ML20150B937
| ML20150B937 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 06/23/1988 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Simpkins R TOLEDO EDISON CO. |
| References | |
| NUDOCS 8807120251 | |
| Download: ML20150B937 (1) | |
Text
._
l$NK3 my :mmmmmm$3 40cchetillo280-346 Toledo Edison Company Davis Besse Nuclear Power Station ATTN: _ Mr. Rick Simpkins Training Department 5501 N. State, Route 2 Oak Harbor, OH 43449
SUBJECT:
REQUALIFICATION EXAMINATIONS
Dear Mr. Simpkins:
Region III has completed a pilot requalification exam at the Perry facility utilizing the new requalification examination methodology.
In order to provide you with the latest, although~ not necessarily final, procedure and guidance on the requalification process the followino information is being provided for your information.
1.
Draft of ES601 Rev 5 "Administration of NRC Requalification Program Evaluations".
2.
Written Exam from Perry 3.
Selected Simulator Scenarios from Perry i
4.
Selected Job Performance Measures (JPM) from Perry.
If you have any questions on the present status of the' process please contact me at (312) 790-5695.
Sincerely,
.0RIGINAl. SIGHED Bt CE0FFREY C. WRIGHI Geoffrey C. Wright, Chief Operations Branch
Enclosures:
As stated cc w/ enclosures:
Davis Besse, SRI cc w/o enclosures:
i R. DeFayette, DRP RIII g /mc
[M 8807120251 890623 PDR ADOCK O$000346 V
--