Forwards IE Inspec Repts 50-321/78-31 & 50-366/78-39 on 780805-08 During Which No Items of Noncompliance Were Noted
ML20150C286
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/20/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20150C281 List:
References
NUDOCS 7811220059
Download: ML20150C286 (2)


See also: IR 05000321/1978031

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _

o

.

UNITED sT ATEs

,

'Q [em o g'o, , NUCLE AR REGULATORY COMMISSION

A REGloN 11

[ 3

101 M ARIETT A sTRE ET, N.W.

f A - $

{ # '

ATL ANT A. GE oRGI A 30303

[ o [

%,*****J' 001 2 0 1978

,

)

In Reply Refer To: l

R11:WHB

50-321/78-31

50-366/78-39

Georgia Power Company

Atto: Mr. J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street, N. V.

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by Mr. W. H. Bradford of this office

on September 5-8, 1978, of activities authorized by NRC Operating License

No. DPR-57 and License No. NPF-5 for the E. I. Hatch Unit I and 2 facilities,

and to the discussion of our findings held with Mr. M. Manry at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted ef

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

One new unresolved item resulted from this inspection and is discussed in

the enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

If this

inspection report will be placed in the NRC's Public Document Room.

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you (S.e a written application within

20 days to this of fice to withhc1d such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document. If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

7811Td2 05c/

-__ _ - _ _ -_-----_- _- - _ -__ _ --

.

. .

'

OCT 2 0 3979

Georgia Power Company -2-

Should you have any questions concerning this letter, we vill be glad to

discuss them with you.

Sincerely,

w t.\

C.~~ j %[

F. J. Long, Chi

Reactor Operations and Nuclear

Support Branch

Enclosure:

RII Inspection Report Nos.

50-321/78-31

50-366/78-39

cc w/ encl:

Mr. C. E. Belflower

Site QA Supervisor

Plant E. I. Hatch

P. O. Box 442

Baxley, Georgia 31513

Mr. M. Manry, Plant Manager

Plant E. I. Hatch

P. O. Box 442

Baxley, Georgia 31513

l