ML20150B647

From kanterella
Jump to navigation Jump to search
Forwards Draft Rev 5 to ES-601, Administration of NRC Requalification Program Evaluations. W/O Encl
ML20150B647
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 06/23/1988
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Ockert A
COMMONWEALTH EDISON CO.
References
NUDOCS 8807120103
Download: ML20150B647 (1)


Text

.

' pgi

~

JUN 2 81988

. Docket No. 50-295 Docket No. 50-304 Commonwealth Edison Company-Zion ~ Generating Station

. ATTN: Mr. Al J. Ockert Training Department 101 Shiloh Boulevard Zion, IL 60099

SUBJECT:

.REQUALIFICATION EXAMINATIONS

Dear Mr. Ockert:

Region III has completed a pilot requalification exam at the Perry facility utilizing the new requalification examination methodology.

In order to provide you with the. latest, although not necessarily final, procedure and guidance on the requalification process the following information is being provided for your information.

1.

Draft of ES601 Rev 5 "Administration of NRC Requalification. Program Evaluations".

5 2.

Written Exam from Perry 3.

Selected Simulator Scenarios from Perry 4.

Selected Job Performance Measures (JPM) from Perry.

If you have any questions on the present status of the process please contact meat (312)790-5695.

Sincerely, DRIGlyd. SJGNED 81 GE0tBEY C. WRIGHI Geoffrey C. Wright, Chief 1

Operations Branch

Enclosures:

As stated cc w/ enclosures:

Zion, SRI cc w/o enclosures:

J. Hinds, DRP RIII J

/mc y,@@71$$$$h5

[$

~

V

.