ML20150B590

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-245/88-02 on 880101-0208.No Violations Noted.Rept Discusses Three Incidents Attributable to Failure to Follow Established Procedures.No Enforcement Will Be Taken
ML20150B590
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/04/1988
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20150B592 List:
References
NUDOCS 8803170069
Download: ML20150B590 (2)


See also: IR 05000245/1988002

Text

-

.

.

..- . - - - -

-

--

--

.-

-,

,e

'

W e 4 1988

Docket No. 50-245

Northeast Nuclear Energy Company

ATTN: Mr. Edward J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject:

Resident Inspection 50-245/88-02 (1/1/88 to 2/8/88)

This refers to the above subject inspection of Millstone Unit 1 by Mr. W. Raymond

and Ms. L. Kolonauski of this office.

The inspection findings are described in

the enclosed report and were discussed with Mr. J. Stetz of your staff. No viola-

tions were cited, and no reply tu this letter is required.

One matter which may require additional management attention is procedural adher-

ence. This report discusses three separate incidents attributable to failure to

follow established procedures (Sections 7.0 through 9.0).

Although no enforcement

action has been taken because the licensee identified and reported the events in

accordance with the requirements of the regulations and took appropriate and timely

corrective actions, procedural adherence is important and will receive additional

inspection attention.

Your cooperation with us is appreciated.

Sincerely,

i

wiginal Sipmi 30

g ,g,sette s e n

Lee H. Bettenhausen, Chief

Projects Branch No. 1

Division of Reactor Projects

f

Enclosure: NRC Region I Insrection Report No. 50-245/88-02

cc w/ encl:

W. D. Romberg, Vice President, Nuclear Operations

S. E. Scace, Station Superintendent

,

D. O. Nordquist, Manager of Quality Assurance

R. M. Kacich, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Public Documert Room (PDR)

'

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

'

NRC Resident Inspector

State of Connecticut

1

0FFICIAL RECORD COPY

DL50-245/88-02 - 0001,0.0

8803170069 880304

02/29/88

\\

PDR

ADOCK 05000245

O

PDR

l

l ll

,

w

o

,

Neiineast Nuclear Energy Company

2

M 0 41988

.

bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

J. Shediosky, SRI, Haddam Neck

W. Raymond, SRI, Millstone 1,2&3

M. Boyle, DRSS

M. Shanbaky, DRSS

P. Bisset, DRS

L. Prividy, DRS

R. Sur.mers, DRP

H. Williams, DRP (See Detail 5.1)

R. Keimig, DRSS (See Detail 5)

J. Strosnider, DRS (See Detail 6)

l

N?

RI:DRP

RI:DRP

,

-

d ir

Raymond/meo

cCa

Betpenpgusen

i

7/d/'d

2/29/88

3///rf

h

(h

1N

OFFICIAL RECORD COPY

DL50-245/88-02 - 0002.0.0

02/29/88