June 27, 1988

Docket Nos. 50-327/328 Distribution

FMcCoy

e Docketd

NRC PDR

Usg' MSims

Mr. S. A. White Local PDR JDonohew

Manager of Nuclear Power Projects Rdg. JRutberg

Tennessee Valley Authority JPartlow FMira

6N 38A Lookout Place SEbneter ACRS(glia

10)

1101 Market Street JAxelrad GPA/CA

Chattanooga, Tennessee 37402-2801 SRichardson GPA/PA

SBlack TVA-Rockville

Dear Mr. White: BDLiaw dQN Rdg. File

SUBJECT: THE OPEN NUCLEAR SAFETY REVIEW STAFF (NSRS) RECOMMENDATIONS

REQUIRING RESOLU1 ION BEFORE RESTART OF SEQUOYAH UNIT 2

In our letter dated Mar::h 2,1988, the staff issued its Safety Evaluation

Report (SER) on the open NSRS Recomendations requiring resolution.before the

restart of Sequoyah Unit 2. In the SER, the staff concluded that the

Tennessee Valley Authority (TVA) had acceptably addressed all the 27 restart

open NSRS Recomendations and that the corrective actions were verified for

all the recomendations except for 7. These seven recom endations are

discussed in Sections 3.1 to 3.7 of the SER.

Although the conclusion of the staff in the SER was that the corrective

actions for the seven recommendations could be verified after the restart of

Sequoyah Unit 2, the staff verified these corrective actions during an

inspection conducted from March 18 to March 22, 1988 at the Sequoyah site

before plant restart. The details of this inspection are reported with other

inspection conclusions in NRC Inspection Report 50-327/328 88-19 datad May 27,

1988. The conclusion of this inspection was that TVA had acceptably addressed

these seven NSRS recomendations and these items are verified and clos (d.

If there are any questions concerning this inspection of these seven restart

onen NSRS recommendations, contact Mr. Jack N. Donohew, NRC Sequoyah Project

Manager.

Sincerely,

Original Signed by

Suzanne Black, Assistant Director

for P:ojects

TVA Projects Division

Office of Special Projects

'

cc: See next page

  • sce previces pag i concurrence (

OSP:TVA/LA* OS 'T M* TVA:AD/P* TVA. R

MSims JDo SBlack SRichardson

6/15/88 6/ 88 6/15/88 6/q/88

b

B&M'i'0484 880627

rDR ADOCK 05000327

G PDR

_.

. ..

,

Docket Nos. 50-327/328 Distribution

Docket File FMcCoy

NRC PDR MSims

Mr. S. A. White Local TOR JDonohew

Manager of Nuclear Power Projects Rdg. JRutberg

Tennessee Valley Authority JPartlow FMira

6N 38A Lookout Place SEbneter ACRS(glia

10)

1101 Market Street JAxelrad GPA/CA

Chattanooga, Tennessee 37402-2801 SRichardson GPA/PA

SBlack TVA-Rockville

Dear Mr. White: BDLiaw SQN Rdg. File

SUBJECT: THE OPEN NUCLEAR SAFETY REVIEW STAFF (NSRS) RECOMMENDATIONS

REQUIRING RESOLUTION BEFORE RESTART OF SEQUOYAH UNIT 2

Re: Sequoyah Nuclear I' lent, Units 1 and 2

in its letter dated March 2,1988, the staff issued its Safety Evaluation

Report (SER) on the open NSRS Recommendations requiring resolution before the

restart of Sequoyah Unit 2. In its SER, the staff cencluded that the

Tennessee Valley Authority (TVA) had acceptably addressed all the 27 restart

open NSRS Recomendations and that the corrective actions were verified for

all the recomendations except for seven. These seven recomendations are

discussed in Sections 3.1 to 3.7 of the SER.

Although the conclusion of the staff in the SER was that the corr?ctive

actions for the seven recomendations could be verified after the restart of

Sequoyah Unit 2, the staff verified these corrective actions during an

inspection conducted from March 18 to March 22, 1988 at the Sequoyah site

before plant restart. The details of this inspection are reported with other

inspection conclusions in NRC Inspection Report 50-327/328 88-19 dated May 27,

1988. The conclusion of this inspection was that TVA had acceptably addressed

these seven NSRS recomendations and these items are verified and closeo.

If there are any questions concerning this inspection of these seven restart

open NSRS recomendations, contact Mr. Jack N. Donohew, NRC Sequoya5 Project

Manager.

Sincerely,

. I

Suzanne Ble:k, Assistant Director

for Projtets i

TVA Projects Division i

Office of Special Projects I

cc: See next page j4 dfM

OSP: 'A a

0L:h/PM TVA: P TVA:DIR

MSims g 5htfiew SBlack SRichardson  ;

6// 6/88 88 6/f/88 5/ /88

. - .

e

,

  • O

Mr. S. A. White

Tennessee Valley Authority Sequoyah Nuclear Plant

cc:

General Counsel Regional Administrator, Region 11

Tennessee Valley Authority U.S. Nuclear Regulatory Comission

400 West Sumit Hill Drive 101 Marietta Street, N.W.

E11 B33 Atlanta, Georgia 30323

Knoxville, Tennessee 37902

Resident inspector /Sequoyah NP

Mr. R. L. Gridley c/o U.S. Nuclear Regulatory Comission

Tennessee Valley Authority- 2600 Igou Ferry Road

SN 157B Lookout Place Soddy Daisy, Tennessee 37379

Chattanooga, Tennessee 37402-2801

Mr. Richard King

Mr. H. L. Abercrombie c/o U.S. GA0

Tennessee Valley Authority 1111 North Shore Drive

Sequoyah Nuclear Plant Suite 225, Box 194

P.O. Box 2000 Knoxville, Tennesseo 37919

Soddy P'isy, Tennessee 37379

Mr. M. R. Harding Fr. Michael H. Mobley, Director

Tennessee Valley Authority Division of Radiological Health

Sequoyah Nuclear Plant T.E.R.R.A. Building, 6th Floor

P.O. Box 2000 150 9th Avenue North

Soddy Daisy, Tennessee 37379 Nashville, Tennessee 37219-5404

Mr. D. L. Williaras Dr. Henry Myers, Science Advisor

Tennessee Valley Authority Comittee on Interior

400 West Sumit Hill Drive and Insular Affairs

W10 885 U.S. House of Representatives

Knoxville, Tennessee 37902 Washington, D.C. 20515

County Judge

Hamilton County Courthouse

Chattanooga, Tennessee 37402

,

I

. .

,