OPERATING DATA REPORT DOCKET NO.

50-364 DATE 7/6/88 00MPIRIED BY D. N. Morey-

'IELEPlKNE (205)899-5156 OPERATING S'IMUS Notes

1. Unit Name:

Joseph M. Farley - Unit 2

2. Reporting Period:

Jun1, 1988

1) Cumulative data since
3. Licensed %ermal Power (MWt):

2,652 7-30-81, date of

4. Nameplate Rating (Gross MNe):

860 consnercial operation

5. _ Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe):

863.8

7. Maximum Dependable capacity (Net MWe):

822.8

8. If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A his Month Yr-to-Date Cumulative

11. Hours In Reporting Period 720 4,367 60,672
12. Number Of Hours Reactor Wae. Critical 720.0 4,367.0 57,260.9
13. Reactor Reserve Shutd ma Hours 0.0 0.0 138.0
14. Hours Generator On-Line 720.0-~

4,367.0 51,615.6

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,904,396 11,535,911 130,879,183
17. Gross Electrical Energy Generated (MWH) 622,578 3,820,486 43,023,702
18. Net Electrical Energy Generated (MWH) 593,074 7,642,654 40,794,392
19. Unit Service Factor 100.0 100.0 85.1
20. Unit Availability Factor 100.0 100.0 85.1
21. Unit Capacity Factor (Using MDC Net) 100.1 101.4 82.4
22. t! nit Capacity Factor (Using DER Net) 99.4 100.6 81.1
23. Unit Forced Outage Rate 0.0 0.0 5.7
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Dut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Consnercial Operation):

Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELEC'IRICITY 05/24/81 D5/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81

(

Form 2/30 t(

8807190245 880630 PDR ADOCK 05000364 R

PDC

/

c-DOCKET No. 50-364 1

2' UNIT 2

DATE JULY 6, 1988 COMPLETED BY D. N.-Morey TELEPHONE (205)899-5156 NotTIM June DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (PWe-Net)

(PMe-Net) 1 763 17 826-2 829 18 825 3

825 19 C27 4

832 20 826 5

832 21 823 6

826 22 823 7

827 23 823 8

826 24 822 9

823 25 821 10 831 26 821 11 838 27 820 12 828 28 818 13 831 29 817 14 831 30 818 15 830 31 16 830 INSTRUCTIONS On this format, list the average daily unit power level in fMe-Net for each day in the' reporting month. Compute to the nearest whole megawatt.

Form 13/21 j

I UNIT SHUTD3WNS AND POWER REDUCTIONS DOCKET NO.'

50-364 UNIT NAME J. M. FARLET - UNIT 2

  • DATE JULT 6, 1988 COMPLETED ST D. N. MOREL REPORT MONTH JUNE TELEPHONE (2051899-5156 l

l l

l l'

l METHOD OF l LICENSEE l l

.l CAUSE & CORRECTIVE' l '.

l l

l l DURATION l l SHUTTING l EVENT l SYSTEM l COMPONENT l

ACTION TO.

l i

lNO.

l DATE l TYPE l (HOURS) l REASON l DOWN REACTOR l REPORT 0 l CODE l CODE l

PREVENT RECURRENCE l

1 I

I I

i i

I.

I I

I I

l002.

l380601 l F l 0.0 l B l

N/A l

.N/A l SE l

.MSR l Power was reduced to repair a steam leak on the..l l

l l

l l

l l-l l

l excess steam line from the 2B moisture separator -l l

l l

l l

l l

l l

l reheater first stage to the 58 heater.

l l

1 1

I I

I I

I I

I I

I I

I I

I I

I i

i i

I I

i i

l I

I I

I I

I

.I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I i

i l

I i

1.

l.

I I

I i

i i

I I

I l-i I

i i

l I

i i

i i

l i

1 1

1 I

I I

I I

I i

l i

I I

I I

I I

I I

I I

I I

4 I

I I

i i

I I

I i

i l

i I

I I

I I

I I

.I I

I I

I I

I I

I I

I I

I i

1 I

I I

I I

I I

I I

I 1

I I

I I

I I

I I

I 1

l 1

1 I

I I

I i

1 1

I I

i I

I I

i l

i I

I I

I l-Ft Forced Reason:

Method:

Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test

-Manual Scram.

Entry Sheets for Licensee I

C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-f' D-Regulatory Restriction 4-Other (Explain) 0161)

E-operator Training & License Examination F-Administrative Exhibit I -Same Source f

G-operational Error (Explain)

(9/77)

H-Other (Explain) u m axm v2

.=.

.~*

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE SIM1ARY OF OPERATIONS June, 1988 On June 1, there was a significant. power reduction when power was reduced to repair a steam leak on the excess steam line from the 2B moisture separator reheater first stage to the SB heater.

The following major safety-related maintenance was performed in.the month of June:

1.

The 18-month routine inspection was performed on the 2B diesel generator.

2.

Miscellaneous corrective. and preventive maintenance was perforined on the diesel generators.

I i.

l l

l L

OPERATING DATA REPORT DOCKET NO.

