Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N8911999-10-15015 October 1999 Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl ML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20217C3151999-10-0606 October 1999 Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 991207.Without Encl ML20217D5591999-10-0505 October 1999 Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function ML20217C8051999-10-0505 October 1999 Forwards Proprietary Results of Audiologic Evaluations for Jp Giar,License SOP-10061-3.Attachment Clearly Shows Requirements for Operator Hearing Ability Are Met. Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20216J9961999-09-29029 September 1999 Forwards Resume of Person Identified as Acting RPM in Licensee to NRC Re Notification That Person Named in License Condition 11 of 20-07626-02,is No Longer Employed at Pilgrim Station.Resume Withheld,Per 10CFR2.790 ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212H1381999-09-23023 September 1999 Submits Info in Support of Request Filed on 990730 to Grant one-time Exemption from 10CFR50,App E,Authorizing Biennial Full Participation Emergency Preparedness Exercise to Be Conducted in 2002 Instead of 2001 ML20212H1441999-09-23023 September 1999 Withdraws 990121 Request for License Change Re Emergency Core Cooling Sys Net Positive Suction Head,Due to Incorrect Datum Preparation ML20216F3451999-09-16016 September 1999 Forwards Summary Rept Providing Results of ISI Conducted at PNPS on-line & Refueling Outage (RFO 12) ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20216E7111999-09-0909 September 1999 Forwards License Renewal Application Including Form NRC-398 & Form NRC-396 for Jp Giar,License SOP-10061-3.Without Encls ML20216E5891999-09-0707 September 1999 Forwards Copy of Pilgrim Station Organization Structure. Encl Refelcts Changes in Upper Mgt Level Structure.Changes Were Effective 990901 ML20211M4501999-09-0303 September 1999 Informs That Pilgrim Nuclear Power Station Plans to Conduct Full Participation Emergency Preparedness Exercise with Commonwealth of Ma on 991207,IAW 10CFR50,App E,Section IV.F.2 ML20211M9161999-08-31031 August 1999 Submits Review & Correction of Info in Reactor Vessel Integrity Database (Rvid),Version 2,re Pilgrim Station ML20211J8391999-08-30030 August 1999 Forwards Rev 1 to Provisional Decommissioning Trust Agreement for Plant,Changing Portions of Agreement to Permit Up to Two Distributions & Clarify Formula for Distribution ML20211H5701999-08-27027 August 1999 Forwards Insp Rept 50-293/99-04 on 990610-0725.Two Violations Identified Being Treated as non-cited Violations ML20211C3381999-08-19019 August 1999 Provides semi-annual LTP Update,Including Schedule, Commitment Descriptions,Progress Since Last Update & Summary of Changes.Rev Bars Indicate Changes in Status Since Last Submittal ML20210U5761999-08-18018 August 1999 Responds to Opposing Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts. Informs That for Sale,Nrc Responsible for Only Ensuring That Entergy Technically & Financially Qualified to Operate NPP ML20210U6691999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opposing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U7521999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opossing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5151999-08-17017 August 1999 Forwards Notice of Withdrawal of Application for Approval of Indirect Transfer of FOL for Pilgrim in Response to .Approval No Longer Needed Since Beco Sold Interest in Pilgrim to EOI on 990713 ML20211B3841999-08-16016 August 1999 Forwards Response to NRC Second RAI Re Pressure Locking & Thermal Binding of SR power-operated Gate Valves ML20210U4831999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data Sheets for Period of 990101-0630,per 10CFR26.71(d) ML20210S0891999-08-0909 August 1999 Forwards Amend 11 to Indemnity Agreement B-48 Signed by Boston Edison Co & Entergy Nuclear Generation Co ML20210R6251999-08-0606 August 1999 Provides Supplementary Info on USI A-46 Implementation Methodology at Pilgrim Station,To Enable NRC to Perform Evaluation & Issuance of Plant Specific SER for Plant ML20210M9411999-08-0202 August 1999 Requests That NRC Treat Pending Actions Requested by Beco Prior to 990713,as Requests Made by Entergy.Ltr Requests That Minor Administrative