ML20151C004

From kanterella
Jump to navigation Jump to search
Forwards Suppl to Consultants Re Review of Diesel Generators at Plant
ML20151C004
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/06/1988
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Bernthal, Roberts, Zech
NRC COMMISSION (OCM)
Shared Package
ML20151C007 List:
References
RTR-REGGD-01.108, RTR-REGGD-1.108 NUDOCS 8804120090
Download: ML20151C004 (1)


Text

-

E

,, .+ ,

Failure Anal.vsis J

. Associates, \vantnus

": = um.,c L_ ..,_nncts March 28, 1988 Mr. Angelo Marinos US Nuclear Regulatory Commission Washington, DC a

Sub: Sequoyah Nuclear Plant (TVA)

Ref: Our letter dated March 25, 1988

Dear Mr. Marinos:

Enclosed please find a supplement to our letter dated March 25, 1988 on the subject of the Sequoyah Nuclear Power Plant Diesel Generators (TVA). This supplement replaces item 4 entitled "Tests on Diesel Generators" of our above letter. This supplement clarifies the above letter with regard to the tests required by Reg. Guide 1.108.

Sincerely yours, i

A. Kusko c

(& 04 W S.M. Peeran

KUSKO ELECTRICAL DIVISION 4

BN60245 AK:ema Enclosures I 8804120090 080406 PDR ADOCK 05000327 p PDR y

W k FW e e f l

.-