Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-277/88-09 & 50-278/88-09
ML20151D577
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/07/1988
From: Ronald Bellamy
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 8807250165
Download: ML20151D577 (3)


See also: IR 05000277/1988009

Text

,_

.

.

-

l

pL

K,

-

.

/

JUL 07 1989

Docket'Nos. 50-277

50-278

.

Philadelphia Electric Company

ATTN: Mr. C. A. McNeill

Executive Vice President-Nuclear

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject:

Inspection 50-277/88-09 and 50-278/88-09

This refers to your letter dated May 16, 1988, in response to our Ictter dated

April-16, 1988.

Thank you for informing us of the corrective and preventive actions documented

in your letter. These actions will be examined during a-future inspection of

your -1icensed program.

Your cooperation with us is appreciated.

Sincerely,

Original Signed By:

Ronald R. Bellamy

Ronald R. Bellamy, Chief

Facilities Radiological Safety

and Safeguards Branch

Division of Radiation Safety

and Safeguards

0FFICIAL RECORD COPY

RL PB 88-09 - 0001.0.0

1l

06/24/88

\\

8807250165 080707

PDR

ADOCK 05000277

O

PNV

o

j'

I.

Philadelphia Electric Company-

2

JUL' 0 7 1988

.

cc w/ enc 1:

John S..Kemper, Sr., Senior Vice President-Nuclear

J. W.~ Gallagher, Vice_ President, Nuclear Services

E. C. . Kistner, Chairman, Nuclear Review Board

Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station

Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.

John F. Franz, Plant Manager, Peach Bottom Atomic Power Station

Troy B. Conner, Jr. , Esquire

W.-H. Hirst, Director, Joint Generation Projects Department,

-Atlantic Electric

Bryan W. Gorman, Manager, External Affairs

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire

~ Thomas Magette, Power Plant Siting, Nuclear Evaluations

-

W.-.M. Alden, Director, Licensing Section

Doris Poulsen, Secretary of Harford County Council

-Dave Honan

Public Document Room (PDR)

Local Public Document Room (LPDR)

. Nuclear SafetyL information Center QSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DRP

PA0 (2) SALP and All Inspection Reports

Robert J. Bores, DRSS

0$

M'* NN

RI:DRSS

RI:DRSS

RI:CRSS

Gordon/ejr

Lazaru

BEllamy

6/3Q88

g/ r/88

y/6/88

, )

0FFICIAL RECORD COPY

RL PB 88-09 - 0002.0.0

06/24/88

_

_

.

  • .

se

'

. . . m

.

.

'

l

PHILADELPHI A ELECTRIC COM PANY

2301 M ARKET STREET

P.O. BOX 8699

PHILADELPHI A. PA 19101

(2:5) 848 soci

10 CPR 2.201

""I;OrN='00"'"

May 16, 1988

vC

,NUCLEAN SE R VIC E S

Docket Nos. 50-277

50-278

Mr. Ronald R.

Bellamy, Chief

Facilities Radiological Safety

and Safeguards Branch

U.S.

Nuclear Regulatory Commission

Region I

Attn: . Document Control Desk

Washington, DC

20555

Subject:

Response to NRC Combined Inspection

Report 50-277/88-09 and 50-278/88-09 for

Peach Bottom Atomic Power Station

Dear Mr. Bellamy:

Your letter dated April 16, 1988 transmitted Combined

Inspection Report 50-277/88-09 and 50-278/88-09 for the routina

emergency preparedness inspection conducted February 29 through March

3,

1988.

Appendix A of your letter identified an item which does not

appear-to be in full compliance with NRC requirements.

Our response

to this violation is provided in an At tachment to this letter.

If you haVe any questions or require additional information,

please do not ht

tate to contact us.

Very truly yours,

Attachment

cc:

Addressee

W.

T., Russell,IAdmi'nistrator, Region I,

USNRC

T.

P.' Johnson, USNRC Senior Resident Inspector

T.

