Forwards Insp Rept 50-424/88-24 on 880607-09.Violations Noted.Violation Under Consideration for Escalated Enforcement Action.Licensee Will Be Advised by Separate Correspondence of Results of Investigations
ML20150F768
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 06/29/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20150F772 List:
References
NUDOCS 8807190043
Download: ML20150F768 (2)


See also: IR 05000424/1988024

Text

[

. [-.

.

.

.

.

.

.

.

.M

~

JUN 291988

[y'h y

'

O

Docket No.-50-424

'

License No. NPF-68

Georgia Power Company.

'

ATTN: Mr. W. G. Hairston, III

Senior Vice President -

-

Nuclear Operations

P. O. Box-4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: ~NRC INSPECTION REPORT NO. 50-424/88-24

This~ refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

P. M. Madden on June 7-9, 1988. The inspection included a review of activities-

authorized for your Vogtle facility. At the conclusion of the inspection, the

findings were discussed with those members of your staff identified in the

enclosed inspection report.

Areas examined during the inspection are ideatified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation .of

,

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements. The violation described in the enclosed Inspection Report

is under consideration for escalated enforcement action.

Accordingly, no

Notice of Violation is being issued at this time and no response to this

'

letter is required.

However, please be advis.d that the number and

characterization of the violation described in the enclosed Inspection Report

may change as a result of further NRC review.

An Enforcement Conference to

discuss this violation will be scheduled at a future date.

You will be

advised by separate correspondence of the results of our deliberations on this

matter.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

,

Sincerely,

(Original signed by L. Reyes

J. Nelson Grace

Regional Administrator

Enclosure:

(See page 2)

.

880719o043 880629

i\\

PDR

ADOCK 05000424

-!

O

PDC

pp

,

.

.

._.

.

.

.

t

.

JUN 29 Igeg

'

,

.

2

Enclosure:

NRC Inspection-Report

-

cc w/ enc 1:

R. P. Mcdonald, Executive Vice

President, Nuclear Operations

P. D. Rice, Vice President, Project

Director

C. W._ Hayes, Vogtle Quality

Assurance Manager

G. Bockhold, Jr. , General Manager,

Nuclear Operations

L. Gucwa, Manager, Nuclear Safety

and Licensing

J. A. Bailey, Project Licensing

Managar

B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

,

D. Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

D. Feig, Georgians Against

Nuclear Energy

bec w/ enc 1:

,

E. Reis, 0GC

'

J. Hopkins, NRR

A. Herdt, RII

A. Gibson, RII

!

T. Conlon, RII

L. Reyes, RII

1

M. Sinkule, RII

V. Brownlee, RII

K. Landis, RII

P. Madden, RII

)

C. Patterson, RII

DRS, Technical Assistant

NRC Resident Inspector

Document Control Desk

State of Gecr.gia

.-

)

RI

.

RI

RI

RII

RI

R

-

.h

A

'h

/

/

M

n:vyg

Conlon

AHerdt

$51nkule

LBrownlee

bson

ey3s

/48

6/p88

6/y/88

6/d /88

/,1f/88

pt6/dy/88

6/JT/88-

i

RII

ins

~ MErnst

.

~

/88

6/ /88

'

i

,

c

-- - - -

- , , , , ,

,,

,

,- ,-.--.,,-. ,, , ,-,, - -. ,,,---

---,

n


,..-r

-

--