| Site: | Braidwood |
| Issue date: | 03/23/1988 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| References | |
| CAL-RIII-88-05, CAL-RIII-88-5, NUDOCS 8804050002 | |
| Download: ML20150F120 (2) | |
Text
r pJ CONFIRMATORY ACTION LETTER i4 -
MAR 2 31918 CAL-RIII-88-05 Docket No. 50-456 Comonwealth Edison Company ATTN: Mr. Cordell Reed Senior Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:
This letter confirms the telephone conversation between E. G. Greenman of this office and you on March 23, 1988, related to your identification of deficiencies in the existing lubricants in motor operated valves at Braidwood Unit 1.
With regard to this matter we understand that you will:
1.
Complete sampling of the lubricant for all Unit 1 and Unit common safety-related Limitorque valve operators.
2.
Complete visual inspection and laboratory analysis for all the samples taken.
3.
For each limitorque found to have either contaminated or mixed grease, l
remove the existing lubricant, clean the operator internals, and lubricate the operator with qualified lubricant, t
It is our understanding that you will make available the results of these activities for our review.
We further understand that startup of Unit I to Modes 2 or 1 will only occur with concurrence of the Regional Administrator or his designee.
Issuance of r
this Confirmatory Action Letter does not preclude the issuance of an order i
requiring implementation of the above comitments.
None of the actions specified herein should be construed to take precedence over actions which you feel necessary to ensure plant and personnel safety.
Please advise us immediately if your understanding differs from that set I
forth above.
Sincerely, f
Original Signed by A. Bert Davis 8804050002 880323 s0 PDR ADOCK 05000456 A. Bert Davis P
M gional Administrator t8
- 7 fe DCD See Attached Distribution RJII Ril R
RIJ RIII RI I
~
M N
1 i
1 i
Mill)er Fo ney Gree an Paperiello D
s d*b Gardn,er/jp delst p@pon 3
CONFIRMATORY ACTION LETTER Jg J/23
/
L.
o CONFIRMATORY ACTION LETTER 1
Coa.1onwealth Edison Company 2 MAR 8 41969 Distribution cc:
T. J. Maiman, Vice President, PWR Operations D. Butterfield, Nuclear Licensing Manager M. Wallace, Manager of Projects M. Lohmann, Project Construction and Startup Superintendent W. Vahle, Construction Superintendent R. E. Querio, Station Manager P. L. Barnes, Regulatory Assurance Su DCD/DCB (RIDS)pervisor Licensing Fee Management Branch Resident Inspecto'r, RIII Braidwood Resident Inspector, RIII Byron D. W. Cassel, Jr., Esq.
Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division H. S. Taylor, Quality Assurance Division E. Chan, OGC G. Berry. 0GC Stephen P. Sands, NRR The Honorable A. Dixon Callihan, ASLB The Honorable Richard F. Cole, ASLB The Honorable Ivan W. Smith, ASLB The Honorable Gary J. Edles, ASLAP The Honorable Dr. W. Reed Johnson, ASLAP The Honorable Christine N. Kohl, ASLAP J. M. Taylor, DEDO T. E. Murley, NRR E. L. Jordan, AE0D J. Lieberman, OE M. Johnson, ED0 W. Lanning, NRR F. Miraglia, NRR G. Holahan, NRR D. Crutchfield, NRR J. Partlow, NRR J. Strasma, RIII J. Goldberg, OGC D. Muller, NRR CONFIRMATORY ACTION LETTER