ML20151C181

From kanterella
Jump to navigation Jump to search
AO 73-24:on 730927,MSIVs NS04A & NS04B Leakage Failed to Meet Acceptable Tech Specs Limit.Caused by Faulty Valve Packing.Valve Packing Repaired.Corrective Action to Be Determined Upon Investigation
ML20151C181
Person / Time
Site: Oyster Creek
Issue date: 09/28/1973
From:
JERSEY CENTRAL POWER & LIGHT CO.
To:
References
AO-73-24, NUDOCS 8103040939
Download: ML20151C181 (2)


Text

.

i b

^'

Rcport No. 73-24 -

t. .

SUPJrcr: Violation of the Technical Specifications, p.$rograph 1',15,B, failure of M. sin stenn Isoistion' valves NSO4A and NSO4B to neet acceptsble Icaknge as ipecified in Teclinical Specification

~

' 4.5.F.1.D. , ,

This event is considered to be an abnomal occurrence sis de-fined in the Technien1 Specifications, paragraph l'.'15.E.

Noti-fication of this event is required by the Technical. Specifications, patograph 6,6,2.a, was nade to AEC Region 1, Directorate of Regulatory Operations, on Friday, Septerher 28, 1975, at 3:50 p.m.,

and by teh oopior on Friday, Septe:Jher 28, 1973, at 5:00 p.m.

SITUATION: At .1801 on Septerber 27, 1973, Pain Stean Isolation Valve NSO4B was tested for leskage and the Ieskage was ceasured to be approxicately 15.15 SCFil. .

At 2035 on Septecher 27,1973, .Hain $ teen Isolation Valve NSO4A was tested for Icakage and the Icakage was neasured to be approxinately 96,59 SCFH.

[

150th valves, NSO4A and N5048, were operated following the rvsetor l shutdonp and prior to being checked for Icakage. Operation of the valves during the f.hutdown was required to allow odequate THIS DOCUMENT CONTAINS P00R QUAUTY PAGES

l' i .

H main etcam

- ventilation {' the reactor vessel, through

Jines, shile perfonaing maintenance on NS03B, in order to minimize radiogas concentrations in the dryve11. i C4tGB : Leaksge psf.t the valve packing was detected on both NSO4A and.

N504B which contributed substantially to the Icak rate. -Repairs to the packing and a rotest of the volvee. {s required to deter-mine whether any other cause contributed to the excessive valve leakage.

RD'EDI AL ACi'70#:

To be deternined. .

SAFETY yIMIFIC).NCE:

To be submitted following evA7ustion, i

l Prepared by: AW, Date: NVQ3 s

. 1

,as ..

. e g.e , g g .g- ,

"% .