Jun i i M LYNN W. EURY SERIAL: NLS 88 145 sena v ce PresWnt 10CFR50 '*
88TSB11 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 & 50-324/ LICENSE NOS. DPR-71 & DPR-62 REQUEST FOR LICENSE AMENDMENT INDEX REVISION Centlemen:
In accordance with the Code of Federal Regulations, Title 10, Parts 50.90 and 2.101, Carolina Power & Light Company (CP&L) hereby requests a revision to the Technical Specifications for the Brunswick Steam Electric Plant (BSEP), Units 1 and 2.
The proposed changes revise the titles listed in the index section-of the Technical Specifications to be consistent with the titles shown in the text.
This submittal also revises two titles provided in the text for consistency with Technical Specifications of the other unit.
These changes are considered administrative changes. provides a detailed description of the proposed changes and the basis for the changes. details the basis for the Company's determination that the proposed changes do not involve a significant hazards' consideration. provides instructions for incorporation of the proposed changes into the Technical Specifications for each unit. provides a summary of the proposed Technical Specification changes for each unit on a page by page basis.
Enclosures 5 and 6 provide the proposed Technical Specification pages for each unit respectively.
'\\
y\\ g hgd
~
V e
88072h$$k88071105000324 PDR PDC P
a Documsnt Control Dssk NLS-88 145 / Page 2 In accordance with the requirements of 10CFR170.12, a check for $150.is also enclosed.
In order to allow time for procedure revision and orderly incorporation into copies of the Technical Specifications, CP&L requests that the proposed amendments, once approved by the NRC, be issued with an effective date to be no later than 60 days from the issuance of.the ainendment.
Please refer any questions regarding this submittal to Mr. Stephen D.
Floyd at (919) 836-6901.
Yours very truly,
/
L. W. Eury BAB/bab(\\cor\\88tsbil)
Enclosures:
1.
Basis for Change Request 2.
10CFR50.92 Evaluation 3.
Instructions for Incorporation 4.
Summary List of Revisions 5.
Unit 1 Technical Specification Pages 6.
Unit 2 Technical Specification Pages cc:
Mr. Dayne H. Brown Dr. J. Nelson Grace Mr. W. H. Ruland Mr. E. D. Sylvester L. W. Eury, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power &
Light Company.
C Niitary (Saal)
,,,.ese,r.,,,
My commission expires: // A 7 d
/
t
/ NOTARY \\
i i l-)ff!
., PUBLIC,/ c
,,;'f,,............ + /
...... 1
- ,, C..OUt6.,k
~
1 8
ENCLOSURE 1 BRUNSWICK STEAM ELECTRIC PIANT, UNITS 1 AND 2 NRC DOCKETS 50-325 & 50-324 OPERATING LICENSES DPR-71 & DPR.62 REQUEST FOR LICENSE AMENDMENT BASIS FOR CHANGE REQUEST Proposed Change Revise the indices of the Technical Specifications to be consistent with the content of the text and revise two titles in the text to be consistent with the other unit and the indices.
Basis The Company has noted that the indices for the BSEP Technical Specifications do not, in all cases, accurately represent the information provided in the text of the document.
In some cases, the titles of the sections are inconsistent; in others, the page numbers provided are incorrect.
In one case, the section number listed is incorrect, and, once corrected, that section need not be referenced in the index at all.
This change is purely administrative. There is no change to the text of the Technical Specifications; only the index and two titles in the text are being changed for consistency.
There are no modifications or design changes involved.
The sole purpose of this request is to provide consistency between the index section of the Technical Specifications and the text of the document.
l J
El-1
-f 9
ENCLOTURE 2 BRUNSWICK STEAM ELECTRIC PIANT, UNITS 1 AND 2 NRC DOCKETS 50-325-6 50-324 OPERATING LICENSES DPR-71 & DPR-62 REQUEST FOR LICENSE AMENDMENT 10CFR50.92 EVALUATION The Commission has provided standards in 10CFR50.92(c) for determining whether a significant hazards consideration exists. A proposed amendment to an operating license for a facility involves no significant hazards censideration if operation of the facility.in accordance with the pronosed amendment would not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the~ possibility of a new or different kind of accidant from any accident previou'ly evaluated, or (3) involve a significant reduction in a margin of safety. Carolina Power & Light Company has reviawed this proposed license amendment request and determined that its adoption would not involve a significant hazards consideration.