Changes to License Amend 182 & Associated Ser, ,reflect 990713 Transfer ML20210H8761999-07-30030 July 1999 Requests That NRC Grant Exemption from Requirements of 10CFR50,App E,Section IV F,Which Would Authorize Rescheduling of 2001 Biennial Full Participation Emergency Preparedness Exercise for Pilgrim Station to 2002 ML20210H8661999-07-29029 July 1999 Provides Revised Response to GL 96-06 & Addresses NRC Insp Concern for Containment Penetration X-12.Info Submitted to Facilitate NRC Review & Closeout of Subject GL for Plant ML20216E2321999-07-26026 July 1999 Discusses GL 92-01,rev 1,suppl 1, Rv Structural Integrity. NRC Revised Info in Rvid & Releasing as Rvid Version 2 ML20216D4131999-07-22022 July 1999 Informs That J Conlon,License OP-11040-1,terminated Employment with Beco on 990703,per 10CFR50.74.Individual Will Not Participate in Util Licensed Operator Requalification Training Program ML20210E2231999-07-20020 July 1999 Discusses Arrangements Made by Dennis & M Santiago During 990615 Telephone Conversation for NRC to Inspect Licensed Operator Requalification Program at Pilgrim During Wk of 991004 ML20210C4151999-07-19019 July 1999 Informs That Util Intends to Submit Approx Eight Licensing Actions in FY00 & Eight in FY01,in Response to Administrative Ltr 99-02.Actions Are Not Expected to Generate Complex Reviews ML20210F3711999-07-14014 July 1999 Informs NRC That Effective 990713,listed Pilgrim Station Security Plans Have Been Transferred from Boston Edison to Entergy & Are Still in Effect ML20210A9441999-07-14014 July 1999 Responds to Re Changes to Pilgrim Nuclear Power Station Physical Security Plan Identified as Issue 2,rev 14, Addendum 1,respectively.No NRC Approval Is Required IAW 10CFR54(p) ML20209G2251999-07-0909 July 1999 Forwards Insp Rept 50-293/99-03 on 990419-0609.Five Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C. Several Individual Tagging Errors Occurred ML20209C4661999-07-0707 July 1999 Forwards SE Accepting Addendum on Proposed Change in Corporate Ownership Structure Involving Entergy Nuclear Generation Co ML20209C7761999-07-0606 July 1999 Submits Annual Summary Rept of Changes Made to QAP Description as Described in QA Manual,Vol Ii.Rept Covers Period of Jul 1998 Through June 1999.No Changes Made During Period ML20209C3851999-07-0606 July 1999 Forwards Redacted Draft of Decommissioning Trust Agreement Re Transfer of PNPS & NRC Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generating Co ML20196J7251999-07-0101 July 1999 Informs of Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Pilgrim Nuclear Power Station ML20209B9411999-06-30030 June 1999 Discusses Deferral of IGSCC Welds to RFO 13.Deferral of Welds to Refueling Outage 13 Does Not Impact Acceptable Level of Quality & Safety Per 10CFR50.55(a)(3)(i) Since Plant in Compliance W/Exam Percentage Requirements ML20209B9431999-06-30030 June 1999 Provides Formal Notification That Closing Date for Sale & Transfer of Pilgrim Station Scheduled to Occur on 990713. a Wang Will Be Verbally Notified of Time of Sale Closing ML20209B9791999-06-29029 June 1999 Forwards Rev 13A to Pilgrims COLR for Cycle 13,IAW TS 5.6.5 Requirements.Rev 13A Provides cycle-specific Limits for Operating Pilgrim During Remainder of Cycle 13 ML20196H2381999-06-29029 June 1999 Forwards SER Denying Licensee 980820 Request for Alternative Under PRR-13,rev 2 for Use of Code Case N-522 During Pressure Testing of Containment Penetration Piping ML20209A8761999-06-28028 June 1999 Forwards SER Authorizing Licensee 990317 Relief Request to Use ASME Code Case N-573 as Alternative to ASME Code Section XI Article IWA-4000 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209A8701999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant,Reporting Status of Facility Y2K Readiness Encl ML20210U5901999-06-25025 June 1999 Opposes Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts.Expresses Skepticism Re Claim by Companies That Consumers Will Benefit from Proposed Consolidation & four-year Freeze in Base Rates ML20209C3431999-06-22022 June 1999 Forwards Addendum 1,Rev 14 to Pilgrim Station Security Plan,Iaw 10CFR50.54(p)(2).Changes Proposed Have Been Implemented & Constitute Increase in Plant Defense Plan Commitments.Encl Withheld,Per 10CFR73.21 1999-09-09
[Table view] Category:NRC TO U.S. CONGRESS
