ML20150C085

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation of Response to Generic Ltr 83-28, Item 2.1 Re Confirmation That Components Required to Trip Reactor Identified as safety-related on Documents Which Control safety-related Activity.Confirmation Acceptable
ML20150C085
Person / Time
Site: Point Beach  
Issue date: 06/21/1988
From: Wagner D
Office of Nuclear Reactor Regulation
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20150C088 List:
References
GL-83-28, TAC-52868, TAC-52869, NUDOCS 8807120305
Download: ML20150C085 (2)


Text

_.

g June 21, 1988 DISTRIBUTION:

80$cht!$(NN$il4RC PDRs PDIII-3 r/f KPerkins Docket Nos. 50-266 GHolahan PIreutzer and 50-301 DWagner OGC-WF1 EJordan BGrimes ACRS(10)

PDIII-3 Gray F.

Mr. C. W. Fay, Vice President Nuclear Power Department Wisconsin Electric Power Company 231 W. Michigan Street, Room 308 Milwaukee, Wisconsin 53201

Dear Mr. Fay:

SUBJECT:

GENERIC LETTER 83-28, ITEM 2.1, PART 1 (TAC 52869)

By letter dated November 7,1983, April 11,1986, and May 11, 1988, you responded to the requirements of Salem ATWS Item 2.1 (Part 1) of our Generic Letter 83-28 as related to Point Beach 1 and 2.

Based on our review of your responses, we find your confirmation that all components whose function is required to trip the reactor are identified as safety-related on documents which control safety-related activities, to be acceptable.

Our' Safety Evaluation documenting our review is enclosed.

Resolution of Item 2.1, Part 1, completes the review activity associated with TAC's 52868 and 52869.

Sincerely,

/s David H. Wagner, Project Manager Project Directorate III-3 Division of Reactor Projects - III, IV, V and Special Projects

Enclosure:

As stated cc:

See next page 8807120305 880621 PDR ADOCK 05000266 P

PDR II Office:

LA/PD 11-3 Pdl P

I-3 Surname: yye6 ker DWagner/vh DLashr KPerki s Date:

fo//f/88 6/9/88 C /po/88 h/q/88

/>._ /2elf 8r4thm N

G

i

  • {}

4 6-j Mr. C. W, Fay Point Beach Nuclear Plant Wisconsin Electric Power. Company Units 1 and 2 l

CC:

Mr. Bruce Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.

Washington, DC 20037 Mr. James J. Zach, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road

~Two Rivers, Wisconsin 54241 Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Chai rman Public Service Commission of Wisconsin l

Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Commissior.

Office of Executive Director i

for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 l

Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, Wisconsin 54241 l

l I