JUL ~ 81988 In Reply Refer To:
Docket:
50-382 Louisiana Power & Light Company ATTN:
J. G. Dewease, Senior _Vice President Nuclear Operations 317 Baronne, Street New Orleans, Louisiana 70160 Gentlemen:
SUBJECT:
SUBMITTAL OF QUALITY ASSURANCE PROGRAM FOR PLANT OPERATIONS
References:
(a) LP&L Letter W3P87-2060, dated October 1, 1987;
Subject:
Waterford 3 SES Docket No. 50-382 Updated QA Programs (b) LP&L Letter W3P88-0967, dated April 7, 1988;
Subject:
Waterford 3 SES Docket No. 50-38?
Updated QA Program (c) NRC Region IV Letter L. J. Callan to J. G. Dewease, dated April 20, 1988;
Subject:
Submittal of Quality Assurance Program for Plant Operations (d) LP&L Telecopy of May 10, 1988, to Region IV Reference (a) forwarded a change to your Quality Assurance Program for Plant Operations. A meeting was held on December 21, 1987, between your Quality Assurance personnel and the Region IV reviewer to discuss specific changes requiring clarification.
Your personnel indicated that these clarifications would be considered, and basically incorporated.
Reference (b) contains those I
clarifications, some of which respond to comments fortnally transmitted by l
reference c.
Reference (d) correlated reference (b) to the coninents made in reference c.
We have reviewed references (a), (b), and (d) and find that they satisfy the requirements of 10 CFR Part 50, Appendix B, and that reference (a), as modified by reference (b), is acceptable.
Sincerely.
Odstnal Signed ITy kkD. Beach L. J. Callan, Director Division of Reactor Projects I
r cc:
(Seenextpage)
I )
J
~p'LRilhoan C:PSA kh D:UtPh Re or ur RIV:PSS (T/t AC:PSSd RS
/J DDChamberlain LJCallan RJr land JRBoardmhn/cjg RElreland 4
'7 /d /88 7 / f /88 h Q/} /88 1 q /88 7 g /88 88
/
hD[$ DOCK $$00 82 J
P PDC N
f t
1.3 -
Louisiana' Power & Light Company ' Louisiana Power & Light Company ATTN:
G. E. Wuller, Onsite s
Licensing Coordinator P.O. Box B Killona, Louisiana 70066~
Louisiana-Power & Light Company ATTN:
N. S. Carns, Plant Manager P.O. Box B Killona, Louisiana 70066 Middle South Services ATTN: Mr. R. T. Lally i
P.O. Box 61000 New Orleans, Louisiana 70161 Louisiana Power & Light Company ATTN:
R. F. Burski, Acting Manager Nuclear Safety and Regulatory Affairs 317 Baronne Street P.O. Box 60340 4
New Orleans, Louisiana 70160 Louisiana Radiation Control Program Director bec-to DMB (IE43) bec distrib. by RIV:
DRP Resident Inspector i
P.. D. Martin, RA SectionChief(DRP/C)
Lisa Shea, RM/ALF MIS System t
RPSB-DRSS RSTS Operator Project Engineer, DRP/C RIV File W. Paulson, NRR Project Manager DRS G.'F. Sanborn, E0 J. Gagliardo W. McNeill I. Barnes J. Boardman R. Ireland 4
[
r
- -