a
/
'o UNITED STATES g
NUCLEAR REGULATORY COMMISSION o
WASHINGTON, D. C. 20665
,o SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION SUPPORTING AMEN 0 MENT N0. 78 TO FACILITY OPERATING LICENSE N0. NPF-2 AND AMENCHENT N0. 70 TO FACILITY OPERATING LICENSE NO. NPF-8 ALABAMA POWER COMPANY JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 00CKET N05. 50-348 ANO 50-364
1.0 INTRODUCTION
By letter dated May 10, 1988, as superceded by letter dated May 26, 1988, Alabama Power Company ( APCo) submitted a. request for changes to the Joseph M. Farley Nuclear Plant, Units 1 and 2 Technical Specificaticns.
Tne Amendments revise management titles shown in Technical Specifications, Section 6, Administrative Controls.
The title of Senior Vice President is i
replaced with Vice President-Nuclear.
i 2.0 EVALUATION AND SAFETY
SUMMARY
The following is a brief description and evaluation of the changes proposed by the licensee in a letter dated May 26, 1988, after discussions with the NRC staff:
Technical Specification Sections 6.1.2, 6.2.1.c, 6.2.3.4, 6.5.2.2, 6.5.2.8, 6.5.2.9, 6.5.2.10, 6.6.1, and 6.7.1 would cnange the reference of Senior Vice President to the new title of Vice President-Nutlear.
The requested changes are acceptable since the position of Vice President-Nuclear is a sufficiently nigh corporate level position to implement the responsibilities designated within each of these sections.
Technical Specification Sections 6.5.1.8 and 6.5.3.1.d would be cnanged to delete the requirement that certain items be forwarded to the Senior Vice President (now Vice President-Nuclear) in addition to the Chairman of the Nuclear Operations Review Board.
These changes are acceptable since the Vice President-Nuclear is now the Chairman of the Nuclear Operations Review Board and has assumed the duties previously designated to the Senior Vice President.
Also, we consider the Vice President-Nuclear to be a sufficiently nigh corporate level position, as discussed above.
8807220379 880718 PDR ADOCK 05000348 P
PNU
~
q
. t
3.0 ENVIRONMENTAL CONSIDERATION
These amendments' change recordkeeping, repor, ting, or administrative
. procedures or requirements.
Accordirigly, these amendments meet the eli.
bility criteria -for categorical exclusion set forth in.10 CFR 51.22(c)(gi-10).
Pursuant to 10 CFR 51.22(b) no environmental impact statement,or environ-mental assessment need be prepared in connection with the issuance of
- tnese amendments.-
4.0 CONCLUSION
The Commission made a proposed determination'that this amendment involves no significant hazards consideration which was published in.the federal Register (53 FR 22398) on June 15, 1988,.and consulted with the State of Alabama. No public comments or requests for hearing were received, and the State of Alabama did not have any comments.
l The Staff nas concluded, based on the consideretions discussed above, that: (1) there is reasonable assurance that the health and safety.of the-public will not be endangered by operation in the. proposed, manner, and.
(2) such activities will be conducted in compliance with the Commission's regulations and the issuance of these amendments will.not be inimical to-the ccrmon defense and security or to the health and safety of the public.
Principal Contributors:
F. Allenspach E. Reeves Dated:. July 18, 1988 1