Text
\\
r
'VdilMONT YANKEE 4
-NUCLEAR POWER COIlPORATION RD 5, Box 169 Ferry Road, Brattleboro, VT 05301 p
,,,,y yo p
ENGINEERING OFFICE 1671 WORCESTER ROAD FR AWGHAM, MASSACHUSETTS 01701 July 15, 1988 FVY 88-58 United States Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555
References:
(a) License No. DPR-28 (Docket No. 50-271)
(b) Letter, VYNPC to USNRC, "Surveillance Testing of ECCS and SLC Equipment; Supplement I to Proposed Change No. 85,"
FVY 87-112, dated December 7,1987 (c) Letter, USNRC to VYNPC, "Request for Additional Information - Surveillance Testit.g of ECCS and SLC Equipment (TAC No. 66873)," NVY 8d-077, dated May 9, 1988
Subject:
Vermont-Yankee Response to USNRC Request for Additional Information - Surveillance Testing of ECCS and SLC Equipment (TAC No. 66873)
Deor Sir:
By letter, dated December 7,1987 (Reference (b)], Vermont Yankee submitted the subject amendment request to revise the surveillance / alternate testing requirements of certain engineered safeguards equipment presently specified in the Vermont Yankee Technical Specifications.
Sul.seauently, the NRC staff requested by letter, dated May 9, 1988 [ Reference (c)], additional information necessary to complete their review.
Specifically, the staff requested quantification clarifying the plant safety enhance.ent from the Technical Specification change request and demonstrating the correctness of the proposal.
Accordingly, Vermont Yankee herewith provides as Enclosure 1 to this letter the report, "Impact of Alternate Testing on Component and System Availability," in response to the staff's subject request. This report provides the quantitative basis and documentation for the conclusion that approval of the "schnical Specification amendment request removing the current alternate testing requirements results in a maasurable plant safety enhancement.
l 0
9707 h
O g o d/ f W O ? 2.
fgA APgNA97
/
l Unitid Ststos Nuc1str Riguistory Comlesion July 15, 1^88 Attention: Document Control' Desk-Page 2 We trust that thin, response is satisfactory; however, should you have any questions or require further information, please contact this office.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION fv Robert W. Capstick Licensing Engineer
-RWC/25.704 Enclosure cc: USNRC Region I USNRC Resident Inspector ASLB Service List I