ML20151B706
| ML20151B706 | |
| Person / Time | |
|---|---|
| Site: | 05000604 |
| Issue date: | 03/31/1988 |
| From: | Bell D ALL CHEMICAL ISOTOPE ENRICHMENT, INC. |
| To: | Thompson H NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML20151B709 | List: |
| References | |
| 29191, NUDOCS 8804110157 | |
| Download: ML20151B706 (2) | |
Text
e g)
.TO' 3 hh AEhearE, Drc.
All Chemical isotope Enrichment, Inc.
[8-g[g?/[
March 31, 1988 5
=
Docket No: 50-604 U.
S.
Nuclear Regulatory Commission 4
Document Control Desk Og Office Nuclear Safety & Sa feguards l;
Z Washington, D.C.
20555
)p 9
Attention:
Mr. Hugh L.
Thompson, Jr.
j 55396-MNSS-Dockat Material Or _,
Reference:
NRC letter dated March 23, 1988, A IThomas Clark, Jr. to AlChemIE, Inc.,
D.
L.
Pall.
Gentlemen:
The above referenced letter requests that additional information i
be provided by A1ChemIE in support of our request for an exemption from the requirement of obtaining a construction permit prior to starting construction activities on a temporary storage area.
The following provides the information requested in the third,
- fourth, and fifth paragraphs of the referenced letter.
In response to the third paragraph the specific activities to be undertaken relative to the construction of the storage facilities would be s,f. t e grading, pouring of two slabs for classified and unclassif; ed equipment storage, construction of a l
steel framed building with aluminum siding and roof for classified equipment sto age and a perimeter security fence.
In 10CFR50.10(c) the proposed initial construction activity would be permissible under paragraph (3).
l l
In response to your request contained in the fourth paragraph of the referenced letter, please find attached a letter from the Town of Oliver Springs.
This letter confirms the Town's intent to develop the site as a general industrial park independent of AlChemIE's activities.
8804110157 880331 PDR ADOCK 05000604 ff l
A PDR Pine Ridge Office Park. Suite 202-B 702 lilinois Ave., Ook Ridge TN 37830 (615) 482-002?
l L
Mr. Hugh L.
Thompson, Jr.
March 28, 1988 Page 2 In response to the fifth paragraph it can be pointed out that in the event that the proposed A1ChemIE facility was not constructed at this site the storage areaa could be sold to another private corporation locating in the industrial park.
In addition the storage areas could be returned to their original use as pasture land by removing the storage building, the concrete slabs and the fencing.
Should you have any questions or require additional information, please call Mr. W.
A.
Pfeifer at AlChemIE, Very truly yours, ALCHEMIE, INC.
xi b,
Dennis L.
Bell Chief Executive Officer DLB/bjc cc:
A. Thomas Clark. Jr./NRC f
l i