MONTHYEARML20246F9781989-08-17017 August 1989 Responds to Requesting Environ Assessment Re Resumption of Operation at Plant ML20236A4171989-03-0101 March 1989 Responds to 881222 Request That NRC Include Town of Bourne within Plume Exposure Pathway Epz.Entire Town Defined to Be within Ingestion Exposure Pathway EPZ Since Risk from Exposure Expected to Be Negligible ML20196C4151988-12-0101 December 1988 Responds to 881031 Requests from Town of Plymouth & Commonwealth of Ma for Addl Meetings Re Plant Emergency Preparedness Issues ML20205H2951988-10-13013 October 1988 Confirms 881012 Request to Address Commission at 881014 Meeting Re Restart of Plant.Commission Allotted Time for Personal Appearance at Beginning of Meeting ML20205B8321988-10-13013 October 1988 Responds to Re Results of NRC Integrated Assessment Team Insp,Results of Recent SALP & Current Status of Emergency Planning at Plant.Confirms 881012 Request to Address Commission at 881014 Meeting ML20205B7941988-10-13013 October 1988 Responds to Re Results of NRC Integrated Assessment Team Insp,Results of Recent SALP & Current Status of Emergency Planning at Plant ML20205C1741988-10-0707 October 1988 Confirms 880928 Request to Address Commission During 881014 Meeting Re Proposed Restart of Facility.Any Restart Decision Will Be Based on Judgement of Adequacy of Plant,Mgt & Offsite Emergency Planning ML20205B8791988-10-0707 October 1988 Confirms 881005 Request to Address Commission Scheduled 881014 Meeting Re Proposed Restart of Plant ML20207M2481988-10-0707 October 1988 Responds to Re Proposed Restart of Plant.Decision Will Be Based on Adequacy of Plant,Mgt & Offsite Emergency Planning.Commission Will Consider NRC Evaluations & Recommendations Re Restart at 881014 Meeting ML20154R5881988-05-27027 May 1988 Informs That Commission Has Not Made Decision Re Resumption of Plant Operations & Will Not Proceed Until Issues Addressed Satisfactorily.Nrc Evaluation of Direct Torus Vent Sys Will Determine Need for Environ Assessment ML20154C1561988-05-0909 May 1988 Responds to 880322 Request for Facility Fsar.Fsar Will Be Delivered within 2 Wks to ML Butler at Recipient District Ofc in Pembroke,Ma,As Requested ML20150F7091988-03-29029 March 1988 Forwards Response to Expressing Concern Re Both Process NRC Adopted to Reach Decision on Restart of Plant & Possible Timing of That Decision.Nrc Taking Necessary Steps to Assure That Plant Will Not Restart Unless Licensee Ready ML20148Q3221988-01-25025 January 1988 Responds to Re Constituents Alleged Core Exposure at Plant.Plant Experienced Fuel Problems in 1970s,fission Product Releases Resulted from Cladding Problems & Core Exposure Incident Has Not Occurred ML20239A7021987-12-0303 December 1987 Responds to Urging NRC to Convene Formal & Comprehensive Hearing on Plant Restart.Planned Public Meetings & Addl Steps Taken to Ensure Full Public Participation in Restart Process Listed ML20236W4981987-11-24024 November 1987 Responds to Requesting That NRC Perform Environ Assessment of Mods Made to Plant Containment Structure Prior to Restart.Util Will Not Be Allowed to Place Direct Torus Vent Sys Into Svc Until NRC Evaluation Complete ML20236T9521987-11-20020 November 1987 Responds to Urging NRC to Convene Formal & Comprehensive Hearing on Restart of Facility.Commission Believes That Commitment to Comprehensive Public Participation in Restart Decision Has Been Demonstrated ML20236W4381987-11-20020 November 1987 Responds to Urging NRC to Convene Formal & Comprehensive Hearing on Restart of Facility.Public Meetings Planned Discussed.More Views Will Be Heard & Considered Through Planned Meetings than in Requested Formal Hearing ML20236W9301987-11-20020 November 1987 Responds to Urging NRC to Convene Formal Comprehensive Hearing on Restart of Facility.Nrc Will Hold Public Meetings Before Taking Position on Facility Restart NUREG-0020, Responds to Encl Re Spent Fuel Storage Capacity at Plant.Spent Fuel Pool at Plant Has Sufficient Space to Accommodate Addl Fuel Storage Racks of Current Design1987-08-25025 August 1987 Responds to Encl Re Spent Fuel Storage Capacity at Plant.Spent Fuel Pool at Plant Has Sufficient Space to Accommodate Addl Fuel Storage Racks of Current Design ML20245B2111987-05-21021 May 1987 Responds to Re Emergency Response Plan & Request Re Pending Petition Concerning Facility.Nrc