ML20150C280
| ML20150C280 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 06/16/1988 |
| From: | ARKANSAS POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML20150C277 | List: |
| References | |
| NUDOCS 8807120400 | |
| Download: ML20150C280 (2) | |
Text
'
.o PROPOSED TECHNICAL SPECIFICATION CHANGES 8807120400 880616 PDR ADOCK 05000313 P
PDC 1
j T ble 4.1-1 (Cont'd) l l
Channel Description Check Test Calibrate Remarks 20.
Reactor Building Spray System NA M(1)
NA (1) Including RB spray pump, System Logic Channels spray valves, and chem.
add. valve logic channels.
21.
Reactor Building Spray System l
Analog Channels a.
Reactor Building Pressure Channels NA M
R 22.
Pressurizer Temperature Channels S
NA R
23.
Control Rod Absolute Position S(1)
NA R
(1) Compare with Relative Position Indicator.
24.
Control Rod Relative Position S(1)
NA R
(1) Check with Absolute Position Indicator 25.
Core Flooding Tanks a.
Pressure Channels S
NA R
b.
Level Channels S
NA R
26.
Pressurizer Level Channels S
NA R
27.
Makeup Tank Level Channels D
NA R
28.
Radiation Monitoring Systems (1) Check functioning of self-checking other than containment high feature on each detector.
range monitors (item 57) a.
Process Monitoring System W
Q R
b.
Area Monitoring System W
M(1)
R 29.
High and Low Pressure Injection NA NA R
Systems:
Flow Channels l
.