n.1-muatan=xcM%.MAawaMe,hm.Muwvnumummw asnwn,umam.,a
h
'
'
.
,
"%
UNITED STATES
j' '
/o
NUCLEAR REGULATORY COMMISSION
h-
'
"
REGION Iv
af
611 RYAN PLAZA DRIVE, SulTE 1000
\\,,,,8
ARUNGToN. TEXAS 79011
JLt. - 81988
In Reply Refer To:
Docket Nos.
50-498/88-11
50-499/88-24
Operating License:
Houston Lighting & Power Company
ATTN:
J. H. Goldberg, Group Vice
President, Nuclear
P.O. Box 1700
Houston, Texas 77001
f
Gentlemen:
SUBJECT:
NOTICE OF VIOLATION (NRC INSPECTION REPORT NOS. 50-498/88-11
AND50-498/88-24)
This refers to the inspection conducted February 11 through March 31 and
April 5 through May 2, 1988, at the South Texas Project, Unit 1 (STP-1) near
Bay City, Texas.
During these inspections, it was found that certain of your activities appeared
to be in violation of NRC requirements. On May 26, 1988, an enforcement
conference was held in the Region IV office in Arlington, Texas, to discuss
violations identified during recent NRC inspections (reference NRC Inspection
Report Nos. 50-498/88-11 and 50-498/88-24). Two of the apparent violations
(Violations 498/8824-03 and 498/8811-01) are under review and will be addressed
in a separate letter.
One apparent violation (498/8811-04) involving not
having a specific procedure to control lifted leads has been withdrawn based on
information you provided during the enforcement conference.
The remaining four
apparent violations are contained in the attached Notice of Violation.
Violation A in the enclosed Notice of Violation involves deficiencies identified
by the NRC during a test results verification inspection. This violation is
potentially significant because these packages had been through several reviews
in your system and the errors had not been discovered. However, these
deficiencies were not significant because the errors were isolated and had no
impact on the successful completion of the test.
Violation B represents a potentially significant weakness in adherence to your
Technical Specification (TS) requirements.
During power operation it is
important that operations staff personnel be aware of all system operability
requirements prior to exiting TS Action Statement.
Violation C represents a potentially significant weakness because of the failure
to properly control system boundaries in accordance with procedural requirements.
i{
8807190325 880709
{H
ADock 0500
9e
7{)q
i
<
,.
,
i
-
..
. Houston Lighting & Power Company
-2-
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In responding,
you may refer to previous correspondence to the NRC where you may have
documented all or part of your required response to these violations. After
reviewing your response to this Notice, including,your proposed corrective
actions and the results of future inspections, the NRC will determine whether
further NRC enforcement action is necessary to ensure compliance with NRC
regulatory requirements.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
'
will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosed Nctice are not subject to
the clearance procedures of the Office of Management and Budget as required by
the Papemork Reduction Act of 1980, Pub. L. No. 96-51'..
Should you have any questions concerning the inspection, we will be pleased to
discuss them with you.
Sincerely
0
1
W
V
,
/
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
Appendix - Notice of Violation
cc:
Texas Radiation Control Program Director
. - _ -
-
-
.- -
. - . _
.,
.
.%
d g.
. . . .
!?
Houston; Lighting &PowerComp$ny.
-
3=-
-DISTRIBUTION
-
.
bcc'w/ encl:
-
PDR-
SECY
CA
.
JMTaylor, DEDR0.
HThompson, NMSS
JLieberman, 0E
LChandler, OGC
Enforcement Officers
- RI, RII, RIII, RV
HDenton, 0GPA
EJordan, AE0D
.t
BHayes', 01
SConnelly, OIA
OE:ES File
- OE:EA File
BSummers, DE (1tr hd)
RSTS Operator
DCS (IE14)
RIV Distribution:
-RMartin
JMontgomery
JCallan .
GLConstable
JGilliland(ltrhd).
CHackney.
GFSanborn,E0
E0 Files
- RIV Files
. MIS Coordinator
Resident Inspector'
RIV: ENFS*
E0*
DD R
D
h
GLConstable:gb
GFSanborn
ABBE ~ach
LJCa an
/ /88
/ /88
7/l/88
- previously concurred