Awaiting FEMA Results of self-initiated Review of Overall State of Emergency Preparedness Before Responding to Petition ML20206C3571987-04-20020 April 1987 Responds to Forwarding Concerns of Mc Ott Re Facility.Response to Mc Ott Encl ML20212M5001987-03-0404 March 1987 Responds to 870130 Note Forwarding H Shetterly Re Availability of NRC Matls in PDR & Lpdr.Replacement Copy of Insp Rept 50-293/82-20 Will Be Placed in Plant Lpdr ML20209E6291986-08-26026 August 1986 Responds to 860731 Request to Be Kept Informed of Proceedings Re Facilities ML20212N1381986-08-25025 August 1986 Responds to 860714 Concerns Re Problems at Plant & Recommendation That Safety Issues Be Resolved Before Plant Resumes Operation.Nrc Insp History & Util Activities Since 860412 Shutdown Discussed.Related Info Encl ML20206M6321986-08-13013 August 1986 Responds to 860701 Request for Info Re Radioactive Emissions at Plant.Encl 1 Provides Requested Info,Including Identity of Releases Exceeding Limits for Normal Operation.Licensee Semiannual Radioactive Effluent Release Repts Also Encl ML20244E0761986-07-15015 July 1986 Responds to Encl Re Safety of Operations at Facility.Salp Repts,Special Diagnostic Team Insp,Augmented Insp Team & Confirmatory Action Ltr 86-10 Demonstrate NRC Pursuit of Responsibilities in Protecting Public ML20204G1251986-07-15015 July 1986 Responds to Listed Questions in 860715 Request Re Safety Operations at Plant,Including NRC Actions Taken to Assure That Deficiencies Identified in SALP Rept Corrected IA-87-645, Responds to Encl Re Safety of Operations at Facility.Salp Repts,Special Diagnostic Team Insp,Augmented Insp Team & Confirmatory Action Ltr 86-10 Demonstrate NRC Pursuit of Responsibilities in Protecting Public1986-07-15015 July 1986 Responds to Encl Re Safety of Operations at Facility.Salp Repts,Special Diagnostic Team Insp,Augmented Insp Team & Confirmatory Action Ltr 86-10 Demonstrate NRC Pursuit of Responsibilities in Protecting Public ML20207E4271986-07-11011 July 1986 Forwards Commissioner Responses to Prehearing Questions for 860716 Hearing on Significance of Mgt Problems at Commercial Nuclear Facilities in Response to ML20140H8221984-04-18018 April 1984 Forwards Press Release 84-50 Re NRC Proposed Fine Against Util for Failure to Implement Adequate Radiological Controls During Maint ML20054E6111982-06-22022 June 1982 Responds to Re Ma Executive Ofc of Energy Resources Request to Use Civil Penalty Imposed on Util in Home Weatherization & Conservation Program.Commission Considering Review of Director Denial ML20054H8551982-06-0202 June 1982 Responds to to Nj Palladino Re Concerns About Facility Operation.Assignment of Resident Inspectors to Maintain Continuous 24-h Coverage Is Not Best Approach to Assure Adequate Protection of Public Health & Safety ML20054E8491982-05-25025 May 1982 Responds to 820503 Request for Addl Info Re Safety Concerns Expressed by Local Residents Concerning Facility ML20062J3251980-09-30030 September 1980 Discusses Emergency Planning Regulations,In Response to Re L Boyd Concerns.Fema Is Responsible for Adequacy of Emergency Preparedness in States & Communities Around Nuclear Plants NUREG-0474, Forwards NUREG-0474 Re Safety of Pressure Suppression Containment Sys,Per 780615 Request.Rept Covers All Pressure Suppression Containment Designs in Use in Us.W/O Encl1978-08-0101 August 1978 Forwards NUREG-0474 Re Safety of Pressure Suppression Containment Sys,Per 780615 Request.Rept Covers All Pressure Suppression Containment Designs in Use in Us.W/O Encl 1989-08-17
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20211H5701999-08-27027 August 1999 Forwards Insp Rept 50-293/99-04 on 990610-0725.Two Violations Identified Being Treated as non-cited Violations ML20210U7521999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opossing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5761999-08-18018 August 1999 Responds to Opposing Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts. Informs That for Sale,Nrc Responsible for Only Ensuring That Entergy Technically & Financially Qualified to Operate NPP ML20210U6691999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opposing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5151999-08-17017 August 1999 Forwards Notice of Withdrawal of Application for Approval of Indirect Transfer of