ML20150B676
| ML20150B676 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 06/23/1988 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Amundson T NORTHERN STATES POWER CO. |
| References | |
| NUDOCS 8807120115 | |
| Download: ML20150B676 (1) | |
Text
.
Y, e
^
OUN 2 3 1968 Docket No. 50-282 Docket-No. 50-306 Northern States Power Company Prairie Island Nuclear Generating. Plant ATTN: Mr. T.'Amundson Training Department 1717 Wakonade Drive East-Welch', MN 55089
SUBJECT:
REQUALIFICATION EXAMINATIONS
Dear Mr. Amundson:
Region III has completed a pilot requalification exam at the Perry facility ~
utilizing the new requalification examination methodology.
In order to provide you with the latest, although not necessarily final, procedure and guidance on the requalification process the following information is being provided for your information.
1.-
Draft of ES601 Rev 5 "Administration of NRC Requalification Pregram Evaluations";
2.
Writti,n Exam from Perry 3.
Selected Simulator Scenarios from Perry 4.
Selected Job Performance Measures (JPM) from Perry.
If you have any questions on the present status of tha process please contact meat (312)790-5695.
Sincerely,
.0RIGINAL SIGNED 81 GE0EEREY C. ERlGNI Geoffrey C. Wright, Chief a
Operations Branch
Enclosures:
As stated cc w/ enclosures:
i Prairie, SRI l
l cc w/o enclosures:
R. DeFayette, DRP i
1 Wright /mc 1
3 8807120115 880623
~
((- ha PDR ADOCK 05000282 I
V PDC 4
,