Text
[
. [-.
.
.
.
.
.
.
.
.M
~
JUN 291988
[y'h y
'
O
Docket No.-50-424
'
License No. NPF-68
Georgia Power Company.
'
ATTN: Mr. W. G. Hairston, III
Senior Vice President -
-
Nuclear Operations
P. O. Box-4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: ~NRC INSPECTION REPORT NO. 50-424/88-24
This~ refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
P. M. Madden on June 7-9, 1988. The inspection included a review of activities-
authorized for your Vogtle facility. At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are ideatified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation .of
,
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements. The violation described in the enclosed Inspection Report
is under consideration for escalated enforcement action.
Accordingly, no
Notice of Violation is being issued at this time and no response to this
'
letter is required.
However, please be advis.d that the number and
characterization of the violation described in the enclosed Inspection Report
may change as a result of further NRC review.
An Enforcement Conference to
discuss this violation will be scheduled at a future date.
You will be
advised by separate correspondence of the results of our deliberations on this
matter.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
,
Sincerely,
(Original signed by L. Reyes
J. Nelson Grace
Regional Administrator
Enclosure:
(See page 2)
.
880719o043 880629
i\\
ADOCK 05000424
-!
O
pp
,
.
.
._.
.
.
.
t
- .
JUN 29 Igeg
'
,
.
2
Enclosure:
NRC Inspection-Report
-
cc w/ enc 1:
R. P. Mcdonald, Executive Vice
President, Nuclear Operations
P. D. Rice, Vice President, Project
Director
C. W._ Hayes, Vogtle Quality
Assurance Manager
G. Bockhold, Jr. , General Manager,
Nuclear Operations
L. Gucwa, Manager, Nuclear Safety
and Licensing
J. A. Bailey, Project Licensing
Managar
B. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
,
D. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
D. Feig, Georgians Against
Nuclear Energy
bec w/ enc 1:
,
E. Reis, 0GC
'
J. Hopkins, NRR
A. Herdt, RII
A. Gibson, RII
!
T. Conlon, RII
L. Reyes, RII
1
M. Sinkule, RII
V. Brownlee, RII
K. Landis, RII
P. Madden, RII
)
C. Patterson, RII
DRS, Technical Assistant
NRC Resident Inspector
Document Control Desk
State of Gecr.gia
.-
)
RI
.
RI
RI
RII
RI
R
-
.h
A
'h
/
/
M
n:vyg
Conlon
AHerdt
$51nkule
LBrownlee
bson
ey3s
/48
6/p88
6/y/88
6/d /88
/,1f/88
pt6/dy/88
6/JT/88-
i
RII
ins
~ MErnst
.
~
/88
6/ /88
'
i
,
c
-- - - -
- , , , , ,
,,
,
,- ,-.--.,,-. ,, , ,-,, - -. ,,,---
---,
n
,..-r
-
--