FOL for Pilgrim in Response to .Approval No Longer Needed Since Beco Sold Interest in Pilgrim to EOI on 990713 ML20216E2321999-07-26026 July 1999 Discusses GL 92-01,rev 1,suppl 1, Rv Structural Integrity. NRC Revised Info in Rvid & Releasing as Rvid Version 2 ML20210E2231999-07-20020 July 1999 Discusses Arrangements Made by Dennis & M Santiago During 990615 Telephone Conversation for NRC to Inspect Licensed Operator Requalification Program at Pilgrim During Wk of 991004 ML20210A9441999-07-14014 July 1999 Responds to Re Changes to Pilgrim Nuclear Power Station Physical Security Plan Identified as Issue 2,rev 14, Addendum 1,respectively.No NRC Approval Is Required IAW 10CFR54(p) ML20209G2251999-07-0909 July 1999 Forwards Insp Rept 50-293/99-03 on 990419-0609.Five Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C. Several Individual Tagging Errors Occurred ML20209C4661999-07-0707 July 1999 Forwards SE Accepting Addendum on Proposed Change in Corporate Ownership Structure Involving Entergy Nuclear Generation Co ML20196J7251999-07-0101 July 1999 Informs of Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Pilgrim Nuclear Power Station ML20196H2381999-06-29029 June 1999 Forwards SER Denying Licensee 980820 Request for Alternative Under PRR-13,rev 2 for Use of Code Case N-522 During Pressure Testing of Containment Penetration Piping ML20209A8761999-06-28028 June 1999 Forwards SER Authorizing Licensee 990317 Relief Request to Use ASME Code Case N-573 as Alternative to ASME Code Section XI Article IWA-4000 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20195K3071999-06-15015 June 1999 Forwards Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Plant ML20195K3851999-06-11011 June 1999 Forwards Copy of Notice of Consideration of Approval of Application Re Proposed Corporate Merger & Opportunity for Hearing.Application Seeks Approval of Proposed Indirect Transfer of FOL for Plant ML20196K9921999-06-0404 June 1999 Informs That NRC Ofc of NRR Reorganized Effective 990328.As Part of Reorganization,Division of Licensing Project Mgt Created ML20207E7351999-05-27027 May 1999 Responds to Requesting Reduction in IGSCC Insp Frequency Per GL 88-01 to Be Performed During Upcoming RFO 12.Forwards SE Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of H Water Chemistry ML20207B6341999-05-26026 May 1999 Informs That Licensee 990415 Submittal Re Financial Position of Entergy Intl Ltd,Llc Will Be Marked as Proprietary & Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20207B7391999-05-24024 May 1999 Forwards from Kc Goss of FEMA to Cl Miller Forwarding FEMA Analysis of Prompt Alert & Notification Sys for Pilgrim Nuclear Power Station.Based on Review,No Significant Problems Exist with Alert & Notification Sys ML20207B0701999-05-24024 May 1999 Responds to Sent to Ofc of Congressional Affairs Requesting Info on Concerns Raised by One Constituent,J Riel Re Y2K Compliance of Pilgrim NPP in Plymouth,Ma ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML20206U7501999-05-17017 May 1999 Forwards Insp Rept 50-293/99-02 on 990308-0418.Two Severity Level 4 Violations Occurred & Being Treated as NCVs ML20206M1891999-05-11011 May 1999 Forwards SE of 980826 Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Sys Piping for Plant ML20206E0551999-04-29029 April 1999 Discusses Bulletin 96-03 Issued on 960506 & Beco Responses ,970207,981230,990121 & 990309 for Pilgrim Npp. Determined That Actions Taken Should Minimize Potential for Clogging of ECCS Suction Strainers ML20206B3031999-04-20020 April 1999 Forwards Insp Rept 50-293/99-01 on 990125-0307.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy.Security Program Was Also Inspected ML20205Q9491999-04-0909 April 1999 Informs That on 990225 NRC Staff Completed PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Develop an Integrated Understanding of Safety Performance ML20205B9391999-03-24024 March 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure-Locking & Thermal-Binding of Safety-Related Power-Operated Gate Valves ML20204C7871999-03-17017 March 1999 Informs That Application Submitting Transfer of Facility Operating License & Matls License & Proposed Amend, Will Be Marked as Proprietary & Be Withheld from Public Disclosure Pursuant to 10CFR2.709(b)(5) ML20199K8321999-01-22022 January 1999 Forwards Request for Addl