ML20150B647
| ML20150B647 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 06/23/1988 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Ockert A COMMONWEALTH EDISON CO. |
| References | |
| NUDOCS 8807120103 | |
| Download: ML20150B647 (1) | |
Text
.
' pgi
~
JUN 2 81988
. Docket No. 50-295 Docket No. 50-304 Commonwealth Edison Company-Zion ~ Generating Station
. ATTN: Mr. Al J. Ockert Training Department 101 Shiloh Boulevard Zion, IL 60099
SUBJECT:
.REQUALIFICATION EXAMINATIONS
Dear Mr. Ockert:
Region III has completed a pilot requalification exam at the Perry facility utilizing the new requalification examination methodology.
In order to provide you with the. latest, although not necessarily final, procedure and guidance on the requalification process the following information is being provided for your information.
1.
Draft of ES601 Rev 5 "Administration of NRC Requalification. Program Evaluations".
5 2.
Written Exam from Perry 3.
Selected Simulator Scenarios from Perry 4.
Selected Job Performance Measures (JPM) from Perry.
If you have any questions on the present status of the process please contact meat (312)790-5695.
Sincerely, DRIGlyd. SJGNED 81 GE0tBEY C. WRIGHI Geoffrey C. Wright, Chief 1
Operations Branch
Enclosures:
As stated cc w/ enclosures:
Zion, SRI cc w/o enclosures:
J. Hinds, DRP RIII J
/mc y,@@71$$$$h5
[$
~
V
.