Amend 75 to License DPR-77,deleting Requirements of License Condition 2.C.(10),Water Chemistry Control Program
ML20150E036
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 07/06/1988
From: Black S
NRC OFFICE OF SPECIAL PROJECTS
To:
Shared Package
ML20150E040 List:
References
NUDOCS 8807140294
Download: ML20150E036 (4)


Text

_-. _ - _ _ _ _ _ _ _ _ _

'/

UNITED STATES NUCLEAR REGULATORY COMMISSION y

  • n W ASH WGTON,0. C. 20666 3

.g

\\,*..../

4 TENNESSEE VALLEY AUTHORITY _

00CKET N0. 50-327 SEQUOYAH NUCLEAR PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 75 License No. DPR-77 1.

The Nuclear Regulatory Comission (the Comission) has found that:

The applict'ica

'c-amend: rent by Tennessee Valley Authority (the licensee) dated May 15, 1987, complies with tho standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; j

D.

The issuance of this amendment will not. be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

i P

~'~

v

-~~

wm.,

. Accordingly, the license is amended by changes as indicated in the 2.

attachment to this license amendment and paragraph 2.C.(10) of Facility Operating License No. OPR-77 is hereby amended to read as follows:

(10) Water chemistry Control Program (Section 5.3.2)

This requirement has been deleted.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISS10h Suzanne lack, Assistant Director for Projects TVA Projects Division Office of Special Projects

Attachment:

Changes tc the Faragraph 2.C.(10)

Date of Issuance:

July 6,1988

i ATTACHMENT TO LICENSE APENDMENT N0.75 FACILITY OPERATING LICENSE N0. OPR-77 DOCKET NO. 50-327_

Revise the Facility Operating License by removing the page identified below and inserting the enclosed page.

The revised page is identified by the captioned amendment nuinber and contain marginal lines indicating the area of change.

REMOVE INSERT 5

5 I

t l

4 L

(9) Steam Generator Inseection (Section 5.3.1)

Prior to March 1,1981, TVA shall provide to the NRC the results (J) of its tests to determine the feasibility of using a steam generatorI camera device; (b) Prior to start-up after the first ref Jeling. TVA must install inspection ports in each steam generator if the results of the camera device inspection are not satiMactory to the NRC; (c) Prior to start-up after the first refueling. TVA will plug Row I of the steam generator tubes, if required by NRC.

(10) Water Chemistry Control Program (Section 5.3.2),

l This requirement has been deleted.

Amendment No.

75 Dated: July 6, 1988 (11) Negative Pressure in the Auxiliary Building Secondary Containment Enclosure (A55CL) (5ection 6.2.3)

After the final ABSCE configuration is determined, TVA must demonstrate to the satisfaction of the NRC that a negative pressure of 0.25 inches of water gauge can be maintained in the spent fuel storage area and in the ESF pump room.

(12) Environmental Qualification (Section 7.2.2)

(a) No later than November 1,1980. TVA shall submit information to show compliance with the recuirements of NUREG-0588, "Interim Staff Position on Environmental Qualification of Safety-Related Electrical Equipment," for safety-related equipment exposed to a harsh environraent. Implementation shall be in accordance with NUREG-0588 by June 30, 1982.

(b) By no later than December 1,1980, complete and auditable records must be available and maintained at a central location which describe the environmental qualification method used for all safety-related electrical equipment in sufficient detail to document the degree of compliance with the CCR Guicelines or NUREG-0588. Thereafter, such receres should be updated and maintained current as e::uicment is replaced, further tested, or otherwise further qualified to document complete compliance by June 30, 1982.

ORDER CATED NOVEM3ER 6, 1980