Info Re Transfer of Facility Operating License for Plant ML20199H5811999-01-20020 January 1999 Submits Exemption Withdrawal of 10CFR70.24(a) Re Criticality Accident Monitoring Requirements ML20198L7781998-12-22022 December 1998 Forwards Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted.Nrc Regional Specialists Reviewed EP & Fire Protection Programs.Ep Program Was Found to Be Well Implemented ML20198J0891998-12-21021 December 1998 Forwards NRC Response to Me Lampert Re Transfer of Ownership of Pilgrim Station in Response to Senator Kerry Ltr Dtd 981019.NRC Will Terminate License Only When Licensee Remediates Site to Levels Specified in Regulations ML20198J1041998-12-21021 December 1998 Forwards NRC Response to Me Lampert Re Transfer of Ownership of Pilgrim Station in Response to Congressman Markey Ltr Dtd 981019.NRC Will Terminate License Only When Licensee Remediates Site to Levels Specified in Regulations ML20137T2211998-12-17017 December 1998 Responds to to Chairman Jackson Re Concerns About Possible Sale of Pilgrim Station & Waste Disposal Issues.No Application for License Received Nor Contract of Sale Between Beco & Entergy.Record Copy ML20198J1161998-12-17017 December 1998 Responds to to Chairman Jackson in Which Recipient Expressed Concern About Possible Sale of Pilgrim Station & About Waste Disposal Issues.Nrc Has Not Received Application for Transfer of License to Date ML20198P2781998-12-17017 December 1998 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety.App B Records Being Withheld in Entirety (Ref FOIA Exemption 4) ML20198B2021998-12-0909 December 1998 Advises of Planned Insp Effort Resulting from Licensee Irpm Review.Details of Insp Plan for Next 6 Months & Historical Listing of Plant Issues Encl ML20197H8521998-12-0909 December 1998 Responds to Ltr Sent to Chairman SA Jackson on 981028 Re Concern That NRC Will Not Perform Environ Assessment in Connection with Consideration of Approval of Transfer of License for Plants to Permit Sale ML20196J1201998-12-0404 December 1998 Ack Receipt of 971217 & 30 & 980112,0309,0423 & 0630 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-293/97-02,50-293/97-11,50-293/97-13, 50-293/97-80 & 50-293/98-01.Actions Found Acceptable ML20196B5421998-11-24024 November 1998 Forwards Plant SRO & RO Initial Exam Rept 50-293/98-301OL During Wk of 981016-23 ML20196F7631998-11-24024 November 1998 Forwards Insp Rept 50-293/98-203 on 980928-1023.No Violations Noted.Three Issues Identified Re Containment Flooding,Surveillance Testing Criteria & Protection for RBCCW System from High Energy Line Break Inside Drywell ML20196C1191998-11-20020 November 1998 Forwards Insp Rept 50-293/98-08 on 980907-1019.No Violations Noted.During Insp Period,Chemical Decontamination of Residual Heat Removal Sys Was Well Planned & Implemented Which Reduced Radiation Doses in Heat Removal Quadrants ML20195H7361998-11-16016 November 1998 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 981016 & 981019-23 at Facility.Nine Applicants Were Administered Exam & Nine Passed.Licenses Issued & Individual Test Results Encl.Without Encl ML20155C4781998-10-29029 October 1998 Forwards RAI Re Resoultion to GL 96-06 Issues at Plant,Unit 1.Response Requested by 981130 ML20154J7881998-10-0808 October 1998 Authorizes Mb Santiago to Administer Initial Written Exams to Applicants Listed (Except Applicants Redlined), on 981016.NRC Region I Operator Licensing Staff Will Administer Operating Tests During Week of 981019 1999-09-30
[Table view] |
Text
i e
! M' '
' m.
Distribution- '
UNITEJ STATEg NRC & Local PDRS
- EDO 3523 NUCLEAR REGULATORY COMMISSION DMossburg
- ! $ wAssmorow, o. c. aoese VStel1o DMcD6riald 4
- JTaylor MRushbrook TRehm RHWessman k ' * * *
- p' JMurray PStohr CHAIRMAN March 29, 1988 WTRussell JWiggins FGillespie TMurley/JSniezek gHa The Honorable Edward M. Kennedy Committee on Labor and Human Resources SVarga United States Senate Washington, D. C. h98"
Dear Mr. Chairman:
CY I am responding to your February 17, 1988 letter, in which you expressed concern regarding both the process we adopted to reach a decision on the restart of the fil ?a=-Power Station and the possible timing of that decision. You also offered five specific recommendations for our consideration that in your view would remedy the defects you perceive in our procedures.
