ML20150E961
| ML20150E961 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 03/29/1988 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20150E964 | List: |
| References | |
| NUDOCS 8804040213 | |
| Download: ML20150E961 (2) | |
See also: IR 05000457/1988007
Text
_ _ ___ _______________ _ _ __ _ _ _
_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _
_
_
_ _ _ ________
-
. ' ,
.'
- ?
.
l,
W 3 9 1988
...
Docket No. 50-4S7
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Senior Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the special Operational Readiness Inspection (ORI) conducted by
Messrs. R. D. Lanksbury, P. G. Brochman, B. H. Little, S. M. Hare, W. B. Grant,
and W. J. Kropp of this office and S. P. Sands of the Office of Nuclear Reactor
Regulation on Feoruary 16 through March 7, 1988, at the Braidwood Station,
Unit 2, authorized by NRC Operating License No. NPF-75 and to the discussion
of our findings with Mr. T. J. Maiman and others of your staff at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice.
A written response
is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance' procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
[
G. C. Wright, Chief
Operations Branch, Division of
Reactor Safety
oTco
$8
Enclosures:
1.
32
2.
Inspection Report
88
No. 50-457/88007(OkS)
n-
See Attached Distribution
S$
RpII .
RIII
RIII[
RIII p'
RIII
I
\\\\
san N,
r= H(e
E8d
/7 , sbury/jlr
orhman
Iittle
are
nds
Gr t
r
w rff
g'
\\
,v
<h
07
e
o
111ps
Y
/Mr
.
-,
~i
e
W 2 9 Jg
'
'
- '
.
.,
.
Commonwealth Edison Company
2
Distribution
cc w/ enclosures:
T. J. Maiman, Vice President,
PWR Operations
D. Butterfield, Nuclear
Licensing Manager
M. Wallace, Manager of Projects
M. Lohmann, Project Construction
and Startup Superintendent
W. Vahle, Construction
Superintendent
E. E. Fitzpatrick, Station
Manager
P. L. Barnes, Regulatory
Assurance Supervisor
DCD/DCB (RI95)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
D. W. Cassel, Jr. , Esq.
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
.
E. Chan, CGC
G. Berry 0GC
Stephen P. Sands, NRR
The Honorable A. Dixon Callihan, .'.LB
The Honorable Richard F. Cole, ASLB
The Honorable Ivan W. Smith, ASLB
The Honorable Gary J. Edles, ASLAP
The Honorable Dr. W. Reed Johnson, ASLAP
The Honorable Christine N. Kohl, ASLAP
_ . . .
>