ML20150C455
| ML20150C455 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 06/27/1988 |
| From: | Black S NRC OFFICE OF SPECIAL PROJECTS |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| References | |
| NUDOCS 8807120484 | |
| Download: ML20150C455 (3) | |
See also: IR 05000327/1988019
Text
.
June 27, 1988
Docket Nos. 50-327/328
Distribution
e Docketd Usg' MSims
FMcCoy
NRC PDR
Mr. S. A. White
Local PDR
JDonohew
Manager of Nuclear Power
Projects Rdg. JRutberg
ACRS(glia
FMira
Tennessee Valley Authority
JPartlow
10)
6N 38A Lookout Place
SEbneter
1101 Market Street
JAxelrad
GPA/CA
Chattanooga, Tennessee 37402-2801
SRichardson
GPA/PA
SBlack
TVA-Rockville
Dear Mr. White:
BDLiaw
dQN Rdg. File
SUBJECT: THE OPEN NUCLEAR SAFETY REVIEW STAFF (NSRS) RECOMMENDATIONS
REQUIRING RESOLU1 ION BEFORE RESTART OF SEQUOYAH UNIT 2
In our letter dated Mar::h 2,1988, the staff issued its Safety Evaluation
Report (SER) on the open NSRS Recomendations requiring resolution.before the
restart of Sequoyah Unit 2.
In the SER, the staff concluded that the
Tennessee Valley Authority (TVA) had acceptably addressed all the 27 restart
open NSRS Recomendations and that the corrective actions were verified for
all the recomendations except for 7.
These seven recom endations are
discussed in Sections 3.1 to 3.7 of the SER.
Although the conclusion of the staff in the SER was that the corrective
actions for the seven recommendations could be verified after the restart of
Sequoyah Unit 2, the staff verified these corrective actions during an
inspection conducted from March 18 to March 22, 1988 at the Sequoyah site
before plant restart. The details of this inspection are reported with other
inspection conclusions in NRC Inspection Report 50-327/328 88-19 datad May 27,
1988. The conclusion of this inspection was that TVA had acceptably addressed
these seven NSRS recomendations and these items are verified and clos (d.
If there are any questions concerning this inspection of these seven restart
onen NSRS recommendations, contact Mr. Jack N. Donohew, NRC Sequoyah Project
Manager.
Sincerely,
Original Signed by
Suzanne Black, Assistant Director
for P:ojects
TVA Projects Division
Office of Special Projects
'
cc: See next page
- sce previces pag i
concurrence
(
OSP:TVA/LA*
OS 'T
M*
TVA:AD/P*
TVA. R
MSims
JDo
SBlack
SRichardson
6/15/88
6/
88
6/15/88
6/q/88
b
B&M'i'0484 880627
rDR
ADOCK 05000327
G
- -
.
-
-
-
-
-
- -
.
.
.
..
,
Docket Nos. 50-327/328
Distribution
Docket File
FMcCoy
NRC PDR
MSims
Mr. S. A. White
Local TOR
JDonohew
Manager of Nuclear Power
Projects Rdg. JRutberg
ACRS(glia
FMira
Tennessee Valley Authority
JPartlow
10)
6N 38A Lookout Place
SEbneter
1101 Market Street
JAxelrad
GPA/CA
Chattanooga, Tennessee 37402-2801
SRichardson
GPA/PA
SBlack
TVA-Rockville
Dear Mr. White:
BDLiaw
SQN Rdg. File
SUBJECT: THE OPEN NUCLEAR SAFETY REVIEW STAFF (NSRS) RECOMMENDATIONS
REQUIRING RESOLUTION BEFORE RESTART OF SEQUOYAH UNIT 2
Re:
Sequoyah Nuclear I' lent, Units 1 and 2
in its letter dated March 2,1988, the staff issued its Safety Evaluation
Report (SER) on the open NSRS Recommendations requiring resolution before the
restart of Sequoyah Unit 2.
In its SER, the staff cencluded that the
Tennessee Valley Authority (TVA) had acceptably addressed all the 27 restart
open NSRS Recomendations and that the corrective actions were verified for
all the recomendations except for seven. These seven recomendations are
discussed in Sections 3.1 to 3.7 of the SER.
Although the conclusion of the staff in the SER was that the corr?ctive
actions for the seven recomendations could be verified after the restart of
Sequoyah Unit 2, the staff verified these corrective actions during an
inspection conducted from March 18 to March 22, 1988 at the Sequoyah site
before plant restart. The details of this inspection are reported with other
inspection conclusions in NRC Inspection Report 50-327/328 88-19 dated May 27,
1988. The conclusion of this inspection was that TVA had acceptably addressed
these seven NSRS recomendations and these items are verified and closeo.
If there are any questions concerning this inspection of these seven restart
open NSRS recomendations, contact Mr. Jack N. Donohew, NRC Sequoya5 Project
Manager.
Sincerely,
I
.
Suzanne Ble:k, Assistant Director
for Projtets
i
TVA Projects Division
i
Office of Special Projects
I
cc: See next page
j4 dfM
0L:h/PM
TVA:
P
TVA:DIR
OSP:
'A
a
MSims g
5htfiew
SBlack
SRichardson
6// 6/88
88
6/f/88
5/ /88
.
-
.
e
- O
,
Mr. S. A. White
Tennessee Valley Authority
Sequoyah Nuclear Plant
cc:
General Counsel
Regional Administrator, Region 11
Tennessee Valley Authority
U.S. Nuclear Regulatory Comission
400 West Sumit Hill Drive
101 Marietta Street, N.W.
E11 B33
Atlanta, Georgia 30323
Knoxville, Tennessee 37902
Resident inspector /Sequoyah NP
Mr. R. L. Gridley
c/o U.S. Nuclear Regulatory Comission
Tennessee Valley Authority-
2600 Igou Ferry Road
SN 157B Lookout Place
Soddy Daisy, Tennessee 37379
Chattanooga, Tennessee 37402-2801
Mr. Richard King
Mr. H. L. Abercrombie
c/o U.S. GA0
Tennessee Valley Authority
1111 North Shore Drive
Sequoyah Nuclear Plant
Suite 225, Box 194
P.O. Box 2000
Knoxville, Tennesseo 37919
Soddy P'isy, Tennessee 37379
Mr. M. R. Harding
Fr. Michael H. Mobley, Director
Tennessee Valley Authority
Division of Radiological Health
Sequoyah Nuclear Plant
T.E.R.R.A. Building, 6th Floor
P.O. Box 2000
150 9th Avenue North
Soddy Daisy, Tennessee 37379
Nashville, Tennessee 37219-5404
Mr. D. L. Williaras
Dr. Henry Myers, Science Advisor
Tennessee Valley Authority
Comittee on Interior
400 West Sumit Hill Drive
and Insular Affairs
W10 885
U.S. House of Representatives
Knoxville, Tennessee 37902
Washington, D.C.
20515
County Judge
Hamilton County Courthouse
Chattanooga, Tennessee 37402
,
,
.
.