Summary of NRC Senior Managers 880628-29 Meeting to Review Performance of Operating Nuclear Power Plants.Facility Categorized as Requiring Continued Close Monitor at Meeting. Summary of Discussions Re Facility Provided
ML20150D865
Person / Time
Site: Rancho Seco
Issue date: 07/08/1988
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Wilcox C
SACRAMENTO MUNICIPAL UTILITY DISTRICT
References
NUDOCS 8807140205
Download: ML20150D865 (1)


Text

l JUL 8 1989 Mr. Clifford Wilcox President, Board of Directors Sacramento Municipal Utility District Post Office Box 15830 Sacramento, California 95852-1830

Dear Mr. Wilcox:

On June 28 and 29, 1988, NRC senior managers met to review the performance of operating nuclear power plants licensed by the NRC. These meetings are conducted biannually to focus NRC resources on those plants and issues of greatest safety significance. At this meeting, the Rancho Seco facility was categorized as requiring continued close monitoring.

Plants in this category are continuing to receive increased NRC attention from both headquarters and the regional office.

A sumary of NRC discussions held relating to Rancho Seco is provided below:

The unit was restarted on March 31, 1988, after receiving authori-zation by the Comission and gradually escalated in power to the 20% and the 45% plateaus.

Several weeks have been spent at each plateau to allow time for equipment grooming and crew training.

The 45% operation is nearing completion with the unit expected to increase to a4 + 65% power in early July. The operation since restart ht een good. There have been no major errors or equipment failures,.

The test program is expected to continue until late ft at graduated power levels.

The NRC staff will continue to..onitor this facility closely.

An NRC Commission meeting open to the public has been scheduled for July 13, 1988, to review the results of the latest meeting of NRC managers.

Mr. John B. Martin, the Region V Administrator, has discussed the basis for our conclusions with regard to the Rancho Seco facility with members of your staff.

If you have any questions regarding this matter, do not hesitate to call me.

Sincerely, Original Signed By:

James M. Taylor Victor Stello, Jr.

Executive Director fcr Operations Distribution:

V. Stello, Jr., ED0 ED0 r/f J. M. Taylor, OEDRO J:entral File r

[O(

T. Rehm, A0/EDO PDR J. B. Martin, RV DEDR0 r/f dO.

T. E. Murley, NRR T. O. Martin, DEDR0 8807140205 08070s gDR ADOCK 05000312 PNU 0FC

DEDRO
DEDRO
tuu NAME : T 0 Martin:ph
JM Taylor
V Stello N