ML20150B809
| ML20150B809 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 06/23/1988 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Shaffer T COMMONWEALTH EDISON CO. |
| References | |
| NUDOCS 8807120191 | |
| Download: ML20150B809 (1) | |
Text
.
JUN 2 81988 Docket No. 50-373 Docket No. 50-374 Commonwealth Edison Company-LaSalle County Station ATTN: Mr. Tim Shaffer Training' Department Route 1, Box 220 Marseilles, IL 61341
SUBJECT:
REQUALIFICATION EXAMINATIONS
Dear Mr. Shaffer:
Region III has completed a pilot-requalification exam at the Perry' facility utilizing the new requalification examination methodology.
In order to provide you with the latest, although not necessarily final,
~
procedure and guidance on the requalification process the following information-is being provided for you'r information.
1.
Draft of ES601 Rev 5 "Administration of NRC Requalification Program Evaluations".
2.
Written Exam from Perry 3.
Selected Simulator Scenarios from Perry j.
4.
Selected Job Performance Measures (JPM) from Perry.
If you have any questions on the present status of the process please contact -
me at (312) 790-5695.
Sincerely, DRIGINAL SIGHED AY GE0ffRIX C. WRIGNI Geoffrey C. Wright, Chief l
i Operations Branch f
Enclosures:
As stated 1
cc w/ enclosures:
LaSalle, SRI x w/o enclosures:
M. Ring, DRP o
III l }
/
/Wr 9 mc
'1 8807120191 880623 j'
c/
PDR ADOCK O'5000373 j'
V PDC a
.