The bases for this detarmination are as follows:
Eroposed Change Revise the indices of the Technical Specifications to be consistent with
)
the content of the text and revise two titles in the text to be consi. stent with the other unit and the indices.
Basis i
The change does not involve a significant hazards consideration for the
)
following reasons:
{
1.
The proposed amendment is purely administrative in nature and does not change the function or design of any equipment.
Its sole purpose is to provide consistency between the text and the indices of the Technical Specifications.
Therefore, it does not involve a significant increase in the probability or consequences of an accident previously evaluated.
2.
The proposed amendment does not change the design or function of any equipment and has no impact on any accident analyses.
The i
changes are being made for consistency only and can clearly be classified as administrative.
Therefore, the proposed change will not create the possibility of a new or different kind of accident from any accident previously evaluated.
3.
The proposed amendment does not impact any safety analyses because it is purely administrative in nature.
No modification or change to equipment is involved.
Therefore, the proposed change does not involve a significant reduction in the margin of safety.
E2 1
e ENCIDSURE 3 BRUNSWICK STEAM ELECTRIC PIANT, UNITS 1 AND 2 NRC DOCKETS 5C-325 & 50 324 OPERATING LICENSES DPR-71 & DPR-62
- REQUEST FOR LICEliSE AMENDMENT JESTRUCTIONS FOR INCORPORATION-The proposed changes to the Technical Specifications (Appendix A to Operating Licenses DPR-7:. and DPR-52) would be incorporated as follows:
UNIT 1 Remove Page Insert Pace III III IV IV V
V VII VII VIII VIII IX IX IXa IXa X
X XI XI XII XII XIIA XIIA XIV XIV XV XV XVI XVI 3/4 11-9 3/4 11-9 B 3/4 5-4 B 3/4 5 4 6-9 69 t
l l
l
e UNIT 2 Remove Page Insert Page III III IV IV V
V VI VI VII VII VIII VIII IX IX IXa IXa X
X XI XI XII XII XIIA XIIA XV XIV XV
?V XVI 3/4 1-13 3/4 1 13 B 3/4 5-4 B 3/4 5-4 3/4 11-9 3/4 11-9
{
1 l
l I
1 l
j i
.y e-ENCLOSURE 4 BRUNSWICK STEAM ELECTRIC PIANT, UNITS 1 AND 2 NRC DOCKETS 50-325 & 50-324 OPERATING LICENSES DPR-71 & DPR-62 REQUEST FOR. LICENSE AMENDMENT
SUMMARY
LIST OF REVISIONS UNIT 1 Pages Qasstiption of Channes III Refornnt for consistency.
IV -
Revise a title under Item 3/4.1.3 from "Four Control Rod Group Insertion Times" to "Four Control _ Rod Grcup Scram Insercion Times" and add a title under Item 3/4.1.3, "Control Rod Drive Housing Support."
V Revise the title of Item 3/4.3.7 to "Reactor Core Isolation Cooling System-Actuation Inst::umentation" and revise the word "St3raup" to "Start-up" in the title "Idle Recirculation Loop Startup" under Item 3/4.4.1.
VII Revise a title under Item 3/4.6.2 from 1
"Suppression Pool" to "1uppression Chamber."
i VIII Revise the title of _ em 3/4.7.5 f. m "Hydraulic Snubbers" to "Snubbers," and revise a title under Item 3/4.8.2 from "RPS Electrical Power Monitoring" to "Reactor Protection System Electrical Power Monitoring."
IX Reformat for connistency.
IXa Reformat for consistency.
X Reformat for consistency.
XI Revise the title of Item 3/4.5 from "Emergency Core Cooling Systems" to "Emergency Core Cooling System," and revise the title of 3/4.5.2 from "Auto 7atic Depressurization System" to "Automatic Depreusurization System (ADS)."
L
Pages Descriobion of Changea XII Revise the title of Item 3/4.7.5'from "Hydraulic Snubbers" to "Snubbers" and replace references to Page B 3/4 9 1
- ith ' references to Page B 3/4 9-2 in n
Items 3/4.9.6 and 3/4.9.7.
XIIA Revise a title under Item 3/4.11.1 from "Liquid Waste Treatment System" to "Liquid Radwaste Treatment System"~and replace references to Pages B 3/4.11-4, B 3/4 11-5, and B 3/4-11-6 with' references to Pages B 3/4 11-5, B 3/4 11-6, end B 3/4 11-7, respectively.
