ML20151C146
| ML20151C146 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 04/01/1988 |
| From: | Johnston W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20151C149 | List: |
| References | |
| NUDOCS 8804120184 | |
| Download: ML20151C146 (2) | |
See also: IR 05000213/1987028
Text
'
' '?
'
.
.;
)(
J
'
'
,v
.-
01 APR 1988
Docket No. 50-213
Connecticut Yankee Atomic Power Company
ATTN: Mr. E. J. Mroczka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06141
Gentlemen:
Subject:
Inspection Report No. 050-213/37-28
Enclosed is the subject report of the NRC team inspection conducted by
Mr. R. J. Paolino and other NRC inspectors and contract personnel on November
16 - 20, 1987 at the Connecticut Yankee Atomic Power Company Corporate Office
in Berlin, Connecticut and a one day verification inspection at the Haddam Neck
facility, located in Haddam Neck, Connecticut of activities authorized by NRC
License No, DPR-61.
The team's findings were discussed with you and members of your staff at the
conclusion of the inspection.
The inspection reviewed your implementation of
a program for establishing and maintaining the qualification of electric
equipmen,t within the scope of 10 CFR 50.49. Within these areas the inspection
consisted of examination of selected procedures and records, interviews with
personnel, observations and a physical walkdown verification of specific
electrical equipment selected from the EQ Master List.
Based on the results of this inspection, we have determined that you have
implemented a program to meet the requirements of 10 CFR 50.49; however, it
appears that some of your activities were not conducted in full compliance with
i
NRC requirements as set forth in the Notice of Violation, enclosed herewith as
,
Appendix A.
The violations have been categorized by severity level in accordance
'
with the General Statement of Policy and Procedure for NRC Enforcement Actions,
i
10 CFR 50, Part 2, Appendix C.
You are required to respond to this letter and in preparing your response, you
should follow the instructions in Appendix A.
The responses directed by this
letter are not subject to the clearance procedures of the Office of Management
and Budgets as required by the Paperwork Reduction Act of 1980, PL-96-511.
I
d)
0FFICIAL RECORD COPY
IR HN 87-28 - 0001.0.0
8804120184 8804o1
03/24/88
ADOCK 05000213
Q
.
.s'
'
.
. , -
,
Connecticut Yankee Atomic
2
Power Company
-
Your cooperation with us in this matter is appreciated. We are available to
discuss any questions you may have concerning this inspection.
Sincerely.
031G"UL ! ""' IY
%!U U
V..'..:.s.'sil
William V. Johnston, Acting Director
Division Reactor Safety
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I, Inspection Report No. 50-213/87-28
cc w/ enc 1:
D. B. Miller, Station Superintendent
D. O. Nordquist, Manager of Quality Assurance
R. M. Kacich, Manager, Generation Facilities Licensing
W. D. Rombo g, Vice President, Nuclear Operations
Gerald Garfield, Esquire
Public Document Room (POR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
I
bec w/ enc 1:
Region 1 Occket Room (with concurrences)
Management Assistant, ORMA (w/o enc 1)
Section Chief, CRP
W. Raymond, SRI, Millstone 1&2
A. Wang, LPM, NRR
R. Bores, DRSS
U. Potapvos, DVIB/HQ
1
D. Halody, RI
Coordinator, CD/TI
-
RI:DRS
RI:6T
RI:0RS
Paolino rw
Anderson
Durr
3/Af/83
3/21/88
3/fo/88
a
i
0FFICIAL RECORD COPY
IR HN 87-28 - 0002.0.0
03/24/88
-