS
  • Section Chief (DRP/A)

Lisa Shea, RM/ALF

  • RIV File
  • DRP
  • MIS System
  • RSTS Operator
  • ProjectEngineer,DRP/A
  • G. Dic<, NRR Project Manager
  • DRS
  • G. A. Pick

G. F. Sanborn, E0

R. B. Vickrey

"J. E. Gagliardo

  • w/766

,