ML20151D539

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses NPF-9 & NPF17,amending Tech Spec 4.8.1.1.2.e.6(c) Re Diesel Generator Trip.Fee Paid
ML20151D539
Person / Time
Site: McGuire, Mcguire  
Issue date: 07/19/1988
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20151D542 List:
References
NUDOCS 8807250154
Download: ML20151D539 (3)


Text

..

m

=

DUKE Pownn GOMPM l'.O. DOX 33180 CIIAltLOTrE, N.O. 28242 IIAL 11. TUGKER Tzt.eenioxz

- runtern (704) om-4501 htELMEPhoDt. W N July 19, 1988 U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555

Subject:

McGuire Nuclear Station Docket Numbers 50-369 and 50-370 Change to Technical Specification 4.8.1.1.2.e.6(c)

Attached is a proposed Technical Specification change to correct Specification 4.8.1.1.2.e.6(c), which requires that certain Diesel Generator (D/G) Trip Functions he bypassed in the event of a concurrent loss of voltage on the emergency bus and a safety injection actuation signal.

The current specification requires that all generator breaker trips, except generator time overcurrent, be verified to be bypassed.

The requirement to test generator breaker trip bypasses is in excess of standard technical specification requirements and is inappropriate.

The generator time overcurrent trip, however, trips the D/G as well as the breaker; therefore. this trip is retained in technical specifications.

A proposed change to Technical Specifications is included as Attachment I.

A justification and safety analysis is contained in Attachment II and a Significant Hazards Analysis pursuant to 10 CFR 50.91 is in Attachment III.

It is requested that this request be processed on an emergency basis.

Attachment IV contains a justification for processing of this amendment request on a emergency basis, as defined by the criteria of 10 CFR 50.91.

This app 11 ation for amendment to Technf.

Specifications is included in the scope of 10 CFR 170.21; therefore, a check in the amount of $150.00 ir.

enclosed.

Very truly yours, M /k l

Hal B. Tucker SAG /128/ bhp l

h00l 8 I w lcbeck

$t @ lo'PR l

l 8807250154 880719 PDR ADOCK 05000369 P

PDC

.e Document Coritrol Desk July 19, 1988 Page 2 xc:

Mr. Darl S. Hood Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Dr. J. Nelson Grace, Regional Administrator U.S. Nuclear R2gulatory Commission

-Region II 101 Marietta St., NW, Suite 2900 Atlanta, Georgia 30323 Mr. W.T. Orders Senior Resident Inspector McGuire Nuclear Station Mr.'Dayne Brown, Chief Radiation Protection Branch Division of Human Resources

' Pott Office Box 12200 Raleigh,' North Carolina 27605 L-l l

l I

.w,

,.,y y

__g

' Docum:nt Control Disk July 19,~1988..

Page 3 HAL B. TUCKER, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Comission this revision to the McGuire Nuclear Station Technical Specifications, Appendix A to License Nos. NPF-9 and NPF-17; and that all statements and matters set forth therein are true and correct to the best of his knowledge.

/k

.s

'Hal B. Tucker, Vice President Subscri*oed and sworn to before me this 19th day of July, 1988, e

bYJ)Y sd ad

( gotiry Publ V ' /

st\\ttilll.

$4.gL.K[;#

. g'.. ' " *...

My Commission Expires:

h yi k

[2l- [ g O T A

-F:

q)c

! - lll lA As

'Qj;;;..g. p%ggf

=

/

- c'

[

l l

l 1

~

l l

i

_