ML20150B594

From kanterella
Jump to navigation Jump to search
Forwards Draft Rev 5 to ES-601, Administration of NRC Requalification Program Evaluations. W/O Encl
ML20150B594
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/23/1988
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Neterer D
UNION ELECTRIC CO.
References
NUDOCS 8807120082
Download: ML20150B594 (1)


Text

. . .. , , ,

w l, -

D 2 3:.1988 .

Docket No. 50-483 Union Electric Company Callaway Plant ATTN: Mr. David Neterer Training Department ,

P. O. Box-620 Fulton, M0 65251

SUBJECT:

REQUALIFICATION EXAMINATIONS.

Dear Mr. Neterer:

- Region II_I has completed a pilot requalification exam at the Perry facility' utilizing the new requalification examination. methodology.

In order to provide you with the latest, although not necessarily' final, procedure and guidance on the requalification process the following information  ;

7 is being provided for your information. I

1. Draft of ES601 Rev 5 "Administration of NRC Requalification Program  :

. Evaluations". ,

2. Written Exam from Perry
3. Selected Simulator Scenarios from Perry
4. Selected Job Performance Measures (JPM) from Perry.

e If you have any questions on the present status of the process please contact me at (312) 790-5695.

Sincerely, Original Signed By T. H. Burdick Geoffrey C. Wright, Chief Operations Branch Enclosuras: As stated ,

i cc w/ enclosures:

Callaway, SRI l cc w/o enclosures: -

R. DeFayette, DRP i

"hM Wright /mc 8807120002 880623 696/h l 0 l PDR ADOCK 05000483 / - l V PDC n  :

.i