In Reply Refer To:
Dockets: 50-498/88-04
50-499/88-04
Houston Lighting & Power Company
,
ATTN:
J. H. Goldberg
.
Group Vice President, Nuclear
P.O. Box 1700
Houston, Texas 77001
Gentlemen:
1
i
This refers to the inspection conducted by Messrs. D. R. Carpenter, J. E. Bess,
E. P. Hildebrand, and other members of this office during the period
January 1-31, 1988, of activities authorized by NRC Operating License NPF-71 and
.
l
Cons,truction Permit CPPR-129 for the South Texas Project, Units 1 and 2 and to
i
the discussion of our findings with Mr. W. H. Kinsey and other members of your
!
staff at the conclusion of the inspection.
i
Areas examined during the inspection included main feedwater hydraulic
transients - Unit 1, standby diesel generator initial start - Unit 2, monthly
!
surveillance observations, operational safety verification, Unit I significant
plant events, engineered safety feature system walkdown, review of startup test
procedures - Unit 1, and site tours. Within these areas, the inspection
l
consisted of selective examination of procedures and representative records,
j
interviews with personnel, and observations by the NRC inspectors. The
'
inspection findings are documented in the enclosed inspection report.
l
l
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
!
th!s violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
i
Notice of Violation enclosed with this letter.
.
I
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
j
4
by the Paperwork Reduc. tion Act of 1980. PL 96-511.
'
!
!!M88818388lb
Q
- RIV:SR
- DRP/D
- DRP/D
- L4P/D
- C:RP/0
0
P
DRCarpenter/Ir
EHildebrand
JEBess
HFBundy
GLConstable
L8 Callan
/ /88
/ /88
/ /88
/ /88
/ /88
3 /23/88
- Previously concurred
gc/
' l
i
. __ ________
,
,
Houston Lighting & Power Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original M;:ned Ily
A.11. Deach
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-498/88-04
50-499/88-04
cc w/ enclosures:
Houston Lighting & Power Company
ATTN:
M. A. McBurnett, Manager
Operations Support Licensing
P.O. Box 289
Wadsworth, Texas 77483
Houston Lighting & Power Company
ATTN:
Gerald E. Vaughn, Vice President
Nuclear Operations
P.O. Box 1700
Houston, Texas 77001
Houston Lighting & Power Company
ATTN:
S. L. Rosen
P.O. Box 289
Wadsworth, Texas 77483
,
Central Power & Light Company
ATTN:
R. L. Range /R. P. Verret
P.O. Box 2121
Corpus Christi, Texas 78403
City Public Service Board
ATTN:
R. J. Costello/M. T. Hardt
P.O. Box 1771
San Antonio, Texas 78296
l
City of Austin Electric Utility
l
ATTN:
R. J. Miner, Chief Operating
Officer
721 Barton Springs Road
Texas Radiation Control Program Director
bcc:
(set next page)
!
_ _ _ _ _ _ _ - _
.
.
Houston Lighting & Power Company
-3-
bec to ;MB (IE01)
bec distrib. by RIV:
- DRP
- KRI-0PS
- R. D. Martin, RA
- RRI-CONST.
- Section Chief (DRP/D)
RPSB-DRSS
- MIS System
- RIV File
- l.isa Shea, RM/ALF
- RSTS Operator
R. Bachmann, 0GC
- H.
Bundy
- P. Kadambi, NRR Project Manager
- R. Hall
- TSS
D. Powers
- DRS
- w/766
i