Notice of Violation from Insp on 880201-0315.Violation Noted:Two Cans of Lubrication Oil Found Unattended & Not Stored in Flammable Liquids Locker on -4 Level of Reactor Auxiliary Bldg Wing Area Which Has No Liquids Lockers
ML20150F052
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/30/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20150F042 List:
References
50-382-88-04, 50-382-88-4, NUDOCS 8804040249
Download: ML20150F052 (1)


Text

-.

APPENDIX A NOTICE OF VIOLATION Louisiana Power & Light Company Docket: 50-382 Waterford Steam Electric Station, Unit 3 0perating License: NPF-38 During an NRC inspection conducted February 1 through March 15, 1988, one violation of NRC requirements was identified. The violation involved a failure to follow fire protection procedures. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the violation is listed below:

Failure to Adhere to Fire Protection Procedures Technical Specification 6.8.1.f requires, in part, that written procedures be established, implemented, and maintained for fire protection program implementation.

Fire Protection Procedure FP-1-017, Revision 4 "Transient Combustibles l and Hazardous Materials," requires that lubrication oils be stored in I flammable liquid lockers when not in use. In addition, Enclosure 7.7 of Procedure FP-1-017 provides a list of transient combustibles storage areas in the plant. This list includes a flammable liquid locker on the -4 level of the wing area.

Contrary to the above, on February 9,1988, two cans of lubrication oil were found unattended and not stored in a flammable liquids locker on the -4 level of the reactor auxiliary building wing area. In addition, there was no flammable liquid locker on the -4 level of the wing area.

This is a Severity Level IV violation. (SupplementI)(382/8804-01)

Pursuant to the provisions of 10 CFR 2.201, Louisiana Power and Light is hereby required to submit to this office within 30 days of the date of the letter transmit +.ing this Notice, a written statement or explanation in reply, l including for each violation: (1) the reason for the violation if admitted,  !

(2) the corrective steps which have been taken and the results achieved.

(3) the corrective steps which will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Where good cause is shown, .

consideration will be given to extending the response time. 1 Dated at Arlington, Texas, this 30th day of tiarch 1988.

8804040249 880330 PDR ADOCK 05000382 Q DCD

- - - _ _ _ _ _ _