ML20151C597

From kanterella
Jump to navigation Jump to search
Requests Addl Info Re Supplemental Containment Sys (Scs) Project Design and Const Schedule,Including Those Milestones Which Will Require NRC Input.Util Updated SAR Acceptable for Design of Scs
ML20151C597
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 04/06/1988
From: Varga S
Office of Nuclear Reactor Regulation
To: Leonard J
LONG ISLAND LIGHTING CO.
References
NUDOCS 8804130082
Download: ML20151C597 (4)


Text

, - . . -- . _ . .- - - . . ...

April 6, 1988 I

~

Docket No. 50-322 i

'Mr. John D. Leonard, Jr.  !

Vice President-Nuclear Operations j i Long Island Lighting Co. 6

Shoreham Nuclear Power Station  !

l P. O. Box 618, North Country Road l j Wading River, NY 11792 j

Dear Mr. Leonard:

In your letter of March 2, 1988, you submitted the balance of responses to questions raised by the staff in the July 21, 1987 presentation and discussion j 2 on the proposed Supplemental Containment System (SCS). Your original submittal on the proposed SCS was made on August 28, 1987.  !

]

We have completed a preliminary review of the. docketed information regarding ,

the SCS and conclude, as follows:

1. The proposed use of Quality Group D criteria in conjunction with the same seismic design criteria as were used in the design of safety related structures, systems and components as described it, the
Shoreham Updated Safety Analysis Report is acceptable for design of l the SCS. j
2. Authorization to connect and use the SCS when built with the Shoreham plant must await completion of the staff's review. The staff will  :

need to examine in areater detail the interconnection of the SCS with  !

i the Shoreham primary containment and the SCS inspection and [

] maintenance programs. ,

I +

. In addition to the information already submitted please provide a SCS project

{ design and construction schedule including those milestones which will require j NRC input. This will enable us to better schedule staff resources for this j project.

Sincerely,  !

, /s/ l Steven A. Varga, Director ,

Division of Reactor Projects I/II Office of Nuclear Reactor Regulation .

j cc: See next page l 1 )

l DISTRIBUTION i I

. Docket _FileCi

~'

NRC PDR/LPDR PDI-2 Reading SVarga/8Boger i l M0'Brien' SBrown/GRivenbark OGC-WF ACRS (10) l Edordan JPartlow 'r

PDI-2/PM PDI-2/D DRP/

DRE F

)

l SBrown: WButler BBo r JSt hr f///8, 9e ft.t4.

@/1/88 f//88 y/h/88 /88

} /AD EAD/AS

  • I Thadani CMcCra (

/6/88 G/(f/88 j 88041300820eo406 2

, PDR ADOCK 05000322  !

P S PDR l

s

-l a n,

%, UNITED STATES

["

g

.t NUCLEAR REGULATORY COMMISSION WASHINGTON,0, c. 20655 April 6, 1988

+ . . . . ,e Docket No. 50.322 Mr. John D. Leonard, Jr.

Vice President-Nuclear Operations Long Island Lighting Co.

Shoreham Nuclear Power Station P. O. Box 618, North Country Road Wading River, NY 11792

Dear Mr. Leonard:

In your letter of March 2,1988, you submitted the balance of responses to questions raiseo by the staff in the July 21, 1987 presentation and discussion on the proposed Supplemental Containment System (SCS), Your original submittal on the proposed SCS was made on August 28, 1987.

We have completed a preliminary review of the docketed information regarding the SCS and conclude, as follows:

1. The proposed use of Quality Group D c-iteria in conjunction with the same seismic design criteria as were used in the design of safety related structures, systems and components as described in the _

Shoreham Updated Safety Analysis Report is acceptable for' design of l the SCS,  ;

2. Authorization to connect and use the SCS when built with the Shorehan plant must await completion of the staff's review. The staff will need to examine in greater detail the interconnection of the SCS with the Shoreham primary containment and the SCS inspection and maintenance programs.

In addition to the information already submitted please provide a SCS proiect design and ennstruction schedule including those milestones which will require NRC innut. This will enable us to better schedule staff resources for this project.

