ML20150C286
| ML20150C286 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/20/1978 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20150C281 | List: |
| References | |
| NUDOCS 7811220059 | |
| Download: ML20150C286 (2) | |
See also: IR 05000321/1978031
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _
o
.
'Q [em o g'o,
, NUCLE AR REGULATORY COMMISSION
UNITED sT ATEs
,
[
A
REGloN 11
3
{
f
A -
$
101 M ARIETT A sTRE ET, N.W.
'
[
[
o
%,*****J'
001 2 0 1978
,
)
In Reply Refer To:
l
R11:WHB
50-321/78-31
50-366/78-39
Georgia Power Company
Atto:
Mr. J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street, N. V.
Atlanta, Georgia
30303
Gentlemen:
This refers to the inspection conducted by Mr. W. H. Bradford of this office
on September 5-8, 1978, of activities authorized by NRC Operating License
No. DPR-57 and License No. NPF-5 for the E. I. Hatch Unit I and 2 facilities,
and to the discussion of our findings held with Mr. M. Manry at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
Within these areas, the inspection consisted ef
enclosed inspection report.
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously identified
These are discussed in the enclosed inspection report.
enforcement matters.
One new unresolved item resulted from this inspection and is discussed in
the enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
If this
inspection report will be placed in the NRC's Public Document Room.
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you (S.e a written application within
20 days to this of fice to withhc1d such information from public disclosure.
Any such application must include a full statement of the reasons on the
basis of which it is claimed that the information is proprietary, and should
be prepared so that proprietary information identified in the application is
contained in a separate part of the document.
If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
7811Td2 05c/
-__
_ - _ _
-_-----_-
_-
-
_
-__
_
--
.
.
.
OCT 2 0 3979
'
Georgia Power Company
-2-
Should you have any questions concerning this letter, we vill be glad to
discuss them with you.
Sincerely,
w t.\\
C.~~ j %[
F. J. Long, Chi
Reactor Operations and Nuclear
Support Branch
Enclosure:
RII Inspection Report Nos.
50-321/78-31
50-366/78-39
cc w/ encl:
Mr. C. E. Belflower
Site QA Supervisor
Plant E. I. Hatch
P. O. Box 442
Baxley, Georgia 31513
Mr. M. Manry, Plant Manager
Plant E. I. Hatch
P. O. Box 442
Baxley, Georgia 31513
l
_ _ _ _ - _ _ ___ _ _______________ _____________
-