_ . ~ . . _
..
,g. .
._-
. . -
__.
. . _ _ - _ _ .
.
-
-
.
,
F
.
.
v
-
'
WR 2 3 V
l
t
i
in Reply Refer To*
!
Docketsr 50-498/08-12
50-499/88-12
{
I
,
I
i
Houston tighting & Power Company
l
'
ATTN:
J. H. Goldberg, Group Vice
,
' President, Nuclear
)
P.O. Box 1700
Houston, Texas 77001
'
i
Gentiemen:
,
.
This refers to the inspection c'onducted by Mr. A..R. Johnson..of this office
!
j
during the period February 8-25,'1988, of activities authorized by NRC
Operating License NPF-71 and Construction Permit CPPR-129 for the South Texas
i
Project, Units 1 and 2, and to the discussio,, of our findings with Mr. M. Wisenburg
and other members of your c'.aff at the conclusion of the inspection.
,
i
Areas examined during the inspection included verification that HL&P was
meeting the requirements and conditions of the facility license for certain hot-
precritical tests. Within these areas, the inspection consisted of selective -
examination of procedures and representative records, witnessing hot
precritical tests, reviewing test data, evaluating test results, interviews
,
with personnel, and observations by the !lPC inspector.
The inspection findings
are documented in the enclosed inspection report.
During this inspection, no violations er deviations were identified.
'
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
i
'
Sincerely,
J
'Ddginal Signed By
i
i ' Il J. Callan
I
L. J. Callan, Director
Division of Reactor Projects
'
Enclosure:
i
Appendix - NRC Inspection Report
i
50-498/88-12
)
!
50-499/88-12
1
l
cc w/ enclosure: (see next page)
)
RIV/0RS:PSS
C:PSS
C:TPS
D:0RS*
i
ARJohnson:de
REIreland
WCSeidle
JMilhoan
/ /88
/ /88
/ /88
/ /88
4
C:0RP/C*
0:DRP b
Reconcur:
- Previously concurred
i
GLConstable
LJCallan
REIreland
/ /88
3/d/8R
/ /88
es03300181 880322
0
.
DR
ADOCK 0500
8
J
_
F
.
,.
'
i
,
Houston Lighting & Power Company
-2-
E
cc w/ enclosure:
Houston Lighting & Power Company
ATTN:
M. Wisenberg, Manager
Nuclear Licensing
P.O. Box 1700
Houston, Texas 77001
Houston Lighting & Power Company
ATTN:
Gerald E. Vaughn, Vi a President
Nuclear Operations
P.O. Box 1700
Houston, Texas 77001
Central Power & Light Company
ATTN:
R. L. Range /R. P. Verret
P.O. Box 2121
Corpus Christi, Texas 78403
City Public Service Board
ATTN:
R. J. Costello/M. T. Hardt
P.O. Box 1771
San Antonio, Texas 78296
City of Austin
ATTN:
M. B. Lee /J. E. Malaski
P.O. Box 1088
Texas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- DRP
- RRI-0PS
R. D. Martin, RA
- Section Chief (DRP/D)
- RPSB-DRSS
- MIS System
- RIV File
Lisa Shea, RM/ALF
- RSTS Operator
R. Bachmann, 0GC
- H.
Bundy
- P. Kadambi, NRR Project Manager
- R. Taylor
- TSS
- R. Hall
- DRS
0. Powers
- L. J. Callan
- A. B. Beach
- R. E. Ireland
- A.
Johnson
W. C. Seidle
- J. Clausner
- J,
P. Jaudon
- J. Milhoan
- W. Hodges, NRR Project
- w/766
~
,
.
In Reply Refer To:
Dockets:
50-498/88-12
50-499/88-12
Houston Lighting & Power Company
ATTN:
J. H. Goldberg, Group Vice
President, Nuclear
P.O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by Mr. A. R. Johnson of this office
during the period February 8-25, 1988, of ac+.ivities authorized by NRC
Operating license NPF-71 and Construction Permit CPPR-129 for the S Ath Texas
Project, Units 1 and 2, and to the discussion of our findings with Mr. M. Wisenburg
and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included verification that HL&P was
meeting the requirements and conditions of the facility license for certain het
precritical tests. Within these areas, the insoection consisted of selective
examination of procedures and representative re w.'ds, witnessing hot
precritical tests, reviewing test data, evaluating test results, interv4ws
with personnel, and observations by the NRC inspector. The inspection findings
are documented in the enclosed inspection report.
1
During this inspection, no violations or deviations were identified.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely.
L. J. Callan Director
.
Divi'%n of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-498/88-12
7
50-499/88-12
/
cc w/ enclosure: (seenextpage)
N
RIV/DR 1 S
C:PSS
M
'
S
(
A
ARJohns
.de
RElreland
d
JM11Hoan
$ /d/88
3 /sb/88
/C
3 /4 //88
C:DRP/C
D:DRP
Reconcur:
'
GLConsta 1
LJCallan
RElreland
$/2>/88
/ /88
/ /88
y g m k
w ea m n e s.---.
-