ML20150D538
| ML20150D538 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 03/15/1988 |
| From: | Barr K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20150D540 | List: |
| References | |
| NUDOCS 8803240327 | |
| Download: ML20150D538 (2) | |
See also: IR 05000259/1987045
Text
_
_
_
_.
._
_ __
.
b*
.
-
.
~
1)
-
.
.
MAR 15 WB3
Docket Nos. 50-259, 50-260, 50-296
License Nos. OPR-33, DPR-52, DPR-68
Tefnessee Valley Authority
W TH: Mr. S. A. White
Manager of Nuclear Power
6N 38A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
,
1
SUBJECT:
NRC INSPECTION REPORT NOS. 50-259/87-45, 50-260/87-45, AND
50-296/87-45
This refers to the Nuclear Regulatory Commission (NRC) special team inspection
headed by J. W. York on November 30 - December 4,
1987.
The NRC layup and
,
preservation team consisted of the Senior Resident Inspectors from Bellefonte
and Watts Bar accompanied by a Watts Bar resident, a NRC Region II specialist,
i
and a material engineer from NRC headquarters, Office of Special Projects. The
inspection included a review of activities authorized for your Browns Ferry
j
facility.
At the conclusion of the inspection, the findings were discussed
with those members of your staff identified in the enclosed inspection report,
Areas examined during the inspection included the layup and preservation of
-
equipment program. These areas are described in detail in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were identified.
Three unresolved items are identified in the inspection report.
These items
involve improper dry layup and monitoring of the Unit 3 standby liquid control
system, inadequacies in the layup procedure and its implementation for major
rotating equipment, and an apparent lack of sufficient QA overview in the layup
p rog ram.
These matters will be pursued during future inspections.
'
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
\\
.
8803240327 880315
ADOCK 05000259
(\\
Q
,
_-
..
.
-
-
-- _
,
- -
-
.
- . - - -
_
_
.-
.
.-
'
i s.
.
O I 5'1988
.
.
>
<
.
Tennessee Valley Authority
2
1
,
'
'
Should you have any questions concerning this letter, please contact us.
i
Sincerely,
,
ORIGlHAL SIGNED M
KENNETH P. BARR
Kenneth P. Bar,r, Acting Assistant Director
for Inspection Programs'
l
TVA Projects' Division
)
'
Office of Special Projects
Enclosure:
NRC Inspection Report
cc w/ encl-
(): P. Pomrehn, Site Director
Browns Ferry Nuclear Plant
'
t g L. Gridley, Director
.
Nuclear Safety and Licensing
L8. A. Kirkebo, Director,
Nuclear Engineering
t>K J. May, Site Licensing Manager
i
vX G. Walker, Plant Manager
'
>
JVA Representative, Rockville
Office
bec w/ encl:
'
'
LM D. Ebneter, OSP
W. D. Richardson, OSP
'
Jf G. Zech, OSP
&( D. Liaw, OSP
"
W. S. Little, OSP/RII
t X E. Gears, OSP
J.Moran,OSP
A. J. Ignatonis, OSP/RII
A. H. Johnson, OSP/RII
i
y Rutberg, OGC
QtRC Resident Inspector
DRS Technical Assistant
-
,
NRC Document Control Desk
i
State of Alabama
'
i
..
OSP/R I
OSP/RI}
I
,
6 negs:ht
AJI'gnatoni s
WLittle
/ /88
3/ 7 /88
3/b/88
,
- . . - . .
.
..
-
..
-
.
.
._