50-364 DA'IE 7/6/88 COMPIE1ED BY D. N. Morey

'IELEPHONE (205)899-5156 OPERATING S'IATUS Notes

1. Unit Name:

Joseph M. Farley - Unit 2

1) Cumulative data since
2. Reporting Period:

June, 1988

3. Licensed Thermal Power ( E t):

2,652 7-30-81, date of

4. Nameplate Rating (Gross We):

860 comercial operation

5. Design Electrical Rating (Net We): 829
6. Maximum Dependable Capacity (Gross Me):

863.8

7. Maximum Dependable Capacity (Net We):

822.8

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net We):

N/A

10. Reasons For Restrictions, If Any:

N/A

'Ihis Month Yr-to-Date cumulative 720 4,367 60,672

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 720.0 4,367.0 57,260.9 0.0 0.0 138.0
13. Reactor Reserve Shutdown Hours 720.0 4,367.0 51,615.6
14. Hours Generator On-Line 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MH) 1,904,396 11,535,911 130,879,183
17. Gross Electrical Energy Generated (MWH) 622,578 3,820,486 43,023,702
18. Net Electrical Energy Generated (EH) 593,074 3,642,654 40,794,392 100.0 100.0 85.1

~

19. Unit Service Factor 100.0 100.0 85.1
20. Unit Availability Factor 100.1 101.4 82.4
21. Unit Capacity Factor (Using MDC Net) 99.4 100.6 81.1
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 5.0
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A Forecast Achieved
26. Units In Test Status (Prior to Comercial Operation):

05/06/81 05/08/81 INITIAL CRITICALITY 05/24/81 05/25/81 INITIAL ELECTRICITY COMMERCIAL OPERATICN 08/01/81 07/30/81 l

l i

Form 2/30 1.

w--

t'

,?:

DOCKET No.

50-364 UNIT 2

DATE JULY 6,'1988 COMPLETED BY D. N. Morey TELEPHONE -(205)899-5156 MONIH June DAY AVERAGE DAILY POWER LEVEL DAY AVEFACE DAILY POWER LEVEL (IMe-Net)

(PMe-Net) 1 763 17 826 2

829 18 825 3

825 19 827 4

832 20 826 5

832 21 823 6

826 22 823 7

827 23 823 8

826 24 822 9

823 25 821 10 831 26 821 11 838 27 820 12 828 28 818 13 831 29 817 14 831 30 818 15 830 33 16 830 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Form 13/21 j

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-364 UNIT NAME J.-M. FARLET - UNIT 2 DATE JULT 6, 1988 COMPLETED BY D. N. NOREY REPORT MONTH JUNE TELEPHONE 82051899-5156 l

l l

l l

l METHOD OF l LICENSEE l l

l

CAUSE & CORRECTIVE l

l l

l l DURATION l l SHUTTING l EVENT l SYSTEM l COMPONENT l

ACTION TO l.

lNO.

l DATE l TYPE l (HOURS) l REASON l DOWN REACTOR l REPORT # l CODE l CODE l

PREVENT RECURRENCE l-1 I

I I

I I

I I

I I

i l Power was reduced to repair a' steam leak on the

.l l002 l880601 l F l 0.0 l B l

N/A l

N/A l SE l

MSR l

l l

l l

l l

l l

l excess steam line from the 28 moisture separator l l

l l

l l

l l

l l

l reheater first stage to the 58 heater.

l l

l 1

1 I

I I

I I

I I

I I

I I

I I

I i

l I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I i

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

i l

i I

I I

I I

8 I

I I

I I

I I

I I

I I

I I

I I

I i

i l

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

i i

I I

i I

i I

1 I

I I

i I

i l

l I

I I

I I

i

.1 I

i i

i I

I I

I I

I I

  • Exhibit G-Instructions Method:

F: Forced Reason:

S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee 3-Automatic Scram.

Event Report (LER) File (NUREG-C-Refueling D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination Exhibit I -Same Source F-Administrative G-Operational Error (Explain)

(9/77)

H-Other (Explain)

=

1.

+:

4 1

,,e JOSEPfl M. FARIEY NUCIIAR PIMf -'

UNIT 2 NARRATIVE S11 NARY OF OPERATIONS June, 1988 On June-1, there was a significant power reduction when power was reduced to repair a steam-leak on the excess steam line from the 2B moisture

. separator reheater first stage to the SB heater..

'Ihe following' major safety-related maintenance was performed in the month '

of June:

1.1 - The 18-month routine inspection was performed on the 2B diesel generator.

2.

Miscellaneous corrective and preventive maintenance was perionned on the diesel' generators.

Alabima Power Compeny' 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 352910400 Te!cphone 2052501837 W. G. Hairston,Ill i

Senior Vice President Nuclear Operations the sodhem electrc system I --

July 12, 1988 Docket No. 50-364 U. S. Nuclear Regulatory Comission ATIN: Document Control Desk washington, D. C.

20555 Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the June 1988 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Yours very truly, h,

irston, III W. G. Ha WGH/JGS:mab/1.6 Attachments xc:

Dr. J. N. Grace ggt I

(

\\

l

_ _ _ _ _ _. _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _.. _. _.. _ _. _ _ _ _ _. _ _ _. _ _ _ _ _ _. _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _