ML20150B594
| ML20150B594 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/23/1988 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Neterer D UNION ELECTRIC CO. |
| References | |
| NUDOCS 8807120082 | |
| Download: ML20150B594 (1) | |
Text
..
l, -
w D 2 3:.1988 Docket No. 50-483 Union Electric Company Callaway Plant ATTN: Mr. David Neterer Training Department P. O. Box-620 Fulton, M0 65251
SUBJECT:
REQUALIFICATION EXAMINATIONS.
Dear Mr. Neterer:
- Region II_I has completed a pilot requalification exam at the Perry facility' utilizing the new requalification examination. methodology.
In order to provide you with the latest, although not necessarily' final, procedure and guidance on the requalification process the following information is being provided for your information.
I 7
1.
Draft of ES601 Rev 5 "Administration of NRC Requalification Program Evaluations".
2.
Written Exam from Perry 3.
Selected Simulator Scenarios from Perry Selected Job Performance Measures (JPM) from Perry.
4.
e If you have any questions on the present status of the process please contact me at (312) 790-5695.
Sincerely, Original Signed By T. H. Burdick Geoffrey C. Wright, Chief Operations Branch Enclosuras: As stated i
cc w/ enclosures:
Callaway, SRI l
cc w/o enclosures:
R. DeFayette, DRP i
"hM 96/h l Wright /mc 8807120002 880623 0
PDR ADOCK 05000483 6
V PDC
/
n
.i