ML20151D410

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation Accepting Util Response to Generic Ltr 83-28,Item 4.5.2 Re Reactor Trip Sys Reliability Online Testing
ML20151D410
Person / Time
Site: Arkansas Nuclear 
Issue date: 07/12/1988
From: Calvo J
Office of Nuclear Reactor Regulation
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20151D411 List:
References
GL-83-28, TAC-53961, NUDOCS 8807250106
Download: ML20151D410 (4)


Text

-y July 12,1988 Docket No. 50-368 Mr. Gene Campbell Vice President, Nuclear Operations Arkanasas Power and Light Company F. O. Box 551 Little Rock, Arkansas 72203

Dear Mr. Campbell:

SUBJECT:

GENERIC LETTER 83-28, ITEM 4.5.2 - REVIEW FOR ARKANSAS NUCLEAR ONE, UNIT 2 (TAC NO. 53961)

We have completed our review of your response to Generic Letter 83-28, Item 4.5.2, Reactor Trip System Reliability, On-Line Testing for Arkansas Nuclear One, Unit 2.

The review of the response, as documented in the enclosed contractor's report (EG&G-NTA-7463), finds your response acceptable.

Our enclosed Safety Evaluation documents our concurrence with the contractor's findings and also finds your response for this item to be acceptable. Please.

note that Item 4.5.3 is included under the same TAC number; so TAC No. 53961 will remain open until Item 4.5.3 is resolved.

Sincerely,

/s/

Jose A. Calvo, Director i

Project Directorate - IV DiviFion of Reactor Projects - III, IV, V and Special Projects

Enclosures:

As stated cc w/ enclosures:

See next page

, DISTRIBUTION l Docket Filec n NRC PDR Local PDR PD4 Reading L. Rubenstein J. Calvo P. Noonan C.

~2rouck OGC-Rockville E. Jordan B. Grimes ACRS (10)

PD4 Plant File ik PD4/LfCP PD4/PM$d M (0 JCalvo /1" PD4/D PNoonad CHarbuck:sr 07/d)/88 07/11/88 07//z./88 l' i g7250106800712 p

ADOCK 05000368 PNu

I July 12,1988 Docket No. 50-368 Mr. Gene Campbell Vice President, Nuclear Operations Arkanasas Power and Light Company P. O. Box 551 Little Rock, Arkansas 72203

Dear Mr. Campbell:

SUBJECT:

GENERIC LETTER 83-28, ITEM 4.5.2 - REVIEW FOR ARKANSAS NUCLEAR ONE, UNIT 2 (TAC N0. 53961)

We have completed our review of your response 9 Generic letter 83-28, Item 4.5.2, Reactor Trip System Reliability, On-t.ne Testing for Arkansas Nuclear One, Unit 2.

The review of the response, as doc r.ented in the enclosed contractor's report (EG&G-NTA-7463), f'. ids your response acceptable.

Our enclosed Safety Evaluation documents our concurrence with the contractor's findings and also finds your response for this item to be acceptable. Please note that Item 4.5.3 is included under the same TAC number; so TAC No. 53961 will remain open until Item 4.5.3 is resolved.

Sincerely,

/s/

Jose A. Calvo, Director Pro,iect Directorate - IV Division of Reactor Projects - III, IV, Y and Special Projects

Enclosures:

As stated cc w/ enclosures:

See next page DISTRIBUTION Docket File NRC PDR Local PDR PD4 Reading L. Rubenstein J. Calvo P. Noonan C. Harbuck OGC-Rockville E. Jordan B. Grimes ACRS(10)

PD4 Plant File PD4/L Q (

PD4/PM d.

JCalvo /1F' PD4/D PNoo W r CHarbuck:sr 07/d2/88 07/11/88 07//t/88 i

8[k%REGO

'o UNITED STATES g

NUCLEAR REGULATORY COMMISSION o

E WASHINGTON, D. C. 20555 g

%, * * *. * [

July 12,1988 Docket No. 50-368 Mr. Gene Campbell Vice President, Nuclear Operations Arkanasas Power and Light Company P. O. Box 551 Little Rock, Arkansas 72203

Dear Mr. Campbell:

SUBJECT:

GENERIC LETTER 83-28 ITEM 4.5.2 - REVIEW FOR ARKANSAS NUCLEA,'. GNE, UNIT 2 (TAC NO. 53961)

We have completed our review of your response to Generic Letter 83-28, Item 4.5.2, Reactor Trip System Reliability, On-Line Testing for Arkansas Nuclear One, Unit 2.

The review of the response, as documented in the enclosed contractor's report (EG&G-NTA-7463), finds your response acceptable.

Our enclosed Safety Evaluation documents our concurrence with the contractor's findings and also finds your response for this item to be acceptable.

Please note that Item 4.5.3 is included under the same TAC number; so TAC No. 53961 will remain open until Item 4.5.3 is resolved.

Sincerely,

' G. &b B

Jose A. Calvo, Director Project Directorate - IV Division of Reactor Projects - III, IV, V and Special erojects

Enclosures:

As stated cc w/ enclosures:

See next page

c Mr. T. Gene Campbell Arkansas Power & Light Company Arkansas Nuclear One, Unit 2 cc:

Mr. Dan R. Howard, Manager Mr. Charles B. Brinkman, Manager Licensing Washington Nuclear Operations Arkansas Nuclear One C-E Power Systems P. O. Box 608 7910 Woodmont Avenue Russellville, Arkansas 72801 Suite 1310 Bethesda, Maryland 20814 Mr. James M. Levine, Executive Director Site Nuclear Operations Mr. Frank Wilson, Director Arkansas Nuclear One Division of Environmental Health P. C. Box 608 Protection Russellville, Arkansas 72801 Department of Health

. Arkansas Department of Health Mr. Nicholas S. Reynolds 4815 West Markham Street Bishop, Cook, Percell & Reynolds Little Rock, Arkansas 72201 1400 L Street, N.W.

Washington, D.C.

20005-3502 Honorable William Abernathy County Judge of Pope Courty Regional Administrator, Region IV Pope County Courthouse U.S. Nuclear Regulatory Commission Russellville, Arkansas 72801 Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Senior Resident Inspector U.S. Nuclear Regulatory Commission 1 Nuclear Plant Road Russellville, Arkansas 72801 Ms. Greta Dicus, Director Division of Environmental Health Protection Arkansas Department of Health 4815 West Markam Street Little Rock, Arkansas 72201 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division 1700 Rockville Pike, Suite 525 Rockville, Maryland 20852

. ~., _ -