ML20150B688
| ML20150B688 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/23/1988 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Bruno R WISCONSIN ELECTRIC POWER CO. |
| References | |
| NUDOCS 8807120122 | |
| Download: ML20150B688 (1) | |
Text
,
. $m
.g
~
s gt 3 3%% ',
e Docket No. 50-266 Docket No. 50-301 5
Wisconsin Electric Power Company Point Beach Nuclear Plant ATTN: -Mr. Ron Bruno Training Department 6610 Nuclear Road' Two Rivers, WI 54241
SUBJECT:
REQUALIFICATION EXAMINATIONS
Dear Mr. Bruno:
Region III has completed a pilot requalification exam at the Perry facility utilizing the new requalification examination methodology.
In order to provide you with the latest, although not necessarily final, procedure and guidance on the requalification process the.following information is being provided for your infonnation.
1.
Draft of ES601 Rev 5 "Administration of NRC Requalificatien Program Evaluations".
2.
Written Exam from Perry 3.
Selected Simulator Scenarios from Perry 4.
Selected Job Performance Measures (JPM) from Perry.
If you have any questions on the present status of the process please contact me at (312) 790-5695.
1 Sincerely, ORIGINAL. S;GNED BY GE0ffREE G,.,WRIGHI.
I Geoffrey C. Wright, Chief Operations Branch
Enclosures:
As stated cc w/ enclosures:
Point Beach, SRI cc w/o enclosures:
R. DeFayette DRP h!II
!W g t/mc P"mas sgugg.
qsf C
-