ML20150E999
| ML20150E999 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 03/31/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20150F000 | List: |
| References | |
| NUDOCS 8804040230 | |
| Download: ML20150E999 (2) | |
See also: IR 05000267/1988003
Text
_ _ _ _ _ _ - _ _ _ .
- _ _ _ _ _ - _ _
-
...
,
.
.
In Reply Refer To:
Docket:
50-267/88-03
MAR 3 i E
Public Service Company of Colorado
ATTN:
Robert 0. Williams, Jr.
Vice President, Nuclear
Operations
2420 West 26th A'renue, Suite 15c
Denver, Colorado
80211
Gentlemen:
This refers to the inspection conducted by Messrs. R. E. Farrell and
P. W. Michaud of this office during the period February 1-29, 1988, of
activities authorized by NRC Operating License DPR-34 for the Fort St. Vrain
Nuclear Generating Station, and to the discussion of our findings with you and
other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included followup of licensee action on
previously identified findings, operational safety verification, followup of
unusual event, engineered safety features walkdown, monthly surveillance
observation, monthly maintenance observation, radiological protection, and
physical security observation. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspectors.
The inspection findings are
documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
'
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
The response directed by thi. letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
ff/>
[
'
RIV: SRI
RI b
PS/B h
0:ph#7
'
E0
REFarrell/ld
WMichaud
f TFWesterman
LJCallad
HScott
'
3 /2 v/88
/tt./88
7 3 /22/88
3 /25 /88
3 /D/88
/ $O
8804040230'880331
\\ k
ADOCK 05000267
Q.
. - . , .
__ D C D- _ ~_ ~,
.
. -
- . - - - - -
. - - - - - - .-- -
- - - - - - - - -
'-
- - - - _ - - - - - _ _
_ - - - - -
-
-
-
.
.
.
.
Public Service Company of Colorado
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signc<1 By
A. B. Beach
L. J. Callan, Director
Division of Reactor Project
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-267/88-03
cc w/ enclosures:
Manager, Nuclear
Production Division
Fort St. Vrain Nuclear Generating Station
16805 WCR 19 1/2
Platteville, Colorado
80651
P. Tomlinson, Manager, Quality
Assurance Division
(Same Address)
Colorado Radiation Control Program Director
i
l
Colorado Public Utilities Commission
i
occ to DMB (IE01)
i
bec distrib. by RIV:
'
l
- D:DRP
R. D. Martin, RA
!
- RRI
DRSP
- Section Chief (RS/B)
- RIV File
l
l
- Section Chief (RSB/ES)
- R&SPB
i
- RSTS OPERATOR
- MIS System
l
- RSB
- Project Inspector
- D
Weiss, RM/ALF
- W. Beach
- Enforcement Officer
- w/766
l
l
l
\\
_
-
.
._
-.