The Commission ultimately must decide whether to authorize the Pilgrim plant to restart. We must do so based on the best information available to us and with full awsreness of our responsibility for the protection of the public health and safety. We take this responsibility very seriously. Our staff is carefully monitoring the progress of the Boston Edison Company in addressing tlie issues that must be resolved prior to restart. We believe we are taking the necessary steps to assure ourselves that the Pilgrim plant will not restart unless and until we are fully satisfied that the licensee is ready and capable of resuming safe operations and that the public health and safety is protected.
Our detailed responses to your recommendations are enclosed.
We believe that the information provided in our recent correspondence and in the enclosure to this letter addresses the concerns that you raised.
Sincerely, odcw*(v. 4 Lando W. Zech Jr.
Enclosure:
Responses to Recommendations Originated: NRR: Mcdonald 8804050343 080329 PDR COMMS NRCC CORRESPONDENCE PDR
. + x w ;;w y :
l
! RESPONSES TO RECOMENDATIONS 1 i
Recomendation 1. Until we receive satisfactory answers to the questit whether there is a link between cancer and nuclear power, the Pilgrim plant should not be permitted to restart.
nspon'se 1. The NRC staff has reviewed the epidemiological study entitled, ,
' Health Surveillance of the Plymouth Area " which was performed by the l
Massachusetts Department of Health and referenced in the enclosure to your ;
letter. The study reports detecting an increased ine.idence of leukemia cases in five towns in the vicinity of the Pilgrim Nuclear Power Plant. Because many factors other than the Pilgrim plant could cause this increase, the authors of the study state that the cause of the increased incidence has not been determined. The staff agrees with the authors' statement.
The effects of radiation on living systems have been studied for decades by individual scientists as well as by select comittees that have been formed to '
objectively and independently assess the risks from radiation. These studies were considered in the development of the public health and safety limits that apply to the Pilgrim plant, as well as to other nuclear power plants. The studies have not detected a statistically significant increase in cancer for doses and dose raies normally encountered in the vicinity of nuclear power plants. However, as a prudent measure, the NRC staff assumes that there is a linear relation between cancer and low doses of radiation. MRC limits are selected so that the statistical probability of risk is extremely low.
1
> We are also aware of the National Institutes of Health's involvement in studying the adverse effects of low-level ionizing radiation. We support the need to further define the effects of this phenomenon, but we believe it will '
be several years before the results of these studies will be available. We look forward to incorporating those results into the body of data already available on this subject.
Thus, the staff has found that on the basis of the substantial data available in the area of health effects from exposure to radiation, it is not appropriate to delay restarting the Pilgrim plant pending completion of further study to a
determine if there is a link between certain types of cancer and comercial nuclear power generation.
Recomendation 2. Until there is an evacuation plan which is approved by the Federal Emergency Management Agency (FEMA) and is acceptable to the Commonwealth of Massachusetts, the plant should not be permitted to restart.
Response 2. The NRC will not permit the Pilgrim facility to resume operation l until corrective actions satisfactory to NRC have been taken to address the i emergency planning deficiencies identified by FEMA. The NRC will give special attention to the corrective actions involving the emergency plans for schools and day care centers, as well as for special needs and transport-dependent j populations in the plume exposure pathway emergency planning zone. Before 1 allowing Pilgrim to restart, the NRC will require some demonstration that critical aspects of the emergency plan can be adequately implemented.
a l~ ,
~
2 i
I Under the NRC's regulatory framework, whether an outstanding emergency planning deficiency delays restart will depend on the gravity of the defic < ency, the nature of any compensatory actions, and progress toward correction of the deficiency. Thus, it may be that restart can be authorized with some emergency planning issues not fully resolved. For Pilgrim, the restart decision will be made by the Cosmiissioners.
Recommendation 3. Members of the Cossnission should make an on-site visit to !
the Pilgrim plant to assess for themselves the merita of the serious health and safety problems which have been raised. l Response 3. The Cosnissioners have been personally and directly involved in l the consideration of the Pilgrim issues. Chaiman Zech and three other i Cossnissioners made visits to Pilgrim during 1987. One Coassissionse met in l State offices with State officials to hear their concerns about Pilgrim. At this time, there are no additional Comissioner visits to Pilgrim scheduled in i 1988.
Reconsnendation 4. Prior to any consideration of whether the Pilgrim plant j should be pennitted to restart, Coonission members should convene a public i meeting to receive first-hand testimony from State and local officials and experts from the Plymouth area.
