ML20150G046

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-333/88-01 on 880112-0307 & Notice of Violation.Addl Mgt Attention Needed to Assure That Valves Locked When Required Since Similar Event Identified in Insp Rept 50-333/87-22
ML20150G046
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/29/1988
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Radford Converse
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20150G048 List:
References
NUDOCS 8804060174
Download: ML20150G046 (2)


See also: IR 05000333/1988001

Text

,..

.

,

.

29 MAR 1988

Occket No. 50-333

Power Authority of the State of New York

Jaes A. FitzPatrick Nuclear Power Plant

ATTN: Mr. Radford J. Converse

Resident Manager

P.O. Box 41

Lycoming, New York 13093

Subject:

Inspection Report No. 50-333/88-01

This letter e ansmits the results of the routine inspection conducted by

Mr. A. Luptak of this office on January 12, 1988 - March 7, 1988, at the J.

A. FitzPatrict Nuclear Power Plant, Scriba, New York.

Mr. Luptak discussed

the inspe': tion findings with you and other members of your staff at the

conclusion of the inspection.

Based on this inspection, one apparent violation of NRC requirements has

been identified and is described in the enclosed Appendix A, Notice of

Violation.

This item involve! the failure to maintain a manual isolation

valve locked open es required.

It apoears tha*. additional management attention

is needed to assure that veles are locked wher, required since another similar

event was identified by th NRC in Report No. 87 22.

You are required to

respond to this letter and in rioing so please follow the instructions in

Appendix A.

The responses directed by this letter and the accompanying Notices are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwo.k Reduction Act of 1980, PL 96-511.

We appreciate your cooperation in this matter.

Sincerely,

{$E5D

Edward C. Wenzinger, Chief

Projects Branch No. 2

Division of Reactor Projects

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Region I Inspection Report Number 50-333/88-01

l

!

0FFICIAL RECORD COPY

IR FITZ SS-01 - 0001.0.0

'

03/25/88

\\\\

890 060174 880329

,Ol

PD9

ADOCK 05000333

L

e

rdytJm

___________ _

,.-

.

,

'

Power Authority of the State

)g g ]ggg

of New York

2

cc w/encls:

J.P. Bayne, President

J.C. Brons, Executive Vice President-Nuclear Generation

R.E. Beedle, Vice President Nuclear Support

S.S. Zulla, Vice President Nuclear Engineering

R. Burns, Vice President Nuclear Operations

A. Klausmann, Senior Vice President-Appraisal and Compliance

Services

R.L. Patch, Ouality Assurance Superintendent

G.H. Wilvei

ng, Manager, Nuclear Safety Evaluation

Gerald C. Goldstein, Assistant General Counsel

Department of Public Service, State of New York

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Residcrt inspector

State of New York

bcc w/encis:

Region i Docket Room (with concurrences)

Management Assistant, DRMA (w/o encis)

Section Chief, DRP

Robert J. Bores, DRSS

TI Coordinator, DRP

State Liaison Of ficer (SLO)

H. Abelson, LPM, NRR

B. Clayton, EDO, Region I Coordinator

W. Cook, SRI, NMP1/2

P. Koltay, SRI, IP3

J. Strosnider, DRS

f/

(0 r, }, . Il '

.

'? .3.)

\\

1/#

etj/j

'

RI:DRP

R

r

Johnson

ger/td

+

j

d',

P.h

3/[,88,plg#,I

3/25/88

/

0FFICIAL RECORD COPY

IR FITZ 88-01 - 0002.0.0

03/25/88