ML20150B635
| ML20150B635 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 06/23/1988 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Chernick A COMMONWEALTH EDISON CO. |
| References | |
| NUDOCS 8807120095 | |
| Download: ML20150B635 (1) | |
Text
.
, o w
(
g JUN 23 &
Docket No. 50-454 Docket No. 50-455 Commonwealth Edison Company Byron Nuclear Station ATTN: Mr. Allen J. Chernick Training Department 4450 N. German C arch Road
~
Byroi.. IL 61010
SUBJECT:
REQUALIFICATION EXAMINATIONS Dear Mr. Chernick.-
1 Region III has completed a pilot requalification exam at the Perry facility utilizing the new requalification examination methodology.
In order to provide you with the latest, although--not necessarily final, procedure and guidance on the requalification process the following ir. formation is being provided for your infonnatic 1.
Draft of ES601 Rev 5 "Administration of NRC Requalification Program Evaluations".
2.
Written Exam from Perry 3.
Selected Simulator Scenarios from Perry I
4.
Selected Job Performance Measures-(JDM) from Perry.
If you have any questions on the present status of the process please cont 6ct me at (312) 790-5695.
Sincerely,
.f ORIGINAL. SIGNED E GE0ifRO' O. WRiciit Geoffrey C. Wright, Chief Operations Branch
Enclosures:
As stated 4
cc w/ enclosures:
Byron, SRI cc w/o enclosures:
J. Hinds, DRP yIII j$t Wri ht/mc 8607120095 880623 gd4 DR ADOCK 0500 4
..