Sincerely, i

even ,

V argk, Dire r Division of Reactor P , cts I/II Office of Nuclear Rr: actor Regulation ec: See next page I

I J

I Mr. John D. Leonard, Jr. Shoreham Nuclear Power Station Long Island Lighting Company (list 1) cc:

Stephen B. Latham, Esq. Gerald C. Crotty, Esq.

John F. Shea, !!!, Esq. Ben Wiles, Esq.

Tworey, Latham & Shea Counsel to the Governor Attorneys at law Executive Chamber Post Office Rox 308 State Capitol 33 West Second Street Albany, New York 122?a Riverhead New York 11901 Herbert H. Brown Esq.

Alan S. Rosenthal, Esq., Chairman Lawrence Coe Lanpher Esq.

Atomic Safety & Licensing Appeal Board Karla J. Letsche Eso.

U.S. Nuclear Pegulatory Comission Kirkpatrick & Lockhart Washington, D.C. 20555 South Lobby - 9th Floor 1800 M Street, N.W.

Washington, D.C. 20036-5891 W. Taylor Revelty III, Esq.

Hunton & Williams Dr. Monroe Schneider Post Office Box 1535 North Shore Committee 707 East Main Street Post Office Box P31 Richrend, Virginia 23212 Wading River, New York 1179?

Howard A. Wilber Fabian G. Palomino. Esq.

Atomic Safety & Licensing Appeal Board Special Counsel to the Governor Lt.S. Nuclear Regulatory Comission Executive Chamber - State Capitol Washington, D.C. 20555 Albany, New York 1222A Atomic Safety & Licensing Board Panel Anthony F. Earley, Jr., Esq.

U.S. Nuclear Pegulatory Comission General Counsel Washington, D.C. 20555 Long Island Lighting Company 175 East Old County Road Atomic Safety & Licensing Appeal Board Hicksville, New York 11801 Panel U.S. Nuclear Regulatory Commission Mr. Lawrence Britt Washington, D.C. 20555 Shoreham Nuclear Power Station Post Office Box 618 Gary J. Edles Esq. Wading River, New York 11792 Atomic Safety & Licensing Appeal Board U.S. Nuclear Regulatory Comission Martin Bradley Ashare, Esq.

Washington, D.C. 20555 Suffolk County Attorney H. Lee Dennison Building Richard M. Kessel Veteran's Memorial Highway Chairman & Executive Director Hauppauge, New York 11788 New York State Consumer Protection Board Room 1725 Resident Inspector 250 Broadway Shoreham NPS New York, New York 10007 U.S. Nuclear Regulatory Comission Post Office Box B Jonathan D. Fainberg, Esq. Rocky Point, New York 11778 New York State Department of Public Service Regional Administrator Region I Three Empire State Plaza U.S. Nuclear Regulatory Comission Albany, New York I???3 475 Allendale Road King of Prussia, Pennsylvania 19406

( ,

Long Island Lighting Company Shoreham(1)  !

l CC: I Robert Abrams, Esq. Town Attorney  !

Attorney Genera'l of the State Town of Brookhaven  :

of New York 3?32, Route 112 l ATTN: John Corwin, Esq. Medford, NY 11763 '

New York State Department of Law Consumer Protection Bureau l 120 Rroadway 3rd Floor i New York, New York 10271  !

l Mr. Willian Steiger I l Plant Manager ,

Shoreham Nuclear Power Station t Post Office Box 628 ,

Wading River, New York 11792  !

[

MHR Technical Associates 1723 Hamilton Avenue - Suite K San Jose, California 95125 Honorable Peter Cohalan Suffolk County Executive i County Executive / Legislative Building  !

Veteran's Memorial Highway ,

Hauppauge, New York 11788 l Ms. Donna Ross  !

New York State Energy Office Aoency reuilding 2 j Empire State Plaza Albany, New York 12223 Ms. Nora Bredes Shoreham Opponents Coalition 195 East Main Street Smithtowr, New York 11727 Chris Nolin New York State Assembiv Energy Committee 6?6 Legislative Office Building Albany, New York 12248 Peter S. Everett, Esq. )

Hunton & Williams -

2000 Pennsylvania Avenue, NW  ;

I Washington, D.C. 20036