Forwards Insp Repts 50-498/88-06 & 50-499/88-06 on 880105-15 & 26-29.No Violations or Deviations Noted.Two Significant Concerns Identified Re LERs 87-12 & 87-17. Concerns Discussed During Enforcement Conference on 871230
ML20150D210
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/16/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20150D214 List:
References
NUDOCS 8803230200
Download: ML20150D210 (3)


See also: IR 05000498/1988006

Text

_ _ - _ _ _ _ _ _ _ _ _ _ _ -

.-

.c ,' .

.

'

, MAR 1e p

In Reply Refer To:

Dockets: 50-498/88-06

-50-499/88-06

Houston Lighting'& Power Company

ATTN: J..H. Goldberg, Group Vice

President, Nuclear

P.O._ f.ox_1700

Houston, Texas 770C1

Gentlemen:

,

This refers to the inspectiort conducted by Messrs. D. R. Hunter and R J. Evans

of this office during the. period January 5-15 and 26-29, 1988, of activities

authorized by NRC Operating License NPF-71 and Construction Perinit CPPR-129 for

the South Texas Project, Units 1 and 2, and to the discussion of our findings

with Mr. J. .T. Westermeier, Project Maaager, and other members of your staff at

the conclusion of the inspection.

The area examined during the inspection included South Texas Project Unit 1

Licensee Event Reports (LER), Nos. 87-01 through 87-25. Within this area, the

inspection consisted of selective review and examination of the written reports

submitted to the NRC pursuant to 10 CFR 50.73. The inspection findings are

documented in the enclosed inspection report.

-Within the scope of.the inspection, no violations or deviations were

identified, but two significant concerns were identified regarding LERs 87-12

and 87-17. The details of LER 87-17 are documented in NRC Inspection

Report 50-498/87-71. . Both concerns were discussed during an enforcement-

conference conducted on December 30, 1987.

Should.you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Ildginal S16ned By

l L. J. Callan, Director

l Division of Reactor Projects

Enclosure: (see next page)

i

I

pD i

l

at

RIV:PSS C: TSS C:0PS ORG

l

C:0RP/0[30: 0RP'

hs \\

'

RJEvans/tw DRHu ter JGagli o JMilhoan GLConstabib LJCal)an

.2 /,2V88 4 /g/88 ) // 8

'

$/ (y88 ~J //t/88 $/p88

L 8803230200 s80316

'-

PDR ADOCK 05000498

g DCD

,. __ -. ,

. _ _ . , . _ . _ . _ _ . ~ . . _ _ _ . _ . _ . -

'

.

.. .- .

..

Houston Lighting'&: Power Company -2-

Enclosure:

Appendix - NRC Inspection Report-

50-498/88-06

50-499/88-06

cc w/ enclosure:

Houston Lighting & Power Company

ATTN: 'M A. McBurnett,' Manager.

.

Operations Support Licensing

P.O. Box 289

Wadsworth, Texas 77483-

Houston Lighting & Power Company

. ATTN: Gerald E. Vaughn, Vice President

Nuclear Operations

P.O. Box 1700

Houston, Te'xas 77001

Houston Lighting & Power Company

ATTN: S. L. Rosen

P.O. Box 289

Wadsworth, Texas 77483

Central Power'& Light Company

ATTN: R. L. Range /R. P. Verret

P.O. Box 2121

Corpus Christi, Texas 78403

City Public Service Board

ATTN: R. J. Costello/M. T. Hardt

P.O. Box'1771

San Antonio, Texas 78296

City of Austin Electric Utility

ATTN: R. J. Miner, Chief Operating

Officer

721 Barton Springs Road

~ Austin, Texas 78704

Texas Radiation Control Program Director

bec distrib. by RIV:

  • DRP *RRI-0PS

R. D. Martin, RA *DRS

  • SectionChief(DRP/D) *RPSB-DRSS
  • MIS System *RIV File

Lisa Shea, RM/ALF *RSTS Operator

R. Bachmann, 0GC *D. Hunnicutt

  • P. Kadambi, NRR Project Manager *R. Hall
  • TSS D. Powers

'*w/766