Confirmatory Action Ltr CAL-RIII-88-06 on 880323 Telcon Re Identification of Deficiencies in Existing Lubricants in motor-operated Valves at Plant.Understands Util Will Take Listed Actions
ML20150E664
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 03/23/1988
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
CAL-RIII-88-06, CAL-RIII-88-6, NUDOCS 8804010250
Download: ML20150E664 (2)


Text

_

CONFIRMATORY ACTION LETTER Y

l l

i MAR 2 31999 t

CAL..RIII-68-06 Docket No. 50-457.

Commonwealth Edison Company ATTN: Mr. Cordell Reed l

Senior Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

This letter confirms the telephone conversation between E. G. Greenman of this office and you on March 23, 1988, related to your identification of deficiencies in the existing lubricants in motor operated valves at Braidwood

[

Unit 2.

With regard to this matter we understand that you wi P:

i r

1.

Complete sampling of the lubricant for all Unit 2 and Urit common safety-related Limitorque valve operators.

2.

Complete visual inspection and laboratory analysis for all the samples taken.

3.

For each Limitorque found to have either contaminated or mixed grease, remove the existing lubricant, clean the operator internals, and lubricate the operator with qualified lubricant.

It is our understanding that you will make available the results of these l

activities for cur review.

t We further understand that startup of Unit 2 to Mode 2 will only occur with concurrence of the Regional Administrator or his designee.

Issuance of this Confinnatory Action Letter does not preclude the issuance of an order requiring implementation of the above commitments.

None of the actions specified herein should be construed to take precedence over actions which you feel necessary to ensure plant and personnel safety.

j Please advise us immediately if your understanding differs from that set forth above.

Sincerely.

[/

Original Signed by A. Bert Davis

\\

. Bert Davis

'f N gional Administrator t

See Attached Distribution 1 $1 C

RIII I

KRII RIII RIII R(II hdT

.z$l A

SW d

LOh m[.,e

[

Greknmah) Paperiello Davis

{

Ga{dger/jp son Mill r Forne 3

9t CONFIRMATORY AC ION LETTER JfA J/M 8804010250 880323

//

PDR ADOCK 05000457 R

DCD

_ _ _,, __._ _.. _ -, ~. _, -.

a CONFIRMATORY ACTION LETTER Comonwealth Edison Company 2

,3 ggg Distribution cc:

T. J. Maiman, Vice President.

PWR Operations D. Butterfield, Nuclear Licensing Manager M. Wallace, Manager of Projects H. Lohmann, Project Construction and Startup Superintendent W. Vahle, Construction Superintendent R. E. Querio, Station Manager P. L. Barnes, Regulatory Assurance Supervisor DCD/DCB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Braidwood Resident Inspector, RIII Byron D. W. Cassel, Jr., Esq.

Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division H. S. Taylor, Quality Assurance Division E. Chan, OGC G. Berry. 0GC Stephen P. Sands, NRR The Honorable A. Dixon Callihan, ASLB The Honorable Richard F. Cole, ASLB The Honorable Ivan W. Smith, ASLB The Honorable Gary J. Edles, ASLAP The Herorable Dr. W. Reed Johnson, ASLAP The Honorable Christine N. Kohl, ASLAP J. M. Taylor, DED0 T. E. Murley, NRR E. L. Jordan, AE0D J. Lieberman, OE M. Johnson, ED0 W. Lanning, NRR F. Miraglia, NRR G. Holahan, NRR D. Crutchfield, NRR J. Partlow, NRR J. Strasma, RIII J. Goldberg, OGC D. Muller, NRR CONFIRMATORY ACTION LETTER 1