Forwards Insp Repts 50-498/88-12 & 50-499/88-12 on 880208- 25.No Violations or Deviations Noted
ML20150E240
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/23/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20150E243 List:
References
NUDOCS 8803300181
Download: ML20150E240 (3)


See also: IR 05000498/1988012

Text

_ . ~ . . _ .. ._- . . - __. . . _ _ - _ _ . .

,g. .

-

-

,

.

F

. . v

-

'

t

WR 2 3 V l

i

in Reply Refer To*  !

Docketsr 50-498/08-12  :

50-499/88-12 {

I

,

I

i Houston tighting & Power Company l

J. H. Goldberg, Group Vice

'

ATTN: ,

' President, Nuclear  ;

) P.O. Box 1700

Houston, Texas 77001 '

i Gentiemen:

, .

This refers to the inspection c'onducted by Mr. A..R. Johnson..of this office  !

j during the period February 8-25,'1988, of activities authorized by NRC  ;

Operating License NPF-71 and Construction Permit CPPR-129 for the South Texas i

Project, Units 1 and 2, and to the discussio,, of our findings with Mr. M. Wisenburg

and other members of your c'.aff at the conclusion of the inspection. ,

i Areas examined during the inspection included verification that HL&P was

meeting the requirements and conditions of the facility license for certain hot-  ;

precritical tests. Within these areas, the inspection consisted of selective -  :

examination of procedures and representative records, witnessing hot  ;

, precritical tests, reviewing test data, evaluating test results, interviews

with personnel, and observations by the !lPC inspector. The inspection findings

are documented in the enclosed inspection report.  !

During this inspection, no violations er deviations were identified.  :

'  !

Should you have any questions concerning this inspection, we will be pleased to  ;

discuss them with you. i

'

Sincerely,

J

i

'Ddginal Signed By

i ' Il J. Callan

I L. J. Callan, Director

Division of Reactor Projects

'

Enclosure:

i Appendix - NRC Inspection Report

i 50-498/88-12

50-499/88-12 )

!

1

l cc w/ enclosure: (see next page)

) RIV/0RS:PSS C:PSS C:TPS D:0RS* I

i ARJohnson:de REIreland WCSeidle JMilhoan I

/ /88 / /88 / /88 / /88

4

C:0RP/C* 0:DRP b Reconcur: *Previously concurred

i GLConstable LJCallan REIreland

/ /88 3/d/8R / /88

0

.

es03300181 880322 8  :

DR ADOCK 0500 J

_

F

.

,.

'

, i

Houston Lighting & Power Company -2-

E

cc w/ enclosure:

Houston Lighting & Power Company

ATTN: M. Wisenberg, Manager

Nuclear Licensing

P.O. Box 1700

Houston, Texas 77001

Houston Lighting & Power Company

ATTN: Gerald E. Vaughn, Vi a President

Nuclear Operations

P.O. Box 1700

Houston, Texas 77001

Central Power & Light Company

ATTN: R. L. Range /R. P. Verret

P.O. Box 2121

Corpus Christi, Texas 78403

City Public Service Board

ATTN: R. J. Costello/M. T. Hardt

P.O. Box 1771

San Antonio, Texas 78296

City of Austin

ATTN: M. B. Lee /J. E. Malaski

P.O. Box 1088

Austin, Texas 78767-8814

Texas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • DRP *RRI-0PS

R. D. Martin, RA * RR.T.- CO N ST.

  • Section Chief (DRP/D) *RPSB-DRSS
  • MIS System *RIV File

Lisa Shea, RM/ALF *RSTS Operator

R. Bachmann, 0GC *H. Bundy

  • P. Kadambi, NRR Project Manager *R. Taylor
  • TSS *R. Hall
  • DRS 0. Powers
  • L. J. Callan *A. B. Beach
  • R. E. Ireland *A. Johnson

W. C. Seidle *J. Clausner

  • J, P. Jaudon *J. Milhoan
  • W. Hodges, NRR Project
  • w/766

~

,

.

In Reply Refer To:

Dockets: 50-498/88-12

50-499/88-12

Houston Lighting & Power Company

ATTN: J. H. Goldberg, Group Vice

President, Nuclear

P.O. Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Mr. A. R. Johnson of this office

during the period February 8-25, 1988, of ac+.ivities authorized by NRC

Operating license NPF-71 and Construction Permit CPPR-129 for the S Ath Texas

Project, Units 1 and 2, and to the discussion of our findings with Mr. M. Wisenburg

and other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included verification that HL&P was

meeting the requirements and conditions of the facility license for certain het

precritical tests. Within these areas, the insoection consisted of selective

examination of procedures and representative re w.'ds, witnessing hot

precritical tests, reviewing test data, evaluating test results, interv4ws

with personnel, and observations by the NRC inspector. The inspection findings

are documented in the enclosed inspection report. 1

During this inspection, no violations or deviations were identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely.

L. J. Callan Director .

Divi'%n of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-498/88-12 7

50-499/88-12 /

cc w/ enclosure: (seenextpage) N

RIV/DR 1 S

A C:PSS M '

S

(

ARJohns .de RElreland d JM11Hoan

$ /d/88 3 /sb/88 /C 3 /4 //88

'

C:DRP/C D:DRP Reconcur:

GLConsta 1 LJCallan RElreland

$/2>/88 / /88 / /88

y g m k w ea m n e s.---.

-