ML20150E000

From kanterella
Jump to navigation Jump to search

Forwards Notice of Consideration of Issuance of Amend to License DPR-40 & Proposed NSHC Determination & Opportunity for Hearing on 880309 Request Re Revised Tech Specs for one- Time Extension of Surveillance Interval to Insp Generator 1
ML20150E000
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 03/14/1988
From: Bournia A
Office of Nuclear Reactor Regulation
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20150E003 List:
References
TAC-66466, NUDOCS 8803250329
Download: ML20150E000 (4)


Text

5 March 14,1988 0-Docket No. 50-285 Mr. R. L. Andrews Division Manager - t'uclear Production Oraha Public Power District 1623 Harney Street Omaha, Nebraska 68102 Dear Mr. Andrews

SUBJECT:

NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE AND PROPOSED N0 s

SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION AND OPPORTUNITY FOR HEARING (TAC NO. 66466)

Enclosed for your infoncation is a copy of a Notice of Consideration of Issuance of Amendrent to Facility Operating License and Proposed No Significant Hazards Consideration Determination and Opportunity for Hearing related to your application for the amendinent dated March 9,1983D This application consists of proposed changes to revise the Technical Specifi-cations for the Fort Calhoun Station Unit I that would allow a one-time extension in the 18 month surveillance interval for the Inspection of Diesel Genera <

No.1.

The notice has been forwarded to the Office of the Federal Register for publication.

Sincerely, Anthony Bournia, Project Manager Project Directorate - IV Division cf Reactor Projects - III, IV, V and Special Projects

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION Docket File.

NRC PDR Local PDR PD4 Reading DR4A/J. Collins J. Calvo P. Noonan A. Bournia OGC-Rockville E. Jordan J. Partlow ACRS (10)

PD4 Plant File Q)$

1 PD4/L d-PD4/PM PD4/DI.bx PNoona ABournia:kb JCalvo 03f4/88 03/N/88 03//4/88 i

h!

N K

[

a.

u

March 14,1988 Docket No. 50-285 Mr. R. L. Andrews Division Manager - Muclear Production Onaha Public Power District 1623 Harney Street Omaha, Nebraska 68102 Dear Mr. Andrews

SUBJECT:

NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE AND PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION AND OPPORTUNITY FOR HEARING (TAC NO. 66466)

Enclosed for your information is e copy of a Notice of Consideration of Issuance of Amendrent to Facility Operating License and Proposed No Significant Hazards Consideration Detennination ard Opportunity for Hearing related to your application for the amendment dated Parch 9, 1983. This application consists of proposed changes to revise the Technical Specifi-cations for the Fort Calhoun Station Unit I that would allow a one-time extension in the 18 month surveillance interval for the Inspection of Diesel Cenerator No. 1.

The notice has been fentarded to the Office of the Federal Register for publication.

Sincerely, Anthony Bournia, Project Manager Project Directorate - IV Division cf Reactor Projects - III, IV, V and Special Projects

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION Docket File NRC PDR Local PDR FD4 Reading DR4A/J. Collins J. Calvo P. Nonnan A. Bournia OGC-Rockville E. Jordan J. Partlow ACRS (10)

PD4 Plant File 0

PD4/PM PD4/D hA L PD4/L3'hk~

PNoone ABounita:kb JCalvo 03{M/88 03/W/88 03//4./88

[*,,

UNITED STATES

+

,{

g NUCLEAR REGULATORY COMMISSION O

j WASHING TON, D. C. 20555

/

March 14,1988 Docs.et No. 50-285 Mr. R. L. Andrews Division Manager - Nuclear Production Omaha Public Power District 1623 Harney Street G:naba, Nebraska 68102 Dear Mr. Andrews

SUBJECT:

NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TOFACILITYOPERATINGLICEdSEANDPROPOSEDNO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION AND OPPORTUNITY FOR i; EARING (TAC NO. 66466)

Enc'osed for your information is a copy of a Notice of Consideration of Issuance of Amendnent to Facility Operating License and Proposed No Significant Hazards Consideration Determination and Opportunity for Hearing related to your application for the amendment dated March 9, 1983. This application consists of proposed changes to revise the Technical Specifi-cations for the Fort Calhoun Station Unit I that would allow a one-time extension in the 18 month surveillance interval for the Inspection of Diesel Generator No. 1.

The notice has been forwarded to the Office of the Federal Register for publication.

Sincerely,

[ukq [bsurmot Anthony Bournia, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects

Enclosure:

As stated cc w/ enclosure.

See next page n

s Mr. R. L. Andrews Fort Calhoun Station Omaha Public Power District Unit No. 1 CC' Harry H. Voigt Esq.

LeBoeuf, Lamb, Leiby A MacRae 1333 New Hampshire Averue, NW Washington, D.C.

20036 Mr. Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Mr. Phillip Harrell, Resident Inspector U.S. Nuclear Regulatory Conmission 3

P. O. Box 309 Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations C-E Power Systems 7910 Woodmont Avenue Bethesda, Maryland 20814 Regional Admiristrator, Region IV U.3. Nuclear Regulatory Commission Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 Ar'ington, Texas 76011 f

Harc1d Borchert. Director Division of Radiological Health Department of Health 301 Centennial Mall South P.O. Box 95007 Lincoln, Nebraska 68509 W. G. Gates, Manager Fort Calhoun Statica P. O. Box 399 Fort Calhoun, Nebraska 68023

- _.