ML20150B937

From kanterella
Jump to navigation Jump to search
Forwards Draft Rev 5 to ES-601, Administration of NRC Requalification Program Evaluations. W/O Encl
ML20150B937
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/23/1988
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Simpkins R
TOLEDO EDISON CO.
References
NUDOCS 8807120251
Download: ML20150B937 (1)


Text

._

. .. l$NK3 my :mmmmmm$3 40cchetillo280-346 Toledo Edison Company Davis Besse Nuclear Power Station ATTN: _ Mr. Rick Simpkins Training Department 5501 N. State, Route 2 Oak Harbor, OH 43449

SUBJECT:

REQUALIFICATION EXAMINATIONS

Dear Mr. Simpkins:

Region III has completed a pilot requalification exam at the Perry facility utilizing the new requalification examination methodology.

In order to provide you with the latest, although~ not necessarily final, procedure and guidance on the requalification process the followino information is being provided for your information.

1. Draft of ES601 Rev 5 "Administration of NRC Requalification Program Evaluations".
2. Written Exam from Perry
3. Selected Simulator Scenarios from Perry i
4. Selected Job Performance Measures (JPM) from Perry.

If you have any questions on the present status of the' process please contact me at (312) 790-5695.

Sincerely,

.0RIGINAl. SIGHED Bt CE0FFREY C. WRIGHI Geoffrey C. Wright, Chief Operations Branch

Enclosures:

As stated -

cc w/ enclosures:

Davis Besse, SRI cc w/o enclosures: i R. DeFayette, DRP RIII g /mc 8807120251 890623 PDR V

ADOCK O$000346 PDC

[M