Magette, State of Maryland

"

'

~[ kY

r-

T

C

.

.-?.

.

Attachment

"

Page 1 of 2

.'

Restatement of Violation:

r

'

10 CFR 50.54(t) requires an annual review of the emergency

preparedness program and that the results of the review, along with

recommendatione for improvements, be documented and repotted to the

licensee's corporate and plant management and retained for a period of

,e

five years.

Ccatrary to the above, the licensee did.not mainthin

documentation of the 1983 annual emergency preparedness audit, did not

perform an annual audit during 1985, and did not report the results of

,the 1986 annual audit to appropriate corporate and plant management.

This is a Severity Level IV Violation (Supplement VIII)

Response:

In the following-response, the term "review" refers to the

activities required by 10 CFR 50.54(t), and the term "audit" refers to

the activities required by PBAPS Technical Specification 6.5.2.8.e.

Admission or Denial of the Violation:

Philadelphia Electric Company acknowledges the violation as

stated.

Reason'for the Violation:

The reason for not maintaining documentation of the 1983 annual

emergency preparedness review, not performing an annual review during

1985, and not reporting the results of the 1986 annual review to

appropriate corporate and plant management is that no clear

assignments of responsibility for generation, distribution and

retention of an annual emergency preparedness review existed at the

time.

The 10 CPR 50.54(t) review in 1986 was performed by Enercon

Services under a contract administered by the Emergency Preparedness

Section.

It was felt by Emergency Preparedness after the review was

completed that Emergency Preparedness could not issue the results of

the review because they lacked the required independence.

This

l

situation was not resolved and consequently the distribution was not

completed.

i

l

L

-

. _ _ .

- _ - _ _ _ _ _ _ _ _ _ _ ,

,

,-

l%

hw

'

'

'

Attachment

Page 2 of 2

,

Significance of Violation:

From 1983 through today, PBAPS has demonstrated an adequate

emergency response capability through the effective conduct of drills

and exercises.

The results of the 10 CFR 50.54(t) review performed in

1986 did not identify any significant conditions adverse to the

quality of the Emergency Preparedness Program. -The review stated,.

'"The. Review Team determined, based on the information, facilities

equipment reviewed and the individuals interviewed, that the PBAPS

Emergency Preparedness Program is generally in a state of preparedness

to respond adequately to an emergency."

Further, although reviews

were not performed in accordance with 10 CFR 50.54(t), the annual

audit of the.PBAPS Emergency Preparedness Program as required by the

Technical Specifications has been performed each year.

Corrective Actions Taken and Results Ach}eved:

The failure to maintain documentation of the 10 CFR 50.54(t)

review performed in 1983 and the failure to perform a review in 1985

cannot be retroactively corrected.

The 1986 10 CFR 50.54(t) review

results have been reevaluated by the Emergency Preparedness Section,

and the open items have been distributed to appropriate corporate and

plant management for resolution.

Action plans have been developed for

the' tracking and closure of the items.

Corrective Action Taken to Avoid Future Non-Compliance:

Nuclear Quality Assurance (NQA), formerly the Nuclear

Operations Quality Assurance Division, did complete the 1987 10 CFR 50.54(t) review, and has been assigned the responsibility for the

performance of future reviews and the distribution and retention of

the results.

This group has had the responsibility for the

performance of the audits of the Emergency Preparedness Program as

required by the PBAPS Technical Specifications.

The results of the 10

CPR 50.54(t) reviews will be distributed to appropriate corporate and

plant management.

The findings and associated corrective actions and

recommendations will be dispositioned and tracked in accordance with

Emergency Preparedness Section procedures.

Date When Full Compliance Will Be Achieved:

l

l

The reevaluation of the results of the 10 CFR 50.54(t) review

!

performed in 1986 was completed in January 1988 and individual items

!

were entered into the Emergency Preparedness Action Item Tracking

System.

Completion dates for resolution of all items riot previously

closed were established as of March 31, 1988.

!

9

k