ML20151D722

From kanterella
Jump to navigation Jump to search
Forwards Revised Tech Spec Page Adding Requirement to Verify Proper Operation of Power Disconnect Circuitry on 18-month Basis
ML20151D722
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 07/13/1988
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20151D724 List:
References
NUDOCS 8807250213
Download: ML20151D722 (2)


Text

.

D

..J t-DUKE Powna CVMPANY P.O. HOX IM3180 GEAHLOTTE, N.O. 28242 HAL H. TUCKEN retzenon vwa remarment (704) 073-4531 wws44a emooixvoom July 13,1988 U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555

Subject:

McGuire Nuclear Station Docket Nos. 50-369 and 50-370

-Supplemental Technical Specification Proposal Gentlemen:

By letter dated December 17, 1986, and supplemented February 13, 1987, March 12, 1987, and September 8,1987, Duke submitted proposed changes to the McGuire Nuclear Station Technical Specifications which would change a surveillance requirement for the cold leg accumulator isolation valves to clearly allow the use of a power disconnect switch.

Such a switch has been installed on each McGuire unit such that physically removing the breaker from the curcuit (in accordance with the present specification) is no longer required to er.sure pener is i.emoved from the valve operator.

The NRC staf f has indicated a concern, transmitted by Mr. D.S. Hood (NRC) to Mr. J.B. Day (DPC) in a telecon on April 26, 1988, involved the possibility of an undetected failure in the power disconnect circuitry. While Duke does not believe this to be a problem, Duke has agreed to include an additional surveillance requirement to verify proper operation of the power disconnect curcuitry on an eightesn month basis. The revised proposal page is attached.

No further justification is required as this supplement to the original proposal will only impose an additional surveillance requirement on McGuire to resolve staff concerns.

As this supplements an earlier proposal, no additional fees are required.

Very truly yours, N/Blik M

Hal B. Tucker SAG /126/ bhp

(

Attachment 8807250213 880713 DR ADOCK 05000369 PDC

't.

ti-5.

--Document Control Desk

~ July 13, 1988 Page 2 cc:

Dr. J. Nelson Grace, kigional Administrator U.S. Nuclear Regulatory Commission Region II-101 Marietta St., NW, Suite 2900 Atlanta, Georgia 30323 Mr. Darl Hood Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, SC 20555 Mr.'W. T. Orders NRC Resident Inspector McGuire Nuclear Station 4

..b h

I-L n

~

..n

-n-

.,, -,,,-. ~

v.--

n- - -,, -,, --.

r-,., --,

- - -,n.,,,

- c