Response 4. As described in our letter of November 20, 1987, the NRC is holding several meetings in the Plymouth area regarding Pilgrim. These meetings are open to the public and are structured to allow the broadest !
possible public participation. The most recent of these meetings was held on February 18, 1988, and provided an opportunity for State and local officials, 1
as well as members of the public, to provide their views to the staff. The Cosmonwealth was consulted and agreed to the scheduling and purpose of these meetings but did not participate, although approximately 50 members of the public did provide comments regarding the Pilgrim Restart Plan and other matters of individual concern. We intend to conduct followup public meetings ,
i in the Plymouth area to discuss the disposition of consents and concerns raised during the February 18, 1988 meeting. The Comonwealth would be free, of l course, to participate in any of these follow-on meetings if it chooses to do i so, and we urge the Comonwealth and local officials to provide whatever infomation they believe should be considered by the Connission in making a restart decision.
The Comission is continuing to involve Comonwealth and local officials, and leaders of local citizens groups, with respect to the restart issues at Pilgrim. On February 9,1988, a senior member of the NRC staff met with the Massachusetts Assistant Secretary of Public Safety, State Senator William Golden, and others to discuss the Comission's approach toward the restart readiness assessment of Pilgrim. An additional meeting with Senator Golden and others who submitted a July 1986 10 CFR 2.206 Petition is planned.
In sumary, the staff has provided and is continuing to afford the opportunity for ample public participation.
1
1 e' . , *: .,
)
Reconnendation 5.- Finally, I request that in my capacity as Chaiman of the Senata cosmittee on Labor and Human Resources, with experience concerning, and responsibility for, the health and safety issues involved, I be given the opportunity to appear before the Cosnission to present infomation on this l issue, prior to any Commission deliberation on tne question whether the Pilgrim plant should be permitted to restart.
Response 5. Although the Commission does plan to hold one or more public meetings in Rockville, Maryland, concerning the restart of the Pilgria plant, it is difficult at this time to predict when these meetings might be scheduled.
The structure for the meetings will be established at the appropriatt time and, if official and public appearances are planned, we would be pleased to have you j appear before the Cosmission to present your views. ;
1 l
l l
l 1
t i
l I
'l 1
~
I
. i
. .#lp3*rtog'*,,
['L g NUCLEAR REGULATORY COMMISSION 8 W ASHINGTON. D. C. 20655 ,e N...../ P. TM ea y f EDO PRINT 71 pat C ORkESPONinENr F CONTROL f _________ _ ___ __ . ... . . -__
- FROM
- rti nF: 03/05/98 Enn CONTROL: 007523 tioc D1:
02/17/88 SEN. EDFWARD M. I'FNNP D Y . f..HAIRMAN FINE RFPl.Y:
COMMITTEF ON LABOR AND HUMAN RESOtlRCES TO:
CHAIRMAN 7ECH FOR SIGNATtlF'?. DF *+ PRIORITY ** SFCY NO: 88-14u CHAIRMAN <
> DESC: ROUTING:
CONCERNING PROBLEMS INVOLVED WITH RE-START OF STFLLO PILGRIM I TAYIOR !
R E H ".
DATE: 02/26/88 RUSSELL ASSIGNED TO: NRR CONTACT: MURLEY c
, SPECIAL INSTRUCTIONS OR REMAR)Si l l
1 NRR RECEIVED: FEBRUARY 26, 1988 ACTION: DRPR VARGA j 1
m )
1
) NRR ROUTING: MURLEY/SNIEZEK r ACTION
~
l j MIRAGLIA _ 1 l $$[EPle mssauaG DUE TO NRR DIRECTOR'S BY lM'#' 0 4 M~ J
.- % mW L -
. 3 i % 9'
% % S D 6 3 /\lbl9
% %)
1 I
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET PAPER HUMBER: CRC-88-0140 . LOGGING DATE: Feb 24 88 ACTION OFFICE: g6DO 4 2(,7 M M)
AUTHOR: E.M. Kennedy ,
AFFILIATION: U.S. SENATE LETTER DATE: Feb 17 88 FILE CODE: ID&R-5 Pilgrim
SUBJECT:
Proposed restart of the Pilgrim I nuclear power
- plant ACTION: Signature of Chairman DISTRIBUTION: RF, Docket, OCA to Ack, EDO SPECIAL HANDLING: None NOTES:
DATE DUE: Mar 8 88 SIGNATURE: . DATE SIGNED:
AFFILIATION:
?
1 i
l l
] Re:'d Off. EDO
! Date- 3 'el #1 - O Time - d '. S 0. M i
i i
IPo3r23
. - __ _ - - . .._ .- -