Discusses Insp Repts 50-498/88-11 & 50-499/88-24 on 880405-0502 & Forwards Notice of Violation
ML20151A301
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/08/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20151A304 List:
References
NUDOCS 8807190325
Download: ML20151A301 (3)


See also: IR 05000498/1988011

Text

n.1-muatan=xcM%.MAawaMe,hm.Muwvnumummw asnwn,umam.,a h

' '

. ,

"% UNITED STATES

j' ' /o NUCLEAR REGULATORY COMMISSION

h- ' "

REGION Iv

af 611 RYAN PLAZA DRIVE, SulTE 1000

\,,,,8 ARUNGToN. TEXAS 79011

JLt. - 81988

In Reply Refer To:

Docket Nos. 50-498/88-11

50-499/88-24

Operating License: NPF-76

Houston Lighting & Power Company

ATTN: J. H. Goldberg, Group Vice

President, Nuclear

P.O. Box 1700

Houston, Texas 77001

f

Gentlemen:

SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT NOS. 50-498/88-11

AND50-498/88-24)

This refers to the inspection conducted February 11 through March 31 and

April 5 through May 2, 1988, at the South Texas Project, Unit 1 (STP-1) near

Bay City, Texas.

During these inspections, it was found that certain of your activities appeared

to be in violation of NRC requirements. On May 26, 1988, an enforcement

conference was held in the Region IV office in Arlington, Texas, to discuss

violations identified during recent NRC inspections (reference NRC Inspection

Report Nos. 50-498/88-11 and 50-498/88-24). Two of the apparent violations

(Violations 498/8824-03 and 498/8811-01) are under review and will be addressed

in a separate letter. One apparent violation (498/8811-04) involving not

having a specific procedure to control lifted leads has been withdrawn based on

information you provided during the enforcement conference. The remaining four

apparent violations are contained in the attached Notice of Violation.

Violation A in the enclosed Notice of Violation involves deficiencies identified

by the NRC during a test results verification inspection. This violation is

potentially significant because these packages had been through several reviews

in your system and the errors had not been discovered. However, these

deficiencies were not significant because the errors were isolated and had no

impact on the successful completion of the test.

Violation B represents a potentially significant weakness in adherence to your

Technical Specification (TS) requirements. During power operation it is

important that operations staff personnel be aware of all system operability

requirements prior to exiting TS Action Statement.

Violation C represents a potentially significant weakness because of the failure

to properly control system boundaries in accordance with procedural requirements.

8807190325 880709

i{

{H ADock 0500 9e 7{)q

i

<

, ,.

i

-

..

. Houston Lighting & Power Company -2-

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. In responding,

you may refer to previous correspondence to the NRC where you may have

documented all or part of your required response to these violations. After

reviewing your response to this Notice, including,your proposed corrective

actions and the results of future inspections, the NRC will determine whether

further NRC enforcement action is necessary to ensure compliance with NRC

regulatory requirements.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

'

will be placed in the NRC Public Document Room.

The responses directed by this letter and the enclosed Nctice are not subject to

the clearance procedures of the Office of Management and Budget as required by

the Papemork Reduction Act of 1980, Pub. L. No. 96-51'..

Should you have any questions concerning the inspection, we will be pleased to

discuss them with you.

Sincerely

0 1

W , V

/ L. J. Callan, Director

Division of Reactor Projects

Enclosure:

Appendix - Notice of Violation

cc:

Texas Radiation Control Program Director

. - _ - - - .- - . - . _

.

.,

.% d g.

....

!?

Houston; Lighting &PowerComp$ny. -

3=- *

-DISTRIBUTION

- .

bcc'w/ encl:

-

PDR-

SECY

CA .

JMTaylor, DEDR0.

HThompson, NMSS

JLieberman, 0E

LChandler, OGC

Enforcement Officers

- RI, RII, RIII, RV

HDenton, 0GPA

.

EJordan, AE0D

t BHayes', 01

SConnelly, OIA

OE:ES File

- OE:EA File

BSummers, DE (1tr hd)

RSTS Operator

DCS (IE14)

RIV Distribution:

-RMartin

JMontgomery

JCallan .

GLConstable

JGilliland(ltrhd).

CHackney.

GFSanborn,E0

E0 Files

- RIV Files

. MIS Coordinator

Resident Inspector'

RIV: ENFS* E0* DD R D

GLConstable:gb LJCa an

/ /88

GFSanborn

/ /88

ABBE ~ach

7/l/88 h

  • previously concurred