1 XIV Revise the title of Item 6.2.3 from "Onsite Nuclear Safety Group" to "Onsite Nuclear Safety Group (ONS)," revise the title of Item 6.3 from "Facility Staff Qualifications" to "Facility Staff Qualificatien," and revise the title of Item 6.5.2 from "Safety Evaluations and Nuclear Review Control" to "Safety Evaluations and Independent Review Control."
i XV Reformat for consistency.
XVI Reformat for consistency.
3/4 11-9 Revise the heading from "Liquid Radsaste Treatment" to "Liquid Radwaste Treatment System."
B 3/4 5-4 Revise the item number from 3/4.5.3.1 to 3/4.5.4.
]
1 69 Reviis the title of Item 6.5.2 from "Safety Evaluations and Nuclear Revicw Control" to "Safety Evaluations _and Independent Review Control."
-l 1
B
~.
e UNIT 2 Pages Descriotion of Channes III Replace references to Pages r 2 8 and B 2-9 with references to Pages B 2-3 and B 2-4, respectively.
IV Revise two titles under Item 3/4.1.3; "Four Control Rod Group Insertion Times" l
with "Four Control Rod Group Scram Insertion Times."
V Revise a title under item 3/4.3.6, "ATWS Recirculation Pump Trip System Instrumentation" to "ATWS Recirculation l
Pump Trip (RPT) System Instrumentation,"
l revise the title of Item 3/4.3.7 from "Reactor Isolation Cooling system Actuation Instrumentation" to "Reactor Core Isolation Cooling System Actuation l
Instrumentation," revise the word "Startup" to "Start-up" in a title under Item 3/4.4.1, and revise a title'under Item 3/4.4.3, "Leakage Detection System," which is currently on Page VI, to "Leakage Detection Systems" and move l
Item 3/4.4.3 to this page.
l l
VI Reformat for consisteacy and to i
accommodate movement af text to the l
previous page and from the following page.
VII Revise a title under Item 3/4.6.2, l
"Suppression Pool" to "Suppression I
Chamber," revise a title under Item 3/4.6.4, "Drywell - Suppression Pool Vacuum Breakers" to "Drywell -
Suppression Chamber Vacuum Breakers" and j
move the remaining items under Item 3.4.6 to the previous page.
VIII Move Items 3/4.7.2 and 3/4.7.3'to the previous page, revise the title of Item 3/4.7.5 from "Mydraulic Snubbers" to "Snubbers" and revise a title under Item 3/4.8.2 from "RPS Electric Power Monitoring" to "Reactor Protection System Electric Power Monitcring."
IX Move Item 3/4.9.2 to the previous page.
IXa Reformat for consistency.
o
e Pages Descriotion of Changes X
Revisc'the title of Item 3/4.1.5 from "Standby-Liquid Control-System" to "Standby Liquid Control System."
XI Reviso the title of Item 3/4.5 from "Emergency Core Cooling Systems" to.
"Emergency Core Cooling System," ano-revise the title of 3/4.5.2 from "Automatic Deprecsurization System" to I
"Automatic Depressurization Systam-(ADS)."
XII Revise the-title of Item 3/4.7.5 from "Hydraulic Snubbers" to "Snubbers,"
replace references to Pages B 3/4 7-3 and P. 3/4 7 4 with references to Pages B 3/4 7-4 and B 3/4 7-5, respectively under Item 3/4.7, and replace the reference to Page B 3/4 10-5 with-Page B 3/4 10-1 in Item 3/4.10.5.
XIIA Replace references to Pages B 3/4 11 4, B 3/4 11-5, and B 3/4 11-6 with references to Pages B 3/4 11 5, B 3/4 11-5, and B 3/4 11-7, respectively.
XIV Revise the title of Item 6.2.3 from "Onsite Nuclear Safety Group" to "Onsite Nuclear Safety Group (ONS)," revise the title of Item 6.3 from "Facility Staff Qualifications" to "Facility Staff Qualification," and revise the title of Item 6.5.2 from "Safety Evaluations and Nuc1 car Review Control" to "Safety Evaluations and Independent Review Control."
XV Reformat for consistency.
XVI Reformat for consistency.
3/4 1-13 Revise the heading from "Control Rod Housing Support" to "Control Rod Drive Housing Support, and revise the applicability statement to read "Operac.onal Conditions 1, 2, and 3."
B 3/4 5-4 Revise the item number from 3/4.5.3.3 to i
3/4.5.4.
3/4 11-9 Revise the heading,from "Liquid Radwaste Treatment" to "Liquid Radwaste Treatment System."