ML20150D748
| ML20150D748 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/29/1978 |
| From: | Hind J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J INDIANA MICHIGAN POWER CO. |
| Shared Package | |
| ML20150D751 | List: |
| References | |
| 781024, NUDOCS 7812060388 | |
| Download: ML20150D748 (2) | |
See also: IR 05000315/1978029
Text
q_
'
IPDR
t# *W
UNITED STATES
4
/
NUCLEAR REGULATORY COMMISSION
'
.
,
y 'l pl
j
REGloN iil
5 .' h
W-
799 ROOSEVELT ROAD
g
'k. .?
8
GLEN ELLYN BL LINCIS 60137
.....
OCT 2~4 f978'
Docket No. 50-315
Docket No. 50-316
<
o
American Electric Power Service
Corporation
Indiana and Michigan Power Company
ATTN:
Mr. John E. Dolan, Senior
Executive Vice President
Engineering
2 Broadway
New York, NY
10004
Gentlemen:
This refers to the.inepection conducted by Messrs. J. R. Creed and
T. J. Madeda of this office on September 25-29, 1978, of activities
at Donald C. Cook Nuclear Power Plant, Units 1 cnd 2 authorized by
NRC Operating Licenses No. DPR-58 and No. DPR-74 and to the dis-
cussion of our findings with Messrs. D. Shaller, L. Matthias,
F. Arsenault and other members of your staff at the conclusion of
the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection. Within these areas, the
inspection consisted of a selective examination of procedures
and representative records, observations, and interviews with
personnel.
During this inspection, certain of your activities appeared
to be in noncompliance with NRC requirements, as described
in the enclosed Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Tit.le
10, Code of Federal Regulations.
Section 2.201 requires you
to submit to this office within twenty days of your receipt
of this notice a written statement or explanation in reply,
including for each item of noncompliance: (1) corrective
action taken and the results achieved; (2) corrective action
to be taken to avoid further noncompliance; and (3) the date
when full compliance will be achieved.
5
7 812 0 C 0 388
Af MCW.RNi 00idAINS
'
10 CiR 2.793 (d) INf 0RMAliON
k
1
l
-)
r
7
l
..
..
American Electric Power
-2-
Service Corporation
Power Company
!
Areas examined during this inspection concern a subject
matter which is exempt from disclosure according to Section
2.790 of the NRC's " Rules of Praqtice," Part 2 Title 10,
Code of Federal Regulations. Consequently, the enclosure
to this letter, our report of this inspection, and your
response to the noncompliance identified in the enclosure
to this letter will not be placed in the Public Document
Room. Therefore, your statement of corrective action
regarding the noncompliance' identified in the enclosure
should be submitted as a separate enclosure to your trans-
mittal letter.
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
J. Y
J. A. Hind, Chief
Safeguards Branch
Enclosures:
1.
Appendix A, Notice
of Violation-
2.
IE Inspection Rpts
No. 50-315/78-29
and No. 50-316/78-27
(Part 2.790(d) Information)
cc'w/ encls:
D. V. Shaller, Plant Manager
Central Files
Reproduction Unit NRC 20b
Ac w/o encls:
/ PDR
Local PDR
Lit!C"c::i C0r:1 AINS
10 CF : 2.*/D (d) 1:;f 0Rf4ATIO:1
. . .
. - . - . . . . - - . - . - - .