Forwards Insp Rept 50-267/88-03 on 880201-29.Violations Noted.Actions Taken in Response to Previously Identified Violations Also Examined & Discussed in Paragraph 2 of Rept
ML20150E999
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 03/31/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20150F000 List:
References
NUDOCS 8804040230
Download: ML20150E999 (2)


See also: IR 05000267/1988003

Text

_ _ _ _ _ _ - _ _ _ . - _ _ _ _ _ - _ _

-

... ,

. .

In Reply Refer To:

Docket: 50-267/88-03 MAR 3 i E

Public Service Company of Colorado

ATTN: Robert 0. Williams, Jr.

Vice President, Nuclear

Operations

2420 West 26th A'renue, Suite 15c

Denver, Colorado 80211

Gentlemen:

This refers to the inspection conducted by Messrs. R. E. Farrell and

P. W. Michaud of this office during the period February 1-29, 1988, of

activities authorized by NRC Operating License DPR-34 for the Fort St. Vrain

Nuclear Generating Station, and to the discussion of our findings with you and

other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included followup of licensee action on

previously identified findings, operational safety verification, followup of

unusual event, engineered safety features walkdown, monthly surveillance

observation, monthly maintenance observation, radiological protection, and

physical security observation. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the inspectors. The inspection findings are

documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal '

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

The response directed by thi. letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

'

ff/> [

'

RIV: SRI

REFarrell/ld

RI b

WMichaud

PS/B h

f TFWesterman

0:ph#7

LJCallad

E0

HScott '

3 /2 v/88 /tt./88 7 3 /22/88 3 /25 /88 3 /D/88

/ $O

8804040230'880331

PDR ADOCK 05000267

\k

Q. . - . , .

__ D C D- _ ~_ ~, . . - - . - - - - - . - - - - - - .-- - - - - - - - - - - '-

- - - - _ - - - - - _ _ _ - - - - - - - -

. .

. .

Public Service Company of Colorado -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signc<1 By

A. B. Beach

L. J. Callan, Director

Division of Reactor Project

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-267/88-03

cc w/ enclosures:

Manager, Nuclear

Production Division

Fort St. Vrain Nuclear Generating Station

16805 WCR 19 1/2

Platteville, Colorado 80651

P. Tomlinson, Manager, Quality

Assurance Division

(Same Address)

Colorado Radiation Control Program Director

i

l

Colorado Public Utilities Commission

i

occ to DMB (IE01)

i

'

bec distrib. by RIV:

l *D:DRP R. D. Martin, RA

!

  • RRI DRSP

l

  • Section Chief (RS/B) *RIV File

l *Section Chief (RSB/ES) *R&SPB

i *RSTS OPERATOR * MIS System

l *RSB * Project Inspector

  • D Weiss, RM/ALF *W. Beach
  • Enforcement Officer
  • w/766

l

l

l

\ -.

_ - . ._