ML20151C495
| ML20151C495 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 04/07/1988 |
| From: | Wiggins J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Murphy W VERMONT YANKEE NUCLEAR POWER CORP. |
| References | |
| NUDOCS 8804130029 | |
| Download: ML20151C495 (6) | |
Text
_
9 "g.
APR 071988 Docket No. 50-271 l
Vermont Yankee Nuclear Power Corporation ATTN:
Mr. Warren P. Murphy Vice President and Manager of Operations RO 5, Box 169 Ferry Road Brattleboro, Vermont 05301 Gentlemen:
Subject:
December 8, 1987 Management Meeting i
This refers to the December 8,1987 management meeting, held at your. request, l
1 in the Region I Office (see Enclosure 1 for Meeting Summary and Enclosure 2 for Agenda), We appreciate your interest in keeping us informed of your initia-l tives, plans and pr Mrities at the Vermont Yankee Nuclear Power Station.
l Thank you for your cooperation and your candid discussion of items of interest.
We look forward to ote r meetings of this type.
l t
Sincerely, L
Or.t-!c.1 U r.3e l
JM u ';. my,, z,,
l I
James T. Wiggins, Chief Reactor Projects Branch No. 3 Division of Reactor Projects 3
Enclosures-1.
Meeting Summary 2.
Agenda 1
r i
f l
i i
L i
I l
I' i
0FFICIAL RECORD COPY HAVERKAMP 153 3/12/88 - 0001.0.0 \\k i
04/06/88 i'
8804130029 880407
., /
PDR ADOCK 05000271
- U i
f P
DCD j
4 i
Vermont Yankee Nuclear Power 2
APR 071988 Corporation cc w/encis:
J. Weigand, President and Chief Executive Officer J. Pelletier, Plant Manager J. DeVincentis, Vice President Yankee Atomic Electric Company R. Capstick, Licensing Engineer, Yankee Atomic Electric Company C. Richardson, Vermont Public Interest Research Group, Inc.
G.-Tarrant, Commissioner, Vermont Department of Public Service P. Agnes, Assistant Secretary of. Public Safety, Commonwealth of Massachusetts Public Document Room (POR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New Hampshire State of Vermont Commonwealth of Massachusetts bec w/encis:
Region I Docket Room (with concurrences)
O. Haverkamp, Section Chief, DRP J. Kaucher, Projact Engineer, DRP G. Grant, SRI - Vermont Yankee (w/ concurrences)
H. Eichenholz, SRI - Yankee V. Rooney, PM, NRR R. Bores, Technical Assistant, DRSS Meeting Attendees (NRC)
- RI:0RP
- RI:0RP
- RI:0RS RI:0RP JKaucher/mjd DHaverkamp RGallo JWiggins 4/ /88 4/ /88 4/ /88 4/ /88 0FFICIAL RECORD COPY HAVERKAMP 153 3/12/88 - 0002.0.0
- See Previous Concurrences 04/06/88
s O
Vermont Yankee Nuclear Power 3
Corporation MR 071988 bec w/encis:
Region I Docket Room (with concurrences)
M. Perkins, Management Assistant, DRMA (w/o encl)
D. Haverkamp, Section Chief, DRP J. Kaucher, Project Engineer, DRP G. Grant, SRI - Vermont Yankee (w/ concurrences)
H. Eichenholz, SRI - Yankee V. Rooney, PM, NRR R. Bores, Technical Assistant, DRSS Meeting Attandees (NRC)
$ f:./
Y fV RI:0RP RI:DRP RI:DRShi..
JWiggins RI:DRP 7
RGa19 JK ocher /mjd DHaverkampj I g (p
g fuj..m T' 4/ /88 4/f/88 4/,$/88 4/ /88 0FFICIAL RECORD COPY HAVERKAMP 153 3/12/88 - 0003.0.0 04/04/88
[
ENCLOSURE 1 Meeting Summary - December 8, 1987 1.
Attendees Vermont Yankee Nuclear Power Corporation E. V. Bowman, Senior Control Room Operator G. A. Johnson, Operations Supervisor E. V. Lindamood, Operations Training Supervisor W. P. Murphy, Vice President and Manager of Operations R. W. Spinney, Training Manager U.S. Nuclear Regulatory Commission D. J. Florek, Senior Operations Engineer, BWR Section, Division of Reactor Safety (DRS)
R. M. Gallo, Chief, Operations Branch, DRS
- 0. R. Haverkamp, Chief, Reactor Projects Section No. 3C, Division of Reactor Projects (DRP)
R. M. Keller, Chief, PWR Operations Section, DRS D. J. Lange, Chief, BWR Operations Section, DRS W. Oliveira, Reactor Engineer, Operations Programs Section, DRS J. T. Wiggins, Chief, Reactor Projects Branch No. 3, DRP 2.
Details Vermont Yankee Nuclear Power Corporation (VYNpC or the licensee) discussed the protocol in the VYNPC organization and the interface for correspond-ence and the dialogue between the NRC and Vermont Yankee Nuclear Power Station (VYNPS or Vermont Yankee) facility personnel. The licensee indi-cated that it did not contest the results of the replacement examination ddministered in August 1987 and requested a re examination date be scheduled in January 1983 for those candidates who failed that examina-tion.
The licensee discussed the possibility of using a computerized form for future submittal of operator license applicant information.
The licensee discussed its requalification training program, including accelerated emergency operating procedure treining, a block training con-cept and the impact on licensed operators during simulator training. The licensee indicated that increased training on normal operations and miti-gation of abnormal transients should be expanded into the requalification training program and the majority of simulator training should not be spent only on emergency procedures. Also, the licensee requested an up-date on the status of revisions to the NRC requalification effort and its effect on the Vermont Yankee requalification progran.
2 The NRC commented on the re-organization of the NRC Region I Operator Licensing Section and its function. The NRC discussed the requirement for a continuous requalification training program and commented that a i.nange to decrease the scope of the curr(nt Vermont Yankee program must be reviewed and approved by the Office of Nuclear Reactor Regulation (NRR) through the NRR Project Manager.
Also, an explanation of the current status of the NRC requalification revision was presented by the Operator Licensing Section Chief.
The NRC acknowledged the concern expressed by VYNPC personnel on emergency operating procedure training and commented that the simulator training should encompass the normal, abnormal and emergency training required for safe operation of the plant.
The NRC scheduled a tentative examination date, in January 1988, for a re-examination of those candidates failing the August examinations.
N
,,'/
ENCLOSURE 2
.o s
VERMONT YANKEE MEETING WITH NRC December 8, 1987 King of Prussia, PA AGENDA Training and operator Licensing Topics I.
ORGANIZATIONS A.
Protocol in VY Organization 8.
VY/NRC-Region I Interface VY TRAINING A.
Requalification 8.
Emergency Operating Procedures C,
Block Training Concept I!!. OPERATOR LICENSING A.
396 & 398 Forms 8.
Entry Level Requirements C.
Issues Related to 1987 Operator License Exams 4
9 "
e