ML20150B580

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-313/88-18 & 50-368/88-18 on 880523- 27.No Violations or Deviations Noted
ML20150B580
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 07/05/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20150B582 List:
References
NUDOCS 8807120079
Download: ML20150B580 (2)


See also: IR 05000313/1988018

Text

.

_.

.

_.

_

__ _ _ . _ .

.

. . _

.__

-

.-

.

,

,.

A 2 5'M

--

"

,

In Reply Refer To:

Dockets:

50-313/88-18

50-368/88-18

,

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

Vice President, Nuclear

i

Operations

-

P.O. Box 551

Little Rock, Arkansas 72203

'

Gentlemen:

i

This refers to the inspection conducted by.Mr. H. D. Chaney of this office

during the period May 23-27, 1988, of. activities authorized by NRC Operating

'

Licenses OPR-51 and NPF-5 for Arkansas Nuclear One, Units 1 and 2, and to the

.

discussion of our findings with Mr. J. M. Levine and other members of your

l

,

staff at the conclusion of the inspection.

Areas examined during the inspection included the transportation of radioactive

l

materials, low-level solid radioactive waste management,-and gaseous and liquid

l

radioactive waste releases. Within these areas, the inspection consisted of-

selective examination of procedures and representative records, interviews with

f

~

personnel, and observations by the NRC inspector.

The inspection findings are

documented in the enclosed inspection report.

,

Within the scope of the inspection, no violations or deviations were

-

!

identified.

<

We have also examined actions you have taken with regard to pr'eviously

identified inspection findings.

The status of these items is identified.in

l

paragraph 3 of the enclosed report.

!

Should you have any questions concerning this inspection, we will be pleased to

.

discuss them with you.

-i

,

Sincerely, .

j

Original Signed By

L. J. Callan ~

-

L. J. Callan,-Director

l

Division of Reactor Projects

.

Enclosure:

(see next page)

'

!

RIV:FRPS:

C:FRPS:R

C:RPB

C:DRP/A

D:DRf 4 -

HDChaney:g

REBaer

BMurra

'DOChamte .ainf!) Callan

\\q / /88

7 / g /88

'l/t/88

(p88

(o / 0/88

3

g

i

!

i

8807120079 880705

PDR

ADOCK 05000313

!

O

PNU

f 6 d

+

.

-

-

.

.

.

,

,

.

Arkansas Power & Light Company

-2-

Enclosure:

Appendix - NRC Inspection R? port

50-313/88-18

.

50-368/88-18

cc w/ enclosure:

Arkansas Nuclear One

ATTH:

J. M. Levine, Director

Site Nuclear Operations

P.O. Box 608

Russellville, Arkansas 72801'

Arkansas Radiation Control Program Director

bcc to DMB (IE06)

bcc distrib. by RIV:

  • RRI

R. D. Martin, RA

'

  • RPSB-DRSS
  • Section Chief (DRP/A)

Lisa Shea, RM/ALF

  • RIV File
  • DRP
  • MIS System
  • RSTS Operator
  • Project Engineer, DRP/A
  • G. Dick, NRR Project Manager
  • DRS
  • H.

D. Chaney

G. F. Sanborn, E0

  • R. E. Baer
  • B. Murray

R. L. Bangart

J. White, RI

  • w/766

,

l

,

J