t
'
Docket No. 50-295
Docket No. 50-304
.,
a
Comonwealth Edison Company
.'
ATTN: Mr. Cordell Reed
<
Senior Vice President
,
Post Office Box 767
Chicago, IL 60690
!
Gentlemen:
This refers to the routine safety inspection conducted by Mr. F. A. Maura of
t
this office on March 2-4, 1988, of activities associated with your containment
integrated leak rate test at Zion Nuclear Power Station authorized by NRC
- i
Operating Licenses No. DPR-39 and No. DPR-48 and to the discussion of our
findings with Mr. G. Plimi and others of your staff at the. conclusion of the
inspection.
l
The enclosed copy of our inspection report identifies areas examined during
.
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
i
,
interviews with personnel.
i
i
No violations of NRC requirements were identified during the course of this
,
inspection.
i
S
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
{
Public Document Room,
i
~
We will gladly discuss any questions you have concerning this inspection.
<
l
Sincerely,
ORIGit;Al, SiGiED DY GC0FFE 0. WlCliI
J
l
'
1
)
Geoffrey C. Wright, Chief
]
Operations Branch
Enclosure:
Inspection Reports
,
j
No.50-295/88007(DRS);
i
No. 50-304/88008(DRS)
]
a
See Attached Distribution
\\\\
)
-
,
'
'
y
h
)
RIII
II@
RIII
RIII
g/))P3
5
eW
ht
L
8803240054 880318
)
ADOCK 05000295
,
'
O
,
_
_,_
_
__
_ _ _
___ j
.
'
'
- * Com$onwealth Edison Company
2
50MI181333
Distribution
cc w/ enclosure:
T. J. Maiman, Vice President,
PWR Cperations
D. Butterfield, Nuclear
Licensing Manager
G. J. Plim1, Station Manager
Jan Norris, Project Manager, NRR
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Richard Hubbard
J. W. McCaffrey, Chief, Public
Ucilities Division